C-21

SCHEDULE OF RCC (M20) Staircase Tower & Lift M/C room Beams B-1 C-22 C-21 HB-1 C-22

Sr . Top steel Bottom steel Stirrups


Beam Mark Size Remark
No.
Reg At support Reg Bent At Support Central
(beam top
+2400 mm
01. HB-1,HB-2,HB-3,HB-4 230X300 - from last
landing S1
slab top)

HB-4
HB-3
S4

B-3

B-4
02. LB-1,LB-2,LB-3,LB-4 230X300 - -

03. LB-5,LB-6,LB-7,LB-8 230X300 -

04. B-1,B-2,B-3,B-4 230X380 - A A

HB-2

SCHEDULE OF R.C.C (M20) SLAB


Sr . Short span steel Long span steel C-32 B-2 C-33 C-32 C-33
No. Slab Mark Depth Remarks Level
Reg Extratop Reg Extra top
Water Tank Plan Staircase tower slab
01. S1 100 2-way slab Slab top +2400 mm from
last landing slab top
02. S2 100 2-way slab
03. S3 100 2-way slab Slab top +7100 mm from
last landing slab top
120 1-way slab LB-1 LB-5
04. S4 - -

LB-3 S2 S3
Construction Notes :- 8 80 c/c 8 80 c/c
LB-4 LB-7 LB-8
1. All Reinforced concrete should be in M-20 grade unless otherwise
specified. 8 240 c/c 8 240 c/c
2. All reinforcement steel should be HYSD bars FE500 excluding

3. Depth of excavation should be up to starta of bearing capacity of


300 KN/Sqm but not less than 2000 mm. LB-2 LB-6
B-4
B-3

4. Clear cover of 50 mm for footings,40 mm for columns, 25 mm for


beams and 15 mm for slab should be provided. 8 300 c/c 8 170 c/c

5. All dimensions are in mm. Lift m/c Room floor slab Lift m/c room roof slab
6. Do not scale this drawing, follow the written dimensions only.
7. Read this drawing along with Architectural Drawing. A-A S/C of Water Tank
PROPOSAL TITLE DRG NO.06 Unite Constructions
Here Dream Comes True.......
DATE :
Details of Staircase ARCHITECTS AND ENGINEERS
DRN BY : Unite Constructions CONTRACTORS AND CONSULTANTS
Tower Water Tank & CHK BY : BUILDERS AND DEVELOPERS
Lift M/C room ESTIMATORS AND VALUERS