Laporan RPS 2018
Laporan RPS 2018
374,805,630
Resume :
Biaya Pekerjaan Konstruksi 275,160,000
Biaya Perencanaan dan Pengawasan 13,757,000
Biaya Pengelolaan Administrasi 2,751,000
Jumlah Biaya Yang Dikeluarkan 291,668,000
0.3%
0.2%
0.3%
0.8%
0.4%
3.4%
5.40% 8,920,000
1.2%
1.4%
1.5%
4.10% 2,976,000
7.5%
7.48% 1,006,000
7.7%
2.3%
10.8%
3.8%
2.4%
27.09% 10,286,000
21.17% 8,710,000 21.2%
3.5%
6.1%
9.64% 17,493,000
0.3%
2.6%
0.7%
1.6%
0.4%
5.62% 2,525,000
5.76% 6,550,000 5.8%
5 KOLOM SUDUT 40 x 40 BH 1
Cor Beton 1 : 2 : 3 m 3
0.56
6.60 PC sak 3.70 54,000 200,000
0.55 pasir beton m3 0.31 300,000 92,000
0.82 Split m3 0.46 300,000 138,000
alat bantu m3 0.56 25,000 14,000
Tenaga m3 0.56 300,000 168,000
Pembesian 102 kg/m3
6 KOLOM 30 x 40 BH 1
Cor Beton 1 : 2 : 3 m 3
0.42
6.60 PC sak 2.77 54,000 150,000
0.55 pasir beton m 3
0.23 300,000 69,000
0.82 Split m3 0.34 300,000 103,000
alat bantu m3 0.42 25,000 11,000
Tenaga m 3
0.42 350,000 147,000
Pembesian 116 kg/m3
7 KOLOM 30 x 30 /Selasar BH 1
Cor Beton 1 : 2 : 3 m3 0.32
6.60 PC sak 2.08 54,000 112,000
0.55 pasir beton m3 0.17 300,000 52,000
0.82 Split m3 0.26 300,000 77,000
alat bantu m3 0.32 25,000 8,000
Tenaga m3 0.32 350,000 110,000
Pembesian 105 kg/m3
12 PASANGAN BATA 1 : 4 m2 1
84 Batubata bh 72.00 450 32,400
0.2 Semen sak 0.20 54,000 10,800
0.032 Pasir m3 0.03 300,000 9,600
Alat Bantu m2 1 1,000 1,000
Tenaga m2 1 40,000 40,000
JUMLAH PEKERJAAN PASANGAN BATA 53,800 40,000 93,800
PEKERJAAN
PLESTERANPLAFON
DAN ACIAN m2 1
Holoow 2/4 btg 0.15 21,000 3,000
Hollow 4/4 btg 1 27,000 27,000
Triplek 3 mm btg 0.5 56,000 28,000
Alat Bantu m2 1 12500 13,000
Tenaga Kerja m2 1 50,000 50,000
JUMLAH PEKERJAAN PLESTERAN DAN ACIAN 71,000 50,000 121,000
Harga Satuan Pekerjaan Hal 5
HARGA SATUAN HARGA SATUAN PEKERJAAN
VOLUME JUMLAH PER ITEM
No. URAIAN SAT
SATUAN BAHAN TENAGA BAHAN TENAGA PEKERJAAN
14 CAT TEMBOK m2 1
0.0625 Plamur tembok kg 0.06 22,000 1,000
0.003 Cat Tembok gln 0.00 600,000 2,000
0.06 Rool + Amplas bh 0.06 12,500 1,000
Bahan dan Alat Bantu m2 1.00 1,000 1,000
Tenaga m2 1.00 25,000 25,000
JUMLAH PEKERJAAN CAT TEMBOK 5,000 25,000 30,000
15 CAT KAYU KUSEN DAN DAUN m 2
1.00
0.13 Menie kg 0.13 45,000 6,000
0.15 Plamur kg 0.15 45,000 7,000
0.13 Cat Dasar kg 0.13 65,000 8,000
0.16 Cat Kayu kg 0.16 65,000 10,000
0.07 Minyak Cat liter 0.07 12,000 1,000
0.02 Kwas + Amplas bh 0.02 5,000 0
1 Bahan dan Alat Bantu m2 1.00 1,000 1,000
1 Tenaga m2 1.00 40,000 40,000
JUMLAH PEKERJAAN CAT KAYU 12,000 20,000 32,000
16 PEKERJAAN LANTAI m 2
1
KERAMIK LANTAI m2
1.1 Keramik m2 1.1 60,000 66,000
0.138 Semen sak 0.138 54,000 7,000
0.05 Pasir m3 0.05 300,000 15,000
0.086 Filler kg 0.086 7,500 1,000
1 Bahan dan Alat Bantu m2 1 2,000 2,000
1 Tenaga m2 1 30,000 30,000
JUMLAH PEKERJAAN LANTAI 91,000 30,000 121,000
I PEKERJAAN PERSIAPAN
1 Bedeng + Bouplank 1 Ls 1.78% 100.00% 1.78%
3 Listrik dan Air Kerja 1 Ls 1.27% 100.00% 1.27%
Jumlah 3.05% 0.00% 3.05%
Lanjutan Minggu ke 5
PROGRES KEMAJUAN PEKERJAAN
TAHAP PRESTASI TERHADAP
NO URAIAN PEKERJAAN VOLU ME SAT BOBOT MINGGU LALU KESELURIHAN PEK
PENYELESAIAN
PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
IX PEKERJAAN FINISHING
JUMLAH 0.10 - - -
REALISASI PROGRESS 29.02%
DEVIASI -4.56%
100%
Mengetahui
Kepala SMK PIJAR ALAM
### 1 Cangkul 4 bh
### 2 Skop 3 bh
### 3 Palu/martil 5 bh
### 4 Palu Godam (5 kg) 2 bh
### 5 Blencong 2 bh
### 6 Linggis 4 bh
### 7 Selang Waterpass 10 m'
### 8 Gegep/Tang 8 bh
### 9 Gergaji kayu 4 bh
### 10 Gergaji Besi 3 bh
### 11 Girinda Potong 3 bh
### 12 Kunci Besi 5 bh
### 13 Gegep/Tang 8 bh
14 0 0 bh
No SARAN / INSTRUKSI
### 1 Cangkul 4 bh
### 2 Skop 3 bh
### 3 Palu/martil 5 bh
### 4 Palu Godam (5 kg) 2 bh
### 5 Blencong 2 bh
### 6 Linggis 4 bh
### 7 Selang Waterpass 10 m'
### 8 Gegep/Tang 8 bh
### 9 Gergaji kayu 4 bh
### 10 Gergaji Besi 3 bh
### 11 Girinda Potong 3 bh
### 12 Kunci Besi 5 bh
### 13 Gegep/Tang 8 bh
14 0 0 bh
No SARAN / INSTRUKSI
### 1 Palu/martil 5 bh
### 2 Palu Godam (5 kg) 2 bh
### 3 Palu Godam (3 kg) 2 bh
### 4 Gegep/Tang 8 bh
### 5 Gergaji kayu 4 bh
### 6 Gergaji Besi 3 bh
### 7 Girinda Potong 3 m'
### 8 Bor 2 bh
### 9 Kunci Besi 5 bh
### 10 Ragum 1 bh
11 0 0 bh
12 0 0 bh
13 0 0 bh
14 0 0 bh
No SARAN / INSTRUKSI
### 1 Palu/martil 5 bh
### 2 Palu Godam (5 kg) 2 bh
### 3 Palu Godam (3 kg) 2 bh
### 4 Gegep/Tang 8 bh
### 5 Gergaji kayu 4 bh
### 6 Gergaji Besi 3 bh
### 7 Girinda Potong 3 m'
### 8 Bor 2 bh
### 9 Kunci Besi 5 bh
### 10 Ragum 1 bh
11 0 0 bh
12 0 0 bh
13 0 0 bh
14 0 0 bh
No SARAN / INSTRUKSI
### 1 Palu/martil 5 bh
### 2 Gegep/Tang 8 bh
### 3 Gergaji kayu 4 bh
### 4 Gergaji Besi 3 bh
### 5 Girinda Potong 3 bh
### 6 Bor 2 bh
### 7 Kunci Besi 5 m'
### 8 Ragum 1 bh
### 9 Cangkul 4 bh
### 10 Skop 3 bh
### 11 Molen 1 bh
### 12 Sendok Semen 5 bh
### 13 Ember cor 20 bh
14 0 0 bh
No SARAN / INSTRUKSI
Mengetahui Kota Bekasi, 20 Oktober 2018
Ketua Tim Pembangunan Dibuat Oleh Pelaksana Harian
### 1 Palu/martil 5 bh
### 2 Gegep/Tang 8 bh
### 3 Gergaji kayu 4 bh
### 4 Gergaji Besi 3 bh
### 5 Girinda Potong 3 bh
### 6 Bor 2 bh
### 7 Kunci Besi 5 bh
### 8 Ragum 1 bh
9 0 0 bh
10 0 0 bh
11 0 0 bh
12 0 0 bh
13 0 0 bh
14 0 0 bh
No SARAN / INSTRUKSI
Mengetahui Kota Bekasi, 27 Oktober 2018
Ketua Tim Pembangunan Dibuat Oleh Pelaksana Harian
### 1 Palu/martil 5 bh
### 2 Gegep/Tang 8 bh
### 3 Gergaji kayu 4 bh
### 4 Gergaji Besi 3 bh
### 5 Girinda Potong 3 bh
### 6 Bor 2 bh
### 7 Kunci Besi 5 m'
### 8 Ragum 1 bh
### 9 Cangkul 4 bh
### 10 Skop 3 bh
### 11 Sendok Semen 5 bh
### 12 Molen 1 bh
### 13 Ember cor 20 bh
14 0 0 bh
No SARAN / INSTRUKSI
Mengetahui Kota Bekasi, 3 Nopember 2018
Ketua Tim Pembangunan Dibuat Oleh Pelaksana Harian
### 1 Palu/martil 5 bh
### 2 Gegep/Tang 8 bh
### 3 Gergaji kayu 4 bh
### 4 Gergaji Besi 3 bh
### 5 Girinda Potong 3 bh
### 6 Bor 2 bh
### 7 Kunci Besi 5 m'
### 8 Ragum 1 bh
### 9 Cangkul 4 bh
### 10 Skop 3 bh
### 11 Sendok Semen 5 bh
### 12 Molen 1 bh
### 13 Ember cor 20 bh
14 0 0 bh
1 Bondek 200 m2
2 Wiremesh 10 200 m2
3 Kaso 10 Ikat
4 Paku 7 5 kg
5 Paku 5 5 kg
6 Paku 3 5 kg
7 Semen 144 sak
8 Pasir 13 m3
9 Split 19 m3
10 Pengeras Beton 15 botol
11
12
No SARAN / INSTRUKSI
### 1 Palu/martil 5 bh
### 2 Gegep/Tang 8 bh
### 3 Gergaji kayu 4 bh
### 4 Gergaji Besi 3 bh
### 5 Cangkul 4 bh
### 6 Skop 3 bh
### 7 Sendok Semen 5 bh
### 8 Ember cor 20 bh
### 9 Ayakan 1 bh
10 0 0 bh
11 0 0 bh
12 0 0 bh
13 0 0 bh
14 0 0 bh
1 Paku 7 3 kg
2 Paku 3 3 kg
3 Bata 11500 bh
4 Semen 31 sak
5 Pasir 5 m3
6 Kusen Pintu 2 bh
7 Kusen Jendela
8
9
10
11
12
No SARAN / INSTRUKSI
### 1 Palu/martil 5 bh
### 2 Gegep/Tang 8 bh
### 3 Gergaji kayu 4 bh
### 4 Gergaji Besi 3 bh
### 5 Cangkul 4 bh
### 6 Skop 3 bh
### 7 Sendok Semen 5 bh
### 8 Ember cor 20 bh
### 9 Ayakan 1 bh
10 0 0 bh
11 0 0 bh
12 0 0 bh
13 0 0 bh
14 0 0 bh
1 Paku 7 3 kg
2 Paku 3 3 kg
3 Bata 12000 bh
4 Semen 31 sak
5 Pasir 5 m3
6 Kusen Pintu 2 bh
7 Kusen Jendela
8
9
10
11
12
No SARAN / INSTRUKSI
### 1 Palu/martil 5 bh
### 2 Gegep/Tang 8 bh
### 3 Cangkul 4 bh
### 4 Skop 3 bh
### 5 Sendok Semen 5 bh
### 6 Ember cor 20 bh
### 7 Ayakan 1 bh
8 0 0 bh
9 0 0 bh
10 0 0 bh
11 0 0 bh
12 0 0 bh
13 0 0 bh
14 0 0 bh
1 Semen 35 sak
2 Pasir 4 m3
3
4
5
6
7
8
9
10
11
12
No SARAN / INSTRUKSI
### 1 Palu/martil 5 bh
### 2 Gegep/Tang 8 bh
### 3 Gergaji kayu 4 bh
### 4 Gergaji Besi 3 bh
### 5 Cangkul 4 bh
### 6 Skop 3 bh
### 7 Sendok Semen 5 bh
### 8 Ember cor 20 bh
### 9 Ayakan 1 bh
10 0 0 bh
11 0 0 bh
12 0 0 bh
13 0 0 bh
14 0 0 bh
1 Semen 35 sak
2 Pasir 4 m3
3 Engsel-engsel
4 Kunci-kunci
5
6
7
8
9
10
11
12
No SARAN / INSTRUKSI
### 1 Palu/martil 5 bh
### 2 Gegep/Tang 8 bh
### 3 Gergaji kayu 4 bh
### 4 Gergaji Besi 3 bh
### 5 Cangkul 4 bh
### 6 Skop 3 bh
### 7 Sendok Semen 5 bh
### 8 Ember cor 20 bh
### 9 Ayakan 1 bh
10 0 0 bh
11 0 0 bh
12 0 0 bh
13 0 0 bh
14 0 0 bh
1 Semen 32 sak
2 Pasir 9 m3
3 Keramik 190 m2
4 Oker 10 kg
5 Semen Putih 10 kg
6
7
8
9
10
11
12
No SARAN / INSTRUKSI
Mandor/ Kep.
1 1 WASNO 140,000 1 1 1 1 1 1 6 840,000
Tukang
1 2
2 2 RISAN Tukang Kayu 135,000 1 1 1 1 1 1 6 810,000
0 0 0 - 1 1 1 1 1 5 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 - 0 -
0 0 0 - 1 1 1 1 1 1 1 7 -
0 0
0 0 - 0 -
ABSENSI TENAGA
PEMBANGUNAN RUANG PRAKTEK SISWA (RPS) Minggu ke : 7 (Tujuh)
SMK PIJAR ALAM Hari Kerja : 41 s/d 47
Periode : 28 Okt s/d 3 Nopember 2018
HARI
Hari
No Nama Jabatan Upah JUMLAH UPAH Tanda Tangan
Minggu Senin Selasa Rabu Kamis Jum'at Sabtu
Kerja
0 0 0 - 1 1 1 1 1 1 1 7 -
0 0
0 0 - 0 -
ABSENSI TENAGA
PEMBANGUNAN RUANG PRAKTEK SISWA (RPS) Minggu ke : 8 (Delapan)
SMK PIJAR ALAM Hari Kerja : 48 s/d 54
Periode : 4 s/d 10 Nopember 2018
HARI
Hari
No Nama Jabatan Upah JUMLAH UPAH Tanda Tangan
Minggu Senin Selasa Rabu Kamis Jum'at Sabtu
Kerja
0 0 0 - 1 1 1 1 1 1 1 7 -
0 0
0 0 0 - 1 1 1 1 1 1 1 7 -
0 0 0 - 1 1 1 1 1 1 1 7 -
0 0
0 0 - 0 -
ABSENSI TENAGA
PEMBANGUNAN RUANG PRAKTEK SISWA (RPS) Minggu ke : 9 (Sembilan)
SMK PIJAR ALAM Hari Kerja : 55 s/d 61
Periode : 11 s/d 17 Nopember 2018
HARI
Hari
No Nama Jabatan Upah JUMLAH UPAH Tanda Tangan
Minggu Senin Selasa Rabu Kamis Jum'at Sabtu
Kerja
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 - 0 -
ABSENSI TENAGA
PEMBANGUNAN RUANG PRAKTEK SISWA (RPS) Minggu ke : 10 (Sepuluh)
SMK PIJAR ALAM Hari Kerja : 62 s/d 68
Periode : 18 s/d 24 Nopember 2018
HARI
Hari
No Nama Jabatan Upah JUMLAH UPAH Tanda Tangan
Minggu Senin Selasa Rabu Kamis Jum'at Sabtu
Kerja
0 0 0 - 0 -
0 0
0 0 0 - 1 1 1 1 1 1 6 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 - 0 -
ABSENSI TENAGA
PEMBANGUNAN RUANG PRAKTEK SISWA (RPS) Minggu ke : 11 (Sebelas)
SMK PIJAR ALAM Hari Kerja : 69 s/d 75
Periode : 25 Nop s/d 1 Desember 2018
HARI
Hari
No Nama Jabatan Upah JUMLAH UPAH Tanda Tangan
Minggu Senin Selasa Rabu Kamis Jum'at Sabtu
Kerja
0 0 0 - 1 1 1 1 1 1 1 7 -
0 0
0 0 0 - 1 1 1 1 1 1 6 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 - 0 -
ABSENSI TENAGA
PEMBANGUNAN RUANG PRAKTEK SISWA (RPS) Minggu ke : 12 (Dua Belas)
SMK PIJAR ALAM Hari Kerja : 76 s/d 82
Periode : 2 s/d 8 Desember 2018
HARI
Hari
No Nama Jabatan Upah JUMLAH UPAH Tanda Tangan
Minggu Senin Selasa Rabu Kamis Jum'at Sabtu
Kerja
0 0 0 - 1 1 1 1 1 1 6 -
0 0
0 0 0 - 1 1 1 1 1 1 6 -
0 0 0 - 1 1 1 1 1 1 6 -
0 0
0 0 0 - 1 1 1 1 1 1 6 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 - 0 -
JUMLAH UPAH MINGGU INI 4,035,000
ABSENSI TENAGA
PEMBANGUNAN RUANG PRAKTEK SISWA (RPS) Minggu ke : 13 (Tiga Belas)
SMK PIJAR ALAM Hari Kerja : 83 s/d 89
Periode : 9 s/d 15 Desember 2018
HARI
Hari JUMLAH
No Nama Jabatan Upah Tanda Tangan
Minggu Senin Selasa Rabu Kamis Jum'at Sabtu
Kerja UPAH
0 0 0 - 1 1 1 1 1 5 -
0 0
0 0 0 - 1 1 1 1 1 1 1 7 -
0 0 0 - 1 1 1 1 1 1 1 7 -
0 0
0 0 0 - 1 1 1 1 1 1 6 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0
0 0 - 0 -
ABSENSI TENAGA
PEMBANGUNAN RUANG KELAS BARU (RKB) Minggu ke : 14 (Empat Belas)
SMK PIJAR ALAM - 2 Hari Kerja : 99 s/d 105
Periode : 0
HARI
Hari JUMLAH
No Nama Jabatan Upah Tanda Tangan
Minggu Senin Selasa Rabu Kamis Jum'at Sabtu
Kerja UPAH
0 0 0 - 1 1 1 1 1 5 -
0 0
0 0 0 - 1 1 1 1 1 1 6 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 0 - 0 -
0 0 0 - 0 -
0 0
0 0 - 0 -
2 1 2 3
T. Kayu T. Batu T. Besi Pekerja
2 1 2 5
T. Kayu T. Batu T. Besi Pekerja
2 1 2 5
T. Kayu T. Batu T. Besi Pekerja
2 1 2 5
T. Kayu T. Batu T. Besi Pekerja
2 1 2 5
T. Kayu T. Batu T. Besi Pekerja
2 2 2 6
T. Kayu T. Batu T. Besi Pekerja
2 2 2 6
T. Kayu T. Batu T. Besi Pekerja
2 2 2 5
T. Kayu T. Batu T. Besi Pekerja
1 2 4
T. Kayu T. Batu T. Besi Pekerja
1 2 4
T. Kayu T. Batu T. Besi Pekerja
2 4
T. Kayu T. Batu T. Besi Pekerja
2 3
T. Kayu T. Batu T. Besi Pekerja
2 3
T. Kayu T. Batu T. Besi Pekerja
2 3
Waktu Pelaksanaan
SABTU TG Bulan ke
1 17 /d 22 September 2018 22 September 2018 1 26/06/16
2 24 s/d 29 September 2018 29 September 2018 1 01/07/16
3 30 Sept s/d 6 Oktober 2018 6 Oktober 2018 2 09/07/16
4 7 s/d 13 Oktober 2018 13 Oktober 2018 2 16/07/16
5 14 s/d 20 Oktober 2018 20 Oktober 2018 2 30/07/16
6 21 s/d 27 Oktober 2018 27 Oktober 2018 2 16/07/16
7 28 Okt s/d 3 Nopember 2018 3 Nopember 2018 2 06/08/16
8 4 s/d 10 Nopember 2018 10 Nopember 2018 3 13/08/16
9 11 s/d 17 Nopember 2018 17 Nopember 2018 3 20/08/16
10 18 s/d 24 Nopember 2018 24 Nopember 2018 3 27/08/16
11 25 Nop s/d 1 Desember 2018 1 Desember 2018 3 03/09/16
12 2 s/d 8 Desember 2018 8 Desember 2018 4 10/09/16
13 9 s/d 15 Desember 2018 15 Desember 2018 4 17/09/16
14 4 24/09/16
15 5 01/10/16
16 5 08/10/16
17 5 15/10/16
18 5 22/10/16
19 4
20
1 (Satu) 1 s/d 6
2 (Dua) 7 s/d 13
3 (Tiga) 14 s/d 20
4 (Empat) 21 s/d 27
5 (Lima) 28 s/d 33
6 (Enam) 34 s/d 40
7 (Tujuh) 41 s/d 47
8 (Delapan) 48 s/d 54
9 (Sembilan) 55 s/d 61
10 (Sepuluh) 62 s/d 68
11 (Sebelas) 69 s/d 75
12 (Dua Belas) 76 s/d 82
13 (Tiga Belas) 83 s/d 89
14 (Empat Belas) 99 s/d 105
15 (Lima Belas) 106 s/d 112
16 (Enam Belas) 112 s/d 118
17 (Tujuh Belas) 119 s/d 125
18 (Delapan Belas) 126 s/d 132
19 (Sembilan Belas) 133 s/d 139
20 (Dua Puluh)
1 Cangkul 4
2 Skop 3
3 Sendok Semen 5
4 Roskam 3
5 Palu/martil 5
6 Palu Godam (5 kg) 2
7 Palu Godam (3 kg) 2
8 Linggis 4
9 Gegep/Tang 8
10 Gergaji kayu 4
11 Gergaji Besi 3
12 Girinda Potong 3
13 Bor 2
14 Kunci Besi 5
15 Ragum 1
16
17
Dody Lusianawati, S.Pd
Perencana Ir. Teguh Ponconiti
Ketua Tim Pembangunan Sutisno, ST
Pelaksana Harian TB. Achmad Fauzi, SE
Bendahara Fitriani, S.Pd
1 Cangkul 4
2 Skop 3
3 Sendok Semen 5
4 Molen 1
5 Roskam 3
6 Palu/martil 5
7 Palu Godam (5 kg) 2
8 Palu Godam (3 kg) 2
9 Blencong 2
10 Linggis 4
11 Gegep/Tang 8
12 Gergaji kayu 4
13 Gergaji Besi 3
14 Girinda Potong 3
15 Bor 2
16 Kunci Besi 5
17 Ragum 1
18 Kafe 3
19 Roll cat 3
Keterangan
LAT
REKAPAN TENAGA KERJA
PEMBANGUNAN RUANG PRAKTEK SISWA
SMK PIJAR ALAM
Upah
No. Nama Pekerja/ Tukang Umur L/P Posisi dlm Pekerjaan
Harian
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 1 GERIMIS
10.00 1 2 1
11.00 1
12.00 1 1
13.00 1
14.00 1
15.00 2 HUJAN
16.00 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 7 6 9 8 6 42 Jam
GERIMIS 3 1 3 0 1 3 11 Jam
HUJAN 0 1 0 0 0 0 1 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 1 GERIMIS
10.00 1 2 1
11.00 1
12.00 1 1 1
13.00 1 1
14.00 2 1
15.00 1 2 HUJAN
16.00 1 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 6 7 6 7 8 6 46 Jam
GERIMIS 2 3 1 3 2 1 3 15 Jam
HUJAN 1 0 1 0 0 0 0 2 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00
9.00 1 1 GERIMIS
10.00 2
11.00
12.00
13.00
14.00
15.00 2 HUJAN
16.00 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 9 9 7 9 9 8 9 60 Jam
GERIMIS 0 0 1 0 0 1 0 2 Jam
HUJAN 0 0 1 0 0 0 0 1 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 1 1 GERIMIS
10.00 1 2 1 1
11.00 1 1
12.00 1 1 1 1
13.00 1 1 1 1
14.00 2 1 1 1
15.00 1 1 1 2 HUJAN
16.00 1 1 1 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 6 7 1 7 1 6 34 Jam
GERIMIS 2 3 1 8 2 8 3 27 Jam
HUJAN 1 0 1 0 0 0 0 2 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 GERIMIS
10.00
11.00
12.00 1
13.00 1
14.00 2
15.00 1 2 HUJAN
16.00 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 8 9 9 7 8 9 56 Jam
GERIMIS 2 1 0 0 2 1 0 6 Jam
HUJAN 1 0 0 0 0 0 0 1 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 GERIMIS
10.00 2 2 1
11.00 2 1
12.00 1 1
13.00 1
14.00
15.00 2 HUJAN
16.00 1
17.00 2
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 5 8 7 6 8 9 9 52 Jam
GERIMIS 2 1 1 3 0 0 0 7 Jam
HUJAN 2 0 1 0 1 0 0 4 Jam
Bekasi, 27 Oktober 2018
Menngetahui. Dibuat Oleh,
Ketua Tim Pelaksana
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 1 GERIMIS
10.00 1 1
11.00 1
12.00 1 1
13.00 1 2
14.00 2 2
15.00 2 2 1 2 HUJAN
16.00 2 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 5 6 9 2 7 8 9 46 Jam
GERIMIS 2 3 0 3 2 1 0 11 Jam
HUJAN 2 0 0 4 0 0 0 6 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 GERIMIS
10.00 1 2
11.00 1
12.00 1 1 1
13.00 1 1 1
14.00 2 1 1
15.00 1 2 HUJAN
16.00 1 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 6 7 9 3 9 6 46 Jam
GERIMIS 2 3 1 0 6 0 3 15 Jam
HUJAN 1 0 1 0 0 0 0 2 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 1 1 GERIMIS
10.00 1 1 2
11.00 1 2
12.00 1 1 2 1
13.00 1 1 2 1
14.00 2 1 2 1
15.00 1 1 2 HUJAN
16.00 1 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 6 9 1 2 8 6 38 Jam
GERIMIS 2 3 0 8 2 1 3 19 Jam
HUJAN 1 0 0 0 5 0 0 6 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1 1
9.00 1 1 1 1 GERIMIS
10.00 1 2 1 1
11.00 1 1
12.00 1 1 1
13.00 1 1
14.00 2 1
15.00 1 2 HUJAN
16.00 1 1
17.00 1
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 6 7 6 9 8 -1 41 Jam
GERIMIS 2 3 1 3 0 1 10 20 Jam
HUJAN 1 0 1 0 0 0 0 2 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 GERIMIS
10.00 1 2 1
11.00 1
12.00 1 1 1
13.00 1 1
14.00 2 1
15.00 2 HUJAN
16.00 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 6 7 6 9 9 6 49 Jam
GERIMIS 2 3 1 3 0 0 3 12 Jam
HUJAN 1 0 1 0 0 0 0 2 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 1 GERIMIS
10.00 1 2 1
11.00 1
12.00 1 1 1
13.00 1 1 1
14.00 2 1 1
15.00 1 1 1 2 HUJAN
16.00 1 1 1
17.00 1
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 3 4 6 7 8 6 40 Jam
GERIMIS 2 6 4 3 2 1 3 21 Jam
HUJAN 1 0 1 0 0 0 0 2 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 1 1 GERIMIS
10.00 1 2 1
11.00 1
12.00 1 1 1
13.00 1 1 1
14.00 2 1 1
15.00 1 1 2 HUJAN
16.00 1 1 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 6 7 1 7 8 6 41 Jam
GERIMIS 2 3 1 8 2 1 3 20 Jam
HUJAN 1 0 1 0 0 0 0 2 Jam
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 1 GERIMIS
10.00 1 2 1 1
11.00 1 1
12.00 1 1 1 1 1
13.00 1 1 1 1
14.00 2 1 1
15.00 1 1 2 HUJAN
16.00 1 1 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 6 6 5 6 7 1 6 37 Jam
GERIMIS 2 3 3 3 2 8 3 24 Jam
HUJAN 1 0 1 0 0 0 0 2 Jam
Bekasi, 0
Menngetahui. Dibuat Oleh,
Ketua Tim Pelaksana
0.00
1.00
2.00
3.00 CERAH
4.00
5.00
6.00
7.00
8.00 1
9.00 1 1 1 1 1 GERIMIS
10.00 1 2 1 1
11.00 1 1
12.00 1 1
13.00 1 1 1
14.00 1 1 1
15.00 1 1 2 HUJAN
16.00 1 1 1
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
CERAH 9 4 7 1 4 8 6 39 Jam
GERIMIS 0 5 1 8 5 1 3 23 Jam
HUJAN 0 0 1 0 0 0 0 1 Jam
Bekasi, 0
Menngetahui. Dibuat Oleh,
Ketua Tim Pelaksana
Debit
TANGGAL Nomor Bukti Uraian Nilai Nominal
PPN PPh 22 PPh 21
15 Keramik 180 m 2
32 9 198
Kebutuhan Material 541 58.346 54.366 51 331 135 99 129 54 62 81.2 108 16 1546 34 17 11060 198
193.25 ikat
1 2 3 4 5 6
25/09/2018 04/RPS-PA/2018 Dibayar Pasir 2 Truk Colt Diesel + Split 2-3 2 Colt Diesel pada supir 10,000,000 -29,157,000
28/09/2018 06/RPS-PA/2018 Dibayar Semen Tiga Roda 100 sak @ 50 kg 5,400,000 -39,762,000
29/09/2018 07/RPS-PA/2018 Dibayar Pembelian alat Pertukangan ke TB. Bintang Timur 995,000 -40,757,000
29/09/2018 08/RPS-PA/2018 Dibayar Pembelian Besi dan Triplek ke TB. Bintang Timur 17,435,000 -58,192,000
02/10/2018 10/RPS-PA/2018 Dibayar Pembelian Bendrat, Pipa dll ke TB. Bintang Timur 613,000 -66,460,000
05/10/2018 11/RPS-PA/2018 Dibayar Pembelian Paku, dan Ember cor 880,000 -67,340,000
10/10/2018 13/RPS-PA/2018 Dibayar kaso 4 x 6 sebanyak 1 m3 pada pembelahan kayu 2,550,000 -77,310,000
12/10/2018 14/RPS-PA/2018 Dibayar Pasir 1 Truk Colt Diesel + Split 2-3 2 Colt Diesel pada supir 5,100,000 -82,410,000
Buku Kas Umum Hal 2
Tanggal No. Bukti Uraian Debet Kredit Saldo
1 2 3 4 5 6
15/10/2018 15/RPS-PA/2018 Dibayar Besi dia 8, dia 13 dll ke TB. Bintang Timur 22,325,000 -104,735,000
19/10/2018 18/RPS-PA/2018 Dibayar Semen Tiga Roda 130 sak @ 50 kg 8,970,000 -123,435,000
25/10/2018 20/RPS-PA/2018 Dibayar 2 pasir + 2 split cold diesel ke supir 5,100,000 -136,475,000
08/11/2018 23/RPS-PA/2018 Dibayar Tanah Merah 10 truk dan menggelar ke Supir 6,000,000 -159,490,000
12/11/2018 25/RPS-PA/2018 Dibayar Kusen + Daun Pintu Jendela ke Pembuat Kusen 16,500,000 -202,690,000
14/11/2018 26/RPS-PA/2018 Dibayar Batu Bata 12.000 bh @ Rp 425 ke Pembuat di cikarang 3,850,000 -215,650,000
14/11/2018 27/RPS-PA/2018 Dibayar 2 truk cold pasir pasang diesel ke supir 4,800,000 -220,450,000
03.12.2018 32/RPS-PA/2018 Dibayar 2 truk cold pasir pasang diesel ke supir 4,800,000 -239,377,500
1 2 3 4 5 6
09/12/2018 35/RPS-PA/2018 Dibayar Keramik 200 m kw.1 @ Rp. 62.500,- ke TB Bintang Timur 12,500,000 -256,712,500
10/12/2018 36/RPS-PA/2018 Dibayar Pasir Urug 6 Truk @ Rp. 1.600.000 Ke Supir Truk 9,600,000 -270,347,500
12/12/2018 37/RPS-PA/2018 Dibayar material compon, cat dasar, semen putih 1,930,000 -272,277,500
Uang Sejumlah : #Dua Juta Lima Ratus Delapan puluh Enam Ribu RP#
Uang Sejumlah : #Sepuluh Juta Enam Ratus Delapan Puluh Empat Ribu Rp#
Untuk Pembayaran : Material Bangunan, Besi Ø 8 -28 btg, Besi Ø 12 - 50 btg, Ø 16 - 18 btg dll
Setuju Dibayar
Ka. SMK Pijar Alam Faktur Terlampir'
Uang Sejumlah : #Lima Juta Delapan Ratus Delapan Puluh Tujuh Ribu Rupiah#
No : 08/RPS-PA/2018
Uang Sejumlah : #Tujuh Belas Juta Empat Ratus Tiga Puluh Lima Ribu RP#
Untuk Pembayaran : Besi Ø6 - 55 btg, Besi Ø13 - 165 btg dan triplek 9 mm 36 lembar
Setuju Dibayar
Ka. SMK Pijar Alam Faktur /Nota Terlampir'
No : 09/RPS-PA/2018
Uang Sejumlah : #Tujuh Juta Enam Ratus Lima Puluh Lima Ribu Rp#
No : 10/RPS-PA/2018
No : 11/RPS-PA/2018
No : 12/RPS-PA/2018
Uang Sejumlah : #Tujuh Juta Empat Ratus Dua Puluh Ribu Rp#
No : 13/RPS-PA/2018
Uang Sejumlah : #Dua Juta Lima Ratus Luma Puluh Ribu Rp#
Untuk Pembayaran : Kaso 4x6 sebanyak 1/2 m3 panjang 3 meter ½ m2 dan panjang 4 m ½ m3
Setuju Dibayar
Ka. SMK Pijar Alam Faktur /Nota Terlampir'
No : 14/RPS-PA/2018
Untuk Pembayaran : Pasir Cor 1 Truk col diesel + Truk col Diesel Split 2-3
Setuju Dibayar
Ka. SMK Pijar Alam Faktur / Nota Terlampir'
No : 15/RPS-PA/2018
Uang Sejumlah : #Dua Puluh Dua Juta Tiga Ratus Dua Puluh Lima Ribu Rp#
Untuk Pembayaran : Besi dia 8-80 btg, dia. 13-25 btg, dia 16-15 btg dll
Setuju Dibayar
Ka. SMK Pijar Alam Faktur /Nota Terlampir'
No : 16/RPS-PA/2018
Uang Sejumlah : #Tujuh Juta Lima Ratus Tiga Puluh Ribu Rp#
No : 17/RPS-PA/2018
No : 18/RPS-PA/2018
Uang Sejumlah : #Delapan Juta Sembilan ratus Tujuh Puluh Ribu Rp#
No : 19/RPS-PA/2018
Uang Sejumlah : #Tujuh Juta Sembilan Ratus Empat Puluh Ribu Rp#
No : 20/RPS-PA/2018
Untuk Pembayaran : Pasir cor 1 truk cold Diesel + split 1 colt diesel
Setuju Dibayar
Ka. SMK Pijar Alam Faktur /Nota Terlampir'
No : 21/RPS-PA/2018
Uang Sejumlah : #Delapan Juta Sembilan Ratus Tiga Puluh Ribu RP#
No : 22/RPS-PA/2018
No : 23/RPS-PA/2018
No : 24/RPS-PA/2018
Uang Sejumlah : #Dua Puluh Enam Juta Tujuh Ratus Ribu Rp#
No : 24/RPS-PA/2018
No : 25/RPS-PA/2018
Untuk Pembayaran : Untuk Pembayaran Kusen Pintu 1 Buah + Daun Pintu 2 Buah
Setuju Dibayar Kusen Jendela 5 buah + 15 Daun Jendela
Ka. SMK Pijar Alam Faktur / Nota Terlampir'
No : 26/RPS-PA/2018
Uang Sejumlah : #Tiga Juta Delapan Ratus Ribu Lima Puluh Ribu Rp#
Untuk Pembayaran : Batu Bata sebanyak 7000 buah @ Rp. 550,-
Setuju Dibayar
Ka. SMK Pijar Alam Faktur / Nota Terlampir'
No : 27/RPS-PA/2018
No : 28/RPS-PA/2018
No : 29/RPS-PA/2018
No : 30/RPS-PA/2018
No : 31/RPS-PA/2018
No : 32/RPS-PA/2018
No : 33/RPS-PA/2018
Telah terima dari : Bendahara SMK PIJAR ALAM Bekasi
Uang Sejumlah : Empat Juta Delapan Ratus Tiga Puluh Lima Ribu RP#
No : 38/RPS-PA/2018
Uang Sejumlah : # Empat Juta Empat Ratus Sembilan Puluh Ribu Rupiah #
No : 39/RPS-PA/2018
Uang Sejumlah :
Untuk Pembayaran : Penggantian Penalangan dana Pembelian dan Pembayaran RKB Sampai
Setuju Dibayar Pencairan Tahab yang ke 2 (30%)
Ka. SMK Pijar Alam
No : 40/RPS-PA/2018
Uang Sejumlah :
#Tiga Belas JutaTujuh Ratus Lima Puluh Tujuh Ribu Rp#
No : 41/RPS-PA/2018
25/09/2018 04/RPS-PA/2018 Dibayar Pasir 2 Truk Colt Diesel + Split 2-3 2 Colt Diesel pada supir 10,000,000 -29,157,000
28/09/2018 06/RPS-PA/2018 Dibayar Semen Tiga Roda 100 sak @ 50 kg 5,400,000 -39,762,000
29/09/2018 07/RPS-PA/2018 Dibayar Pembelian alat Pertukangan ke TB. Bintang Timur 995,000 -40,757,000
29/09/2018 08/RPS-PA/2018 Dibayar Pembelian Besi dan Triplek ke TB. Bintang Timur 17,435,000 -58,192,000
08/11/2018 23/RPS-PA/2018 Dibayar Tanah Merah 10 truk dan menggelar ke Supir 6,000,000 -159,490,000
12/11/2018 25/RPS-PA/2018 Dibayar Kusen + Daun Pintu Jendela ke Pembuat Kusen 16,500,000 -202,690,000
14/11/2018 26/RPS-PA/2018 Dibayar Batu Bata 12.000 bh @ Rp 425 ke Pembuat di cikarang 3,850,000 -215,650,000
14/11/2018 27/RPS-PA/2018 Dibayar 2 truk cold pasir pasang diesel ke supir 4,800,000 -220,450,000
22/11/2018 29/RPS-PA/2018 Dibayar engsel, Kunci Pintu dan Jendela ke TB Bintang Timur 990,000 -226,245,000
09/12/2018 35/RPS-PA/2018 Dibayar Keramik 200 m kw.1 @ Rp. 62.500,- ke TB Bintang Timur 12,500,000 -256,712,500
10/12/2018 36/RPS-PA/2018 Dibayar Pasir Urug 6 Truk @ Rp. 1.600.000 Ke Supir Truk 9,600,000 -270,347,500
12/12/2018 37/RPS-PA/2018 Dibayar material compon, cat dasar, semen putih 1,930,000 -272,277,500