Professional Documents
Culture Documents
Project Title :
Ref. Drawing No. : Ref No. :
Location:
Date :
Subcontractor : SUNLINE TECHNICAL SERVICES SDN BHD
Equipment / Ref.: Manufacturer: Model: Serial No.
Comply
Item Description Remarks
Yes No
1 FCU Position/ Location
2 Piping
3 Flow Test
Remarks:
STATUS OF INSPECTION
I / We have carried out all necessary inspections and verify that the above items/activities conform to the contract specifications/document
Conducted By Sub- Witness & Verified By Acknowledged By
Checked By Main-Contractor
Contractor Client's Consultant
Signature
Name
Company
Date
Page 1 of 1