HYDRAULICS ENGINEERING
pemoto's muuase
1. Gude ol having @ dest of 856 kgm! and dinar
“coityo10.072 Fa Novatteugh adore charter poe
GFevale of0-24 ms Hrd ho Royals mumoee
Bone a tos
Shain Apleehasa damsteof 20 mm and alerathot
faim: Alaidhang atinamate cost af ¢
Tosmesi towing Ihe pps at avaoety eS
ms
2 Colevaie he Reynolds Humber
on Nee 10
salve the ton factor“
4 comeute the hecdiass af poe
B Tvem oem
PIPE NeMORKS
hvaion 2 panes 1,2 ond 3 ate connected peal
fc" ine. ihe thes inst comy 9 combined
Sechome ote me
Feo_|tongin | biamoiar | Fisfonasior
[zoom | ~soo me Bee
5 Detemine th rate of ow inning
assem es ner mes
Bozeman
ee Gigzimie e— Onbeeme
B Gasman mn
7. Caleuatae et of tow i pipaine 3
eons ne. Osisemys
Bo Graeme = amis
ston: Treo cancels pipes re connected ist 0,
thoom. tthe rate of tow bbw poe 10m
4 2 3
=360m
float” Ream.
Soke the tlatneadoss of he pip,
% Compute thelanath at a200 mm dameter squalor pip,
Bear ao vaziem
10 ofa 1240 m long equvalert pips
iam
stucon metow tata ‘ornepipe stems cosors ih
i Tanai ‘Diamar
7 om 2m
1, Fad he head atin pipe 2
a 836m «28m
12, Caste the at of ow npineine 3
bare Pe ones ms
Babies kas
13, save the ameter of sine 3
BBB S| 2215mm