eee
Project Information Format
improvements to Escape Channel, Nippulavagu, Galeru River
land Kundu River from Km 0,000 to Km 189.200 and Re-
Name of the Project |gradation of Vagu, flood Protection works and providing hia!
level Bridges at enroute villages for improving the carrying
lcapacity to 35000 cusecs”.
(Retain appicable areas) 1. Irigation/ Water Resources.
i 2. Water for domestic use (including drinking water)
2. Water for domestic us 3. Industrial Water, and
Sectoral area 4. Horticulture.
irrigation Circle for the linigation circle Kurnool, Andhra Pradesh.
project
5 "To draw flood water 35000 Cuseos per day within 40 days
‘About the Project [SPasily the need for the project, current and _ instead of 11,150 Cuseos. From Banakacherela Regulator to
projected ‘inflows/ outflows
[Penna River through Nippula vagu, Galeru and Kundu River.
Project Components
|specify the major project components (Pump
IHouses, Sub-stations, Main and Branch Canals,
IReservairs, Bridges, etc.)
Level Bridges and Ps
3. Construction of Protectior
Benefits of the project
limplementation of the project. Include new
ben stabilized ayacul,
ith drinking water fecilties, no. of industries
enefited, no. of villages benefited, districts
[benefited etc.
[Specify the major benefits to be realized through)
>. of people provided
Ii. To draw flood water 35,000 Cusecs per day within 40 days
land Domestic Purpose.
bb. To improve the Ground water along the Project Scheme and
ill be Improve the Ayacut.
3 .Inigated Ayacut along the Scheme from Banakacherlla
ICross regulator to Somasila around 14.00 Lakhs (ie;KC canal
lAyacut, Kundu Ayacut and Somasila Ayacut.)
14. Constriiction of Mini Hydel Power Station and Generate the
\Power.
|5. To saye Life and Property of along the villages frequently beinghe Jfoods.
6. To improve the Social Economy condition of the surrounding
jllages.
| 2. To Development the Fisheries Activites.
| ‘Specify month and ‘April-2020
\From ae
ito. ‘Specify month and Up to March 31 st-2022
| ce
7 | Proposed Project duration
ears 2Years
i Months ae Neri
LI
‘urrent inflows and Specify in cusecs itis canal Current inflow capacity 11,150 cusecs.
wutflows
| [Projected inflows and Specify in cusecs It is Projected canal Current inflow capacity 35,000 cusecs.
loutfows,
8 | Water Availabilty 75% dependence yield_| Speatyin TMC 720 TMC
(Catchment area |. Specify in Hectares 2340 Hectares:
Average Rainfall in Specify in mm. Average Rainfall 762.34 mm
[proje mn si E
NO.
‘Yes / No (specify area in Hectares if yes)
tL
fo | ios perce ‘Yes / No (specify area in Hectares if yes) Ne
47] Private Land Acquistion | Yes/No (epecify area in Hectares fryes) Yes, 100.86 Haclares.
2 Yes / No (apeciy area in Hectares If yes) No.
Yes / No (speci no. of Habitalions and Project No
13 mes Displaced
poy Families (PDFs) if yes)
14 [Any Other (Please specify) Yes/No No
4
Project Information FormatProject information Format
Is to be pooled, total pooled, NO.
15 Land Pooling [balance to be pooled and tentative date of
completion
|Specify total land to be acquired, total acquired, No
16 Cer merece |balance to be acquired and tentative date of
‘Acquisition leompation
|Spacify total land to be acquired, total acquired, Proposed Land is 100.36 Hectares.
17 | Private Land Acquisition |balence fo be acquired and tentative date of
jcompletion
|Spacify total land to be acquired, total acquired, No
18} Forest Land Acquisition |balence to be acquired and tentative date of
\completion
\Specify total PDFs resettled, balance to be No
Resettlement & i
19 Rehabilitation resettled andtentative date of completion.
(Any Other (Please spe
\Specify in INR Crore and USD Million (with
laxchange rate)
Rs:1601 Crores in INR
| ‘Overall Project Cost
|
|Specity in INR Crore and USD Million (with
lexchange rate) for the components identified in
|. Mechanical works and Electrical at BCR
Earth work Excavation
‘Complex.INR.16.10 Crore.USD Millio: 2.18, (As on
Exchange Rate date: 09-03-2020).
formation of Banks.
: 104.08. (As on
0).
Component Wise Project . c . Construction of protection wails. INR.310,88 Crore.USD|
ea Cost Perey ee no Million: 42.01. (As on Exchange Rate date: 09-03-
Iaaintenance costs here)
Rate date: 09-03-2020),
Lump sum items INR.185.87 Crore, USD
104,08. (As on Exchange Rate date: 09-03-2020).
25 | Gost related to Land [Specify in INR Crore and USD Milion (with n: 4.86. (As on Exchange Rate date: 09-03,
‘ 4Project information Format
‘Acquisition nxchange rate) 2020)
na} pashfelated to speci in INR Grore and USD Millon oth
Rehabilitation _[Pxchange rate)
Cost related to
lexchango rate)
\Specity in INR Crore and USD Million (with ~
Not Applicable
27 | Coastal regulation Zone
28 Forest Yes / Noi Not Af
29 Witdife Yes / No/ Not Applicable
30 Heritage Yes / No/ Not Applicable
Resettlement &
31 settlement Yes / No! Not Applicable
Final Clearance from Not Applicable
32 Central ‘Yes / Nof Not Applicable
Water Commission
33 Hydrology. Yes [Nol Not Not Appi
34 Inter-state matters Yes /No/ Not Not A
35 | Any other (Please speci Yes / No Not Applicable Not Applicable
‘Specify current status endtentative date of Not Required
%6 Environment ae
37 | Coastal eguaion Zone | _SP#2 erent statusanderiaive Gate of Not Required
rea aes ‘Specily current status andtentative date of Not Required
completion
as aa Sree eure late ance di of Not Required
oly current status andientative date of Not Required
40 Heritage Spe
completion
ai| Resettiament& ‘Specify current status andtontative dato of Not Required
Rehabilitation completion. Project information Format
ao| PnelCiearance from | specify current status andtentative dato of Not Requted
Water Commission perpeieg
re Hyolegy Sealy cent ls aptetatve dao of Not Required
44] estate metre | SHPO Son slats ancora at of Not Required
45 [Anytber Pease spin | SPH Sent lls andere dae of Not Required
Ihether any court or
ibunal proceedings
48 pending that could impact Yes/No
12 project?
current Status of court or
/46altribunal proceedings if
pending
No
‘Two Crops
a7 Ne of Gps gown in Tepe one, to or fre crops a year
IT} rown in Rice, Maiz wer, Groundnut, Sugercane, Tobacco, Oilseeds,
48 |ESrenand ston" [SP ie” Supercar Mango We. Nese Wooton, Putt ad Vegoublscte
lis the Command area also ‘Stabilising of Ayacut under Telugu Ganga Project
49 |serviced through other ‘Yes/No
lirigation schemes
[Micro Irrigation existing |Specify area under Micro Irrigation in Hectares 3,68,500 Hectares (65%)
lunder Command area__land as percentage of Command area
jecify measures such as Canal
lutomation etc. if Yes)
(Canal efficiency measures | Yes! No,
|practiced
Z EB Be z 5 ena
60 Which Indicator is used to | Specify whather assessment Is through Cost- Cost- Benfit Ratio
lassess benefits? Benefit ratio/ ERR/IRR/NPV
51 [Indicator value
‘Specify Weighted Average Cost of Capital
Sie (WACO) (In case ERR/IRR/ NPV are the
7 +
‘ *. Project information Format
Yes! No
NO
IReport (DPR) or Detailed
lEngineering Design for the Yes! No
a mee
Total | ‘Counterpart funding being made available by Total
external | Project
assistance | st
| sought [implementing | State Central | Financier j
1 Agency | __Govt_ Govt | L
ININR
Tranche | 880Grores[ =~ ~+|~ ~~ |S
VTranche2 651 Crores | ja te ae
[Trenches 7 SOSOOPSC*~<“~:=Cs*~‘s*sé~Stsi‘“‘C;é‘;s*é*@CS ye ee
TOTAL 7 J ole =
TNUSD (One USD =... Watey
[ Trenehe i . ia ae cael | a
- = 2 —
‘Tranche 2 | }
‘Tranche 3 ~ ja ie
TOTAL - ~ me |e