You are on page 1of 1
HYDRAULICS ENGINEERING pemoto's muuase 1. Gude ol having @ dest of 856 kgm! and dinar “coityo10.072 Fa Novatteugh adore charter poe GFevale of0-24 ms Hrd ho Royals mumoee Bone a tos Shain Apleehasa damsteof 20 mm and alerathot faim: Alaidhang atinamate cost af ¢ Tosmesi towing Ihe pps at avaoety eS ms 2 Colevaie he Reynolds Humber on Nee 10 salve the ton factor“ 4 comeute the hecdiass af poe B Tvem oem PIPE NeMORKS hvaion 2 panes 1,2 ond 3 ate connected peal fc" ine. ihe thes inst comy 9 combined Sechome ote me Feo_|tongin | biamoiar | Fisfonasior [zoom | ~soo me Bee 5 Detemine th rate of ow inning assem es ner mes Bozeman ee Gigzimie e— Onbeeme B Gasman mn 7. Caleuatae et of tow i pipaine 3 eons ne. Osisemys Bo Graeme = amis ston: Treo cancels pipes re connected ist 0, thoom. tthe rate of tow bbw poe 10m 4 2 3 =360m float” Ream. Soke the tlatneadoss of he pip, % Compute thelanath at a200 mm dameter squalor pip, Bear ao vaziem 10 ofa 1240 m long equvalert pips iam stucon metow tata ‘ornepipe stems cosors ih i Tanai ‘Diamar 7 om 2m 1, Fad he head atin pipe 2 a 836m «28m 12, Caste the at of ow npineine 3 bare Pe ones ms Babies kas 13, save the ameter of sine 3 BBB S| 2215mm

You might also like