You are on page 1of 10
pF NO Ss % PENETRANT LIQUID CONTROL z % TEST REPORT | DE a 2 CALIDAD i @ REPORTE : PT-001 PERU | VIGENCIA :2019 CUSTOMER : TERMOFUSION PERU SAC PROJECT: BRIDA DE ACOPLE PARA PRUEBA HIDROSTATICA DATA OF THE EQUIPMENT OR INSPECTED COMPONENT ICODE + BRIDA DIAMETER: 4” DATE DE INSPECTION: 26/12/2019 THICKNESS : 1/2" PROCESS : SMAW REPORT NY : 002 MATERIAL: ASTMA-GrB INSPECTION : 100% PAGE: :01 DATA OF THE TEST PRE EXAMINATION Surface Preparation: EQUIPMENT DYE-CHECK- REMOVER: Instrument Make: PENETRANT.2 DEVELOPER. | METHOD OF INSPECTION | Dry: AGENTE VISIBLE | REMOSION POR SOLVENTE POST EXAMINATION Cleaning (# Required): NIA ‘CODE OF PROCEDURE: CODE OF INSPECTION: ASME B31.3 IDENTIFICATION | Type and location of discontinuities (em) | a= TAR J Sin Discontinuidades Relevantes. | SI a? porosity ineaiod slag inclusions De Penstration ‘Bc: Aislated stag inclusion ‘Longitudinal Crack F : Undercut ‘Ba : Orientation instructions and varied form Lack of fusion Eb: Traneversal Crack ‘Total Juntas : 04 Manufacturer or Contractor: - Inspector —_: DAVID CHIRA 5-_| Authorized by: TERMO FUSION SAC Level : NIVEL tl Spetoarevaset p>? ROL, REPORTE : PT-001 PERU | VIGENCIA :2019 CUSTOMER : TERMOFUSION PERU SAC PROJECT _: BRIDA DE ACOPLE PARA PRUESA HIDROSTATICA DATA OF THE EQUIPMENT OR INSPECTED COMPONENT Ss % PENETRANT LIQUID CONTROL = % TEST REPORT 1 DE g Ss CALIDAD % & CODE + BRIDA DIAMETER: 6” DATE DE INSPECTION: 21/12/2019 CKNESS : 1,114! PROCESS : SMAW REPORTN' : 001 MATERIAL; ASTMA-GrB INSPECTION : 100% PAGE: :01 DATA OF THE TEST PRE EXAMINATION Surface Preparation: EQUIPMENT DYE-CHECK- REMOVER: 4-3 | Instrument Make: PENETRANT.2 DEVELOPER.4 METHOD OF INSPECTION Dry: AGENTE VISIBLE | REMOSION POR SOLVENTE POST EXAMINATION | Cleaning (Hf Roquirod): NIA ‘CODE OF PROCEDURE: ‘CODE OF INSPECTION: ASME B31.3 IDENTIFICATION | Type and location of discontinuities (em) | scr rer Remarks Jt Sin Discontinuidades Relevantes. | Si | ‘Bb: Alineated slag inclusions D+ ndadecuste Penatration Bc: Aislated stag inclusion Ea : Longitudinal Crack Ba: Orientation instructions and varied form Lack of fusion Eb : Transversal Crack [Total Juntas +: 01 Inspector: DAVID CHIRA 8. Level + NIVEL ave Manufacturer or Contractor: Authorized by: TERMO FUSION SAG ,P! Roy sa ey PENETRANT LIQUID CONTROL 2 g TEST REPORT DE a s CALIDAD % & REPORTE : PT-001 PERU LL VIGENCIA :2019 CUSTOMER : TERMOFUSION PERU SAC PROJECT; BRIDA DEACOPLE PARA PRUEBA HIDROSTATICA DATA OF THE EQUIPMENT OR INSPECTED COMPONENT CODE =: BRIDA DIAMETER: 4" DATE DE INSPECTION: 26/12/2019 THICKNESS : 1/2" PROCESS : SMAW REPORTN? : 001 MATERIAL: ASTMA-GrB INSPECTION : 100% PAGE: _:01 DATA OF THE TEST PRE EXAMINATION Surface Preparation: EQUIPMENT DYE-CHECK- REMOVER: 1-3 Instrument Make: PENETRANT.2 DEVELOPER. | METHOD OF INSPECTION aul Dry: AGENTE VISIBLE | REMOSION POR SOLVENTE POST EXAMINATION Cleaning (if Required): NIA CODE OF PROCEDURI CODE OF INSPECTION: ASME B31.3, | IDENTIFIGATION | Type andlocation of discontinuities (om) | sro Team Remarks Jet ‘Sin Discontinuidades Relevantes. SL ACEPTADO fas poresiy 1D Indadecuata Penetration Bc: Aislated slag Inclusion Ea : Longitudinal Crack F : Undercut Ba: Orientation instructions and varied form Lack of fusion Eb : Transversal Crack Manufacturer or Contractor: Authorized by: TERMO FUSION SAC Total Juntas : 01 Inspector —_: DAVID CHIRA Si Level : NIVEL Wl et s % PENETRANT LIQUID CONTROL = e TEST REPORT DE a g | CALIDAD i e | REPORTE : PT-001 VIGENCIA :2019 CUSTOMER: TERMOFUSION PERU SAC PROJECT _: BRIDA DE ACOPLE PARA PRUEBA HIDROSTATICA DATA OF THE EQUIPMENT OR INSPECTED COMPONENT CODE =: BRIDA DIAMETER: 6” DATE DE INSPECTION: 24/12/2019 THICKNESS : 4.116" PROCESS : SMAW REPORT? 002 MATERIAL: ASTMA-GrB INSPECTION : 100% PAGE: :01 DATA OF THE TEST PRE EXAMINATION Surface Preparation: Pkt | | | | EQUIPMENT DYE-CHECK- REMOVER: 1-3 Instrument Make: PENETRANT.2 DEVELOPER.A| WETHOD OF INSPECTION Diy: AGENTE VISIBLE / REMOSION POR SOLVENTE POST EXAMINATION leaning (Required): NIA ‘CODE OF PROCEDURE: CODE OF INSPECTION: ASME B31.3 IDENTIFICATION | Type and location of discontinuities (cm) | acerreo era Remarks: Jt | Sin Discontinuidades Relevantes. | SI ‘ACEPTADO Rat porosity Ebi Alinoated slag inclusions: 7 Indadecuate Ponairaion Be: Aistated stag inclusion Ea: Longitudinal Crack F : Undercut Ba: Orientation instructions and varied form © C: Lackof fusion Eb: Transversal Crack [Total Juntas : 07 Inspector _: DAVID CHIRA S... Level 2 NIVEL I ‘Manufacturer or Contractor: ‘Authorized by: TERMO FUSION SAC ey, 3 £ & PENETRANT LIQUID CONTROL Zz a TEST REPORT DE a s CALIDAD & a REPORTE : PT-001 PERU VIGENCIA :2019 CUSTOMER : TERMOFUSION PERU SAC PROJECT _: BRIDA DE ACOPLE PARA PRUEBA HIDROSTATICA DATA OF THE EQUIPMENT OR INSPECTED COMPONENT |CODE BRIDA DIAMETER: 4” DATE DE INSPECTION: 26/12/2019 |THICKNESS : 1.1/4" PROCESS : SMAW REPORT N® MATERIAL ASTM A: GrB INSPECTION : 100% PAGE: =: 01 DATA OF THE TEST " PRE EXAMINATION ‘Surface Preparation: & EQUIPMENT DYE-CHECK- REMOVER: 1-3 Instrument Make: PENETRANT.2_DEVELOPER4 METHOD OF INSPECTION Dry: AGENTE VISIBLE | REMOSION POR SOLVENTE POST EXAMINATION Cleaning if Required): NIA CODE OF PROCEDURE: CODE OF INSPECTION: ASME B31.3 IDENTIFICATION | Type and location of discontinuities om) | «== sera J Sin Discontinuidades Relevantes. si L L L ineated siag inclusions D = Indadecuate Penetration Longitudinal Crack F : Undereut Lack of fusion Eb: Transversal Crack ‘a porosity — Be: Aistated stag inclusion ‘Ba : Orientation instructions and varied form Inspector: DAVIDCHIRAS. BA g ‘Authorized by: TERMO FUSION SAC Level : NIVEL I ‘Total Juntas : 01 wh _|Manufacturer or Contractor: ge NOx, & %, PENETRANT LIQUID | CONTROL x a TEST REPORT | DE g iS | CALIDAD % & | | REPORTE : PT-001 PERU VIGENCIA :2019 ‘CUSTOMER : TERMOFUSION PERU SAC PROJECT _: BRIDA DE ACOPLE PARA PRUEBA HIDROSTATICA DATA OF THE EQUIPMENT OR INSPECTED COMPONENT ICODE BRIDA DIAMETER: 8” DATE DE INSPECTION: 26/12/2019 THICKNESS : 1.114" PROCESS : SMAW REPORT N* MATERIAL: ASTMA-GrB INSPECTION : 100% PAGE: :01 DATA OF THE TEST . PRE EXAMINATION ‘J Surface Props EQUIPMENT DYE-CHECK- REMOVER: Instrument Make: PENETRANT.2_ DEVELOPER. METHOD OF INSPECTION Dry: AGENTE VISIBLE / REMOSION POR SOLVENTE : POST EXAMINATION : ‘ Cleaning (if Required): NIA es z 4 CODE OF PROCEDURE: CODE OF INSPECTION: ASME B31.3 IDENTIFICATION | Type and location of discontinuities (cm) | Ac" OAR Remarks J Sin Discontinuldades Relevantes. | SI ‘ACEPTADO L see, D+ Indadecuate Penetration F : Undercut Eb: Transversal Crack ‘ha: porosity ‘Bo: Alslated slag Inclusion Ba : Orientation instructions and varied form Total Juntas : 01 Inspector _: DAVID CHIRA S. ‘DAIGAGASPREZ” | Authorized by: TERMO FUSION SAC Level : NIVEL WU PENETRANT LIQUID CONTROL TEST REPORT DE CALIDAD REPORTE : PT-001 VIGENCIA :2019 DATA OF THE EQUIPMENT OR INSPECTED COMPONENT DIAMETER: 10” DATE DE INSPECTION: 26/12/2019 PROCESS: SMAW REPORT N® 1002 INSPECTION : 100% PAGE: :01 DATA OF THE TEST (i PRE EXAMINATION ‘Surface Prepara EQUIPMENT DYE-CHECK- REMOVER: Instrument Make: PENETRANT.2 DEVELOPER METHOD OF INSPECTION aS Dry: AGENTE VISIBLE / REMOSION POR SOLVENTE POST EXAMINATION Cleaning (Required): NIA CODE OF PROCEDURE: CODE OF INSPECTION: ASME B31.3 IDENTIFICATION | Type and location of discontinuities (cm) HH Sin Discontinuidades Relevantes. L L 'Bb: Alineated slag inclusions ‘Bet Aislated elag inclusion Ea: Longitudinal Crack Ba : Orientation instructions and varied form C: Lack of fusion [Total Juntas : 01 Inspector: DAVID CHIRA'S. “iii Level : NIVEL Wl PENETRANT LIQUID CONTROL TEST REPORT | DE CALIDAD REPORTE : PT-001 PERU VIGENCIA :2019 ‘CUSTOMER : TERMOFUSION PERU SAC PROJECT _: BRIDA DEACOPLE PARA PRUEBA HIDROSTATICA DATA OF THE EQUIPMENT OR INSPECTED COMPONENT CODE : BRIDA DIAMETER: 8” DATE DE INSPECTION: 26/12/2019 THICKNESS ; 1.1/4” PROCESS : SMAW REPORTN® : 007 | MATERIAL \STM A- GrB INSPECTION : 100% PAGE: :01 DATA OF THE TEST i Re PRE EXAMINATION = ‘ Surface Preparatior i EQUIPMENT DYE-CHECK- REMOVER: 1-3 = Instrument Make: PENETRANT.2 DEVELOPER.4 METHOD OF INSPECTION iF = « Dry: AGENTE VISIBLE | REMOSION POR SOLVENTE e. POST EXAMINATION 66> =e Cleaning (If Required): NIA a A CODE OF PROCEDURE: CODE OF INSPECTION: ASME B31.3 (TERN, x 2 “ IDENTIFICATION | Type and_location of discontinuities (em) | «= Tar Remarks J2 ‘Sin Discontinuidades Relevantes. | SI ‘ACEPTADO, L = 1 L L = porosity ‘Bb: Alineated slag inclusions: D = Indadecuate Penetration Be: Alslated slag Inclusion Ea: Longitudinal Crack F : Undercut Ba: Orientation instructions and varied form ©: Lack of fusion Eb : Transversal Grack A a [Total Juntas : 07 [Manufacturer or Contractor: Inspector: DAVID CHIRA S. "| Authorized by: TERMO FUSION SAC Level : NIVEL tl PENETRANT LIQUID CONTROL TEST REPORT DE CALIDAD REPORTE : PT-001 VIGENCIA :2019 CUSTOMER : TERMOFUSION PERU SAC PROJECT _: BRIDA DE ACOPLE PARA PRUEBA HIDROSTATICA DATA OF THE EQUIPMENT OR INSPECTED COMPONENT [cove + BRIDA DIAMETER: 10” DATE DE INSPECTION: 26/12/2019 THICKNESS : 1.114” PROCESS : SMAW REPORT N® : 003 MATERIAL: ASTMA-GrB INSPECTION : 100% DATA OF THE TEST PRE EXAMINATION METHOD OF INSPECTION Dry: AGENTE VISIBLE | REMOSION POR SOLVENTE POST EXAMINATION Cleaning (If Required): NIA ‘CODE OF PROCEDURE: CODE OF INSPECTION: ASME B31.3 IDENTIFICATION | Type and location of discontinuities (cm) ‘ACEPTADO J2 Sin Discontinuidades Relevantes. L L L L 'Bb: Alineated slag inclusions 7 Indadecuate Penetration Ea: Longitudinal Crack Undercut €: Lack of fusion 1 Transversal Crack 1a: Orientation instructions and varied form | Manufacturer or Gontractor: Authorized by: TERMO FUSION SAC [Total Juntas : 01 Inspector _: DAVID CHIRAS. Level : NIVEL Il PENETRANT LIQUID CONTROL TEST REPORT DE CALIDAD REPORTE : PT-001 VIGENCIA :2019 CUSTOMER : TERMOFUSION PERU SAC PROJECT :BRIDA DE ACOPLE PARA PRUEBA HIDROSTATICA DATA OF THE EQUIPMENT OR INSPECTED COMPONENT + BRIDA DIAMETER: 6” DATE DE INSPECTION: 26/12/2019 : 1a PROCESS : SMAW REPORTN' : 005 1 ASTMA-GrB INSPECTION : 100% PAGE: :01 DATA OF THE TEST PRE EXAMINATION Surface Preparat as ~~ EQUIPMENT DYE-CHECK- REMOVER: Instrument Make: _PENETRANT.2 DEVELOPER. METHOD OF INSPECTION Dry: AGENTE VISIBLE / REMOSION POR SOLVENTE POST EXAMINATION Cleaning (f Required): NIA CODE OF PROCEDURE: CODE OF INSPECTION: ASME B31.3 IDENTIFICATION | Type and location of discontinuities (om) Remarks ra ‘Sin Discontinuidades Relevantes. ‘ACEPTADO i L 1 L ‘Ra porosity ineated slag inclusions Be: Aislated slag inclusion ‘Ba : Orlentation instructions and varied form. Lack of fusion Total Juntas : 07 [Manufacturer or Contractor: Inspector: DAVID CHIRA S. Authorized by: TERMO FUSION SAC Level : NIVEL tt

You might also like