You are on page 1of 29

OT DESIGN (11L MAJOR) AT KM 22.

350
ON RIGHT MAIN CANAL OF HALAHARVI RESERVOIR

Offtake at km : 22.350
ID : 4040.46
Total Cultivable Ayacut = 4040.46 Acres
Duty adopted = 130.00
Required discharge = 31.08 Cusecs or 0.880 Cumecs
Add : Transmission losses 20% = 0.176 Cumecs
Total discharge required = 1.056 Cumecs

Section adopted

Discharge (required) = 1.056 cumecs Discharge (provided) = 1.092 OK


V = 1.079 OK
Full supply depth (d) = 0.58 m Vo
B/D = 6.040
Bed width (b) = 3.50 m
Manning's rugosity coefficient (n) = 0.025
Free Board = 0.50 m

Side slopes ( Inner) = 1.5 :1


( Outer) = 2.0 :1

Bed fall = 1 in 3000 OR 0.00033

Area (A=(b+n*d)*d) = 3.500 + 0.58 x 1.5 x 0.58

= 2.535 Sq.m

P = b+2*(1+n*n)^.5*d
= 3.50 + 2 x 1.803 x 0.58

= 5.591 m

R = A
P
= 2.535 = 0.453 m
5.591

V = 1/n*R^2/3*S^1/2
2/3 0.5
= 1 X 0.453 X 0.00033
0.025
= 0.431 m/sec

Designed Discharge ( Q ) = V x A

Q = 0.431 x 2.535

= 1.092 cumecs

0.52
Vo = 0.530 x d m/sec

0.52
Vo = 0.530 x 0.580
= 0.399 m/sec

V = 0.431 = 1.079
Vo 0.399
1

F.S.D 0.580 m
:
5
1.

Bed width
3.50 m
DESIGN OF OFF-TAKE SLUICE(BARREL) FOR 11L MAJOR AT Km 22.350 ON RIGHT MAIN CANAL OF
HALAHARVI RESERVOIR

1) Hydraulic Particulars

Particulars of
Sl
Description Unit RIGHT MAIN CANAL OF
no 11L MAJOR
HALAHARVI RESERVOIR
1 Ayacut Acre 4040.46 ID

2 Discharge (Required) Cumecs 9.355 1.056

3 Discharge (Designed) Cumecs 9.498 1.092

4 Bed width m 14.500 3.500

5 Full Supply Depth m 1.140 0.580

6 Free board m 0.600 0.500

7 Side slopes (Inner / Outer) - 1.5 : 1 / 2 :1 1.5 : 1 / 2 :1

8 Bed fall - 1 in 6000 1 in 3000

9 Velocity m/s 0.514 0.431

10 Value of 'n' - 0.0250 0.0250

11 Top width of banks L/R m 5.050 / 2.500 4.000 / 1.50

12 C.B.L. m + 411.642 + 411.712

13 F.S.L. m + 412.782 + 412.292

14 T.B.L. m + 413.382 + 412.792

15 G.L. m + 413.105 + 413.105

2) DESIGN OF OFFTAKE CHANNEL

Ayacut = 4040.46 Acres (Duty Adopted - 130)


Discharge Required = 0.880 Cumecs
Add Transmission Losses 20% = 0.176 Cumecs
Total Required Discharge = 1.056 Cumecs
Bed Fall = 1 in 3000
Value of regocity 'n' = 0.0250
Side Slopes = 1.5 : 1 /2:1

Section Assumed = 3.500 x 0.580 m


2
Area A = 2.535 m
Perimetre P = 5.591 m
R = A/P = 0.453 m
R2/3 = 0.590 m
V = 1/n x R2/3 x (1/s)^0.5 = 0.431 m/sec
Disigned Discharge Qd = 1.092 Cumecs > 1.056 Cumecs HENCE OK
Vo =0.530 x d0.52 = 0.530 x 0.58 0.52 m/sec
= 0.399 m/sec
V/Vo = 0.431 / 0.399
= 1.079 HENCE OK
B/D Ratio = 6.034
3) SILL OF OFF-TAKE SLUICE

The off taking C.B.L. (sill level) of the distributory has been worked out as per the guide lines
of CE, CDO and the calculations are as under.
Percentage of off take
Height of sills above the bed of parent canal when the F.S.D.
discharge to parent
Above 2.13 m. 2.13 m to1.22 m. Below 1.22 m.
canal discharge.
15% and above. 0.070 m 0.070 m 0.070 m
10% to 15% 0.150 m 0.070 m 0.070 m
5% to 10% 0.300 m 0.150 m 0.070 m
2% to 5% 0.460 m 0.300 m 0.150 m
1% to 2% 0.610 m 0.460 m 0.300 m
0.5% to 1% 0.760 m 0.610 m 0.460 m
Less than 0.5% 0.910 m 0.760 m 0.610 m

Parent Canal Discharge at OT location : 9.355 cumecs


Distributory Discharge at OT location : 1.056 cumecs
% of offtake to parent canal discharge : 11.289 %
F. S. D. in parent canal at OT location. : 1.140 m

Therefore, the sill level of the OT should be kept 0.070 m above the sill level of parent
CBL in parent canal at OT location = + 411.642 m
Sill level in off taking canal at OT location = + 411.712 m
2. Area Of Ventway
Flow in parent canal in cumecs Operating level in parent canal
Less than 0.7 Cumecs Full supply condition
0.7 to 2.83 Cumecs Three fourth supply condition
Above 2.83 cumecs Half supply condition
Considering
Half Supply Depth in parent Canal , since the parent canal flow is above 2.830 cumecs.
Bed Level of parent canal = + 411.642 m
Q = 9.355 cumecs
Bed Width = 14.500 m 0.810
Bed fall = 1 in 6000
n = 0.0250 14.500
Side slope = 1.5 : 1 /2:1
Half supply discharge = 4.678 cumecs
By trial and error d = 0.810 m
Area = (b+nd)xd)
= 12.729
Perimeter = b+ 3.606 xd
= 17.420 m
R = A/P
= 0.731
R^2/3 = 0.811
V = (1/n)x(R^2/3)x(1/6000)^1/2
V = 0.419 m/sec
Discharge = VxA
Q = 5.333 cumecs >= 4.678 cumecs
HENCE OK
2.1 Driving head

Depth corresponding to full discharge = 0.810 m


FSL for Half FSD =
411.642 + 0.810
=
+ 412.452 m
FSL OF OFFTAKE CHANNEL =
+ 411.712 + 0.580
=
+ 412.292
DRIVING HEAD =
+ 412.452 - 412.292
+ 0.160 m
In order to get minimum driving head Provide the sill level of the off take flush with the parent channel
FSL in the Offtake channel = + 412.292 m
Driving head = + 412.452 - 412.292
= 0.160 m >= 0.150 m (min.Driv. head) HENCE OK
Q = Cd A Sqrt (2g h) (for circular vent ) Cd = 0.75

Q = Cd A Sqrt (2g h) (for square or Rectangular type vent)


Cd = 0.62

Where
Q = OT Discharge = 1.092 Cumecs
h = Driving head considered = 0.160 m
A = Area of vent way
Cd = Coefficient of discharge = 0.620

In this case "Provide Rectangular vent"

1.092 = 0.620 x A x Sqrt 3.139


A = 1.092
1.099
Area of vent = 0.994 Sqm

So, provide 1 vent of 1.60 x 0.70 m


the floor equal to the sill level
Depth of Opening 0.580 (available)
Therefore the area of vent =
provided 1.120 Sqm > 0.994 Sqm HENCE OK

3 Hoist platform level (HPL)

(A) Hoist platform level = Sill level + twice the height of gate + 0.30 + 0.15

Height of Vent = 0.70 m


Hoist platform level = + 411.712 + 2.000 x 0.70 + 0.05
+ 0.300 + 0.15
Hoist platform level = + 413.662 m

FSL in the parent channel = + 412.782 m

(B) Hoist platform level = FSL + 0.300


= + 412.782 + 0.300
= + 413.082 m

(C) Hoist platform level = TBL = + 413.382

Hence Provide platform level @ + 413.662 m (Max.of A,B,C)


Provide width of platform = 1.200 m

4 Length Of Barrel

Length of barrel = TWB + 2 X 0.50 = 5.050 + 2 x 0.50


= 6.05 m

5 Upstream Transition
The level of U/S sloped wing = Platform level - (Platform width /side slope)
= + 413.662 - 1.200 / 1.500
= + 412.862

The length of U/S transition (or) The Horizontal length of U/S sloped wing
= (level of U/S sloped wing - CBL of parent channel) * side slope
= 1.500 x 412.862 - 411.642

= 1.830 m

Providing 1 in 3 flare

width of transition = Barrel width +( 2 x horizontal length of U/s sloped wing / flare)
= 1.60 + 2 * 1.830
3
= 2.820 m
Provide 1 in 3 flare to reduce the width of transition thus the width works out = 2.820 m
6 Down stream cistern length
Barrel width = 1.60
Bed width of O.T Channel = 3.50
length of transition with 1 in 5
flare = 1.60 + 2 x 3.500
5
= 3.000 m (min.3.0m)
Hence, provide = 3.000 m.
7 SCOUR DEPTH ON U/S
Provide 750 mm depth of cut-off.

8 SCOUR DEPTH ON D/S

Discharge = 1.092 cumecs


Average bed width = 3.50 + 5.24 = 4.37 m
2
= 1.092 / 4.37 = 0.250 cumec/m

1/3
mean scour depth = 1.34 x {( q2 ) / f} 1/3
2
Assuming silt factor = 1.5 = 1.34 x 0.250
1.5

= 0.464 m

Maximum R = 1.50 x 0.464


= 0.697 m

Scour level = FSL - MAX Scour = + 412.292 - 0.697


= +411.595 m
Cistern foundation level is +410.837 hence no cut-off is required

9 Protection work

The O.T channel beyond d/s transition is provided with 100 mm thick lining in CCM15 for 5.0 m
length with 300 x300 mm profile wall at the end.

On U/s the side slope of parent channel on either side of U/s transition also provided with 100 mm thick
lining in CCM-15 for 5.0 m length with profile wall (300 x300) at the ends.
3) DESIGN OF ROOF SLAB ( UNDER EARTH BANK )

Unit wt of Concrete = 2.40 t


Unit wt of Earth = 2.10 t
Unit weight of R.C.C = 2.50 t
Clear span = 1.60 m
Bearing on either side = 0.450 m
Clear cover = 30 mm
+ 413.662

1.000
+ 412.662
450 0.25 450
750 + 412.412
1.60

0.70

300 1.30 + 411.712 300


+ 411.637

Assume over all depth of slab = 25 cm


Effective depth of slab = 25 - 3 - 0.8
( providing 16 mm dia at base as main reinforcement )
21.20 cm
Effective span of the slab is the least of the following
i) C/C of bearing = 1.60 + 0.45 + 0.45
2 2
= 2.05 m
ii) Clear span + Effective depth = 1.60 + 0.212 = 1.812 m

11.4 t 11.4 t

H = 1.000
Dispersion width along the span = L= 1.8+2H+0.5 H
Dispersion width perpendicular to the span = B=1.2+2 H +0.25
( As per Clause 207.3, IRC 6:2000 )
L = 1.80 + 2.00 + 0.50 = 4.300 B = 1.20 + 2.00 + 0.25 =3.450
Lx B = 14.835 Sq m
= 22.800 = 1.537 t
14.835
i) live Load (Class A Loading ) 1.537 t
ii) Weight of earth on slab = 1.00 x 2.10 = 2.100 t
iii) Self weight of slab = 25 x 2.50 = 0.625 t
100 Total 4.262 t

Maximum bending moment = Wl 2/8 2


= 4.262 x 1.812
8
= 1.749 t-m
Mix adopter is M20
t = 1500 Kg/ m2
c = 70 Kg/ m2
m = 13.333 (2800 / 3 x 70 )
1
n = 1 +t/mc
1
n = 1 + 1500
(neutral axis constant) 13.333 x 70

1
= 2.607

= 0.384 m

j = ( 1 - n/ 3 )
(Lever arm constant )
= 1 - 0.384
3

= 1 - 0.384
3
= 0.872 m
M. R = 1 b n x c x jd
2
= 1xb x 0.384 d x 70 x 0.872
2
2
= 11.720 bd
2
Kg/ m
5 2
1.749 x10 = 11.720 bd
2
Kg/ m

d= 1.7492 x 1000 x 100 =


11.720 x 100

= 12.22 < 21.20 cm


Hence o.k

Ast required = M = 1.749 x 1000 x 100


tjd 1500 x 0.872 x 21.2

= 6.308 cm2
Spacing = 2.011 X 100.00 = 31.89 cm
6.308
2
Provide 16 mm dia bars @ 15 Cm C/C , Ast provided = 13.410 cm
 = 100 x 5.03 = 335.147 cm
1.5
Every third bar bent upwards
2
Area of bent up bars = 13.410 / 3 = 4.470 cm
Distribution reinforcement = 0.12 x 25 x 100
100
= 3.000 cm 2
Spacing = 0.786 X 100.00 = 26.19 cm
3.00
2
Provide 10 mm dia bars @ 20 cm c/c, Ast provided = 3.929 cm

Check for partial rigidity at support


Max -ve BM @ support = wl2
24 2
= 4.262 x 1.812
24

= 0.5831 t-m

Ast required = 0.583 x 1000 x 100


1500 x 0.872 x 21.2

2 2
= 2.103 cm < 4.470 cm
Hence ok
Distribution reinforcement = 10 dia @ 200 c/c.

Check for shear :


Direct load = 4.262 x 1.60 = 3.410 t
2

Shear stress = 3.410 x 1000 = 1.608 Kg /cm2


100 x 21.2
% of tensile reinforcement coming on to support
= 2 13.41 x 100 = 0.420
3 100.00 x 21.2
Table : 23 IS 456 -2000 shear stress allowable with out shear reinforcement is as below
For M-20
100Ast/bd <= 0.15 0.25 0.5 0.75 1
tc 0.18 0.22 0.3 0.35 0.39

100 Ab permissible shear stress


bd ζ c N/ mm2

< 0.25 - 0.22


0.50 - 0.30 for % for 0.420 0.220 + 0.054
0.25 0.08
2
i.e for 0.42% = 0.274 N/ mm
Shear stress = Kζc

overall depth of >=300 275 250 225 200 175 <=150


k 1 1.05 1.1 1.150 1.2 1.25 1.3

= 1.100 x 0.274
= 0.302 N/mm2
2
i.e 3.018 Kg/cm > 1.608 Kg/cm2
Hence ok
30mm end cover
16ᶲmm ,@ 150c/c 10ᶲ mm ,@ 200 c/c 10ᶲ mm ,@ 200 c/c
B C 30mm end cover
v v v v v v v v v v .
250
v v v v v v v v v v v v v v v
450 240 A 240
16ᶲmm ,@ 450c/c every third bar
bent up.

1600

470 470
50 50
269 1320 269
Main steel Bentup Bar A

2440

Main steel B
2440

10ᶲ mm ,@ 200 c/c Distribution steel C


5050
4) DESIGN OF SLAB UNDER HEAD WALL
Clear span = 1.60 m Clear cover = 30 mm
Bearing = 0.45 m
Assume over all depth of slab = 25 cm
Effective depth of slab = 25 - 3 - 0.80
( providing 12 mm dia at base as main reinforcement )
= 21.20 cm
Effective span of the slab is the least of the following
i) C/C of bearing = 1.60 + 0.45 + 0.45
2 2
= 2.050 m
ii) Clear span + Effective depth = 1.60 + 0.212 = 1.812 m

i) load from Head wall = = 4.799 t


ii) Self weight of slab = 25 x 2.50 = 0.625 t
100 Total 5.424 t

Maximum bending moment = Wl 2/8 2


= 5.424 x 1.812
8
= 2.2261 t-m
Mix adopted is M20
t = 1500 Kg/ m2
c = 70
m = 13.333 (2800 / 3 x 70 )
1
n = 1 +t/mc
1
n = 1 + 1500
(neutral axis constant ) 13.333 x 70

1
= 2.607

= 0.384 m

j = (1 - n/ 3 )
(Lever arm constant)
= 1 - 0.384 d
3

= 1 - 0.384
3
= 0.872 m

M. R = 1 b n x c x jd
2
= 1xb x 0.384 d x 70 x 0.872
2
2
= 11.720 bd
Kg/ m2
5
2.226 x10 = 11.720 bd2
Kg/ m2

d= 2.226 x 1000 x 100 =


x 11.720 x 100

= 13.782 < 21.20 cm


Hence o.k

Ast required = M = 2.226 x 1000 x 100


tjd 1500 x 0.872 x 21.2

2
= 8.028 cm

Spacing = 2.011 X 100.00 = 25.06 cm


8.028
Provide 16 mm dia bars @ 15 cm C/C , Ast provided = 13.410 cm2
 = 100 x 5.03 = 33.51 cm
15
Every third bar bent up
Distribution reinforcement = 0.12 x 25 x 100
100
2
= 3.000 cm
Spacing = 0.786 X 100.000 = 26.19
3.000
Provide 10 mm dia bars @ 20 cm c/c, Ast provided = 3.929 cm2

Check for partial rigidity at support :


Max -ve BM @ support = wl2
24 2
= 5.424 x 1.812
24

= 0.742 t-m
Ast required = 0.742 x 1000 x 100
1500 x 0.872 x 21.2

2
= 2.676 cm
Bent up every third bar of bottom reinforcement which will take care of above moment
= 1 x 13.41 = 4.470 cm2 > 2.676 cm2
3 Hence ok
Distribution reinforcement = 10 dia @ 200 c/c.

Check for shear


Load = 5.424 Kg

Shear force (V)


= wl/2
= 5.424 x 1.600 / 2
= 4.339 Kg
Normal Shear stress (tv) = V / bd
= 4.339 / 100 x 21.2
2
= 2.047 Kg/cm
% of tensile steel = 100 Ast/bd
Ast = 13.4095238
= 100 x 13.410 / 100 x 21.200 x 2
= 0.422 % 3
For 0.422 % of tensile reinforcement the permissible shear stress (tc) in M20 grade concrete
100As/bd - For M20 tc
0.25 - 0.22
0.50 - 0.30
For 0.422 % 0.22 + 0.30 - 0.22 x 0.172
= 0.50 - 0.25 for M20
= 0.275 N/mm
2
100Ast/bd tc
2
tc = 2.749 kg/cm <= 0.15 0.18
k = factor for tc 0.25 0.22
0.5 0.3
0.75 0.35
1 0.39

overall depth of >=300 275 250 225 200 175 <=150


k 1 1.05 1.1 1.150 1.2 1.25 1.3

k.tc = 1.100 x 2.749


2 2
= 3.024 kg/cm > 2.047 kg/cm
HENCE SAFE
Check for bond
Maximum shear = 4.339 t

Bond stress = 4.339 x 1000


0.872 x 21.2 x
2 x 33.5
3
= 10.505 < 12.800 Kg / cm 2
Hence ok
30mm end cover
16ᶲmm ,@ 150c/c 10ᶲ mm ,@ 200 c/c 10ᶲ mm ,@ 200 c/c
30mm end cover
v v v v v v v v v v

v v v v v v v v v v v v v
450 240 240
16ᶲmm ,@ 450c/c every third bar
bent up.

1600
5.0 Aboutment under Earth Bank SECTION 4-4

+ 413.662
W5 12
1.000
W3' W1 + 412.662
0.25 Thick slab
288 + 412.412
W4 450

W6
W2 0.700
W3

0.30 0.550 0.750 + 411.712


411.637
W7 1.30 0.50
411.137
1.90

Clear span = 1.60 m


Bearing = 0.45 m
unit wt of concrete
= 2.400 t
unit wt of earth = 2.100 t
Unit weight of R.C.C
= 2.500 t
Surcharge load = 0.500 t
W1 = Self weight of slab + wt of earth over the slab
= 1.60 +2 x 0.45 x 0.25 x 2.5 + 1.60 +2 x 0.45 x 1.000 x 2.1
2 2
= 0.78125 + 2.625
= 3.406 t/m
Live load = 1.54
Total = 4.943
STRESS IN CONCRETE: ( Taking moments about 'A' )
S.NO Description Load LA Moment
(t) (m) (t-m)
W1 As calculated 4.943 1.075 5.314
W2 0.750 x 0.775 x 2.40 1.395 0.925 1.290
W3' 0.288 x 0.25 x 2.40 0.173 0.694 0.120
W3 0.5 x 0.550 x 1.025 x 2.40 0.676 0.367 0.248
W4 0.5 x 0.55 x 1.025 x 2.10 0.592 0.183 0.109
W5 0.838 x 1.000 x 2.10 1.760 0.419 0.737

Pv 0.0384 x( 2.525 ²- 1.500 ²)x 2.10 0.333 ----- ------


Ph 0.1338 x( 2.525 ²- 1.500 ²)x 2.10 1.159 0.430 0.499
V= 9.872 8.32
M= 8.32
Lever arm = M
V
= 8.32
9.87
= 0.842 m
Permissible Eccentricity = 1.30
6
= 0.217 m
Eccentricity 'e' = 0.842 - 1.300
2
= 0.192 m < 0.217
( Hence safe )

Max. Comp. Stress = 9.87 1+ 6x 0.192


1.300 1.300
= 14.323 t/Sqm ( Compression )
Min. Stress = 9.87 1- 6 x 0.192
1.300 1.300
= 0.865 t/Sqm ( Compression )
STRESS IN SOIL: ( Taking moments about 'B' )
S.NO Description Load LA Moment
(t) (h) (m) (t-m)
W1 As calculated 4.943 1.375 6.797
W2 0.75 x 0.77 x 2.40 1.395 1.225 1.709
W3' 0.288 x 0.250 x 2.40 0.173 0.994 0.172
W3 0.5 x 0.550 x 1.02 x 2.40 0.676 0.667 0.451
W4 0.5 x 0.55 x 1.02 x 2.10 0.592 0.483 0.286
W5 0.838 x 1.000 x 2.10 1.760 0.719 1.265
W6 0.300 x 2.025 x 2.10 1.276 0.150 0.191
w7 1.900 x 0.500 x 2.10 1.995 0.950 1.895
Pv 0.0384 x( 3.025 ²- 1.500 ²)x 2.10 0.556 ----- ------
V= 13.366 12.77
Ph 0.1338 x( 3.025 ²- 1.500 ²)x 2.10 1.939 0.640 1.24
M= 14.008

Lever arm = M
V
= 14.01
13.37
= 1.048 m

Permissible Eccentricity = 1.90


6
= 0.317 m

Eccentricity 'e' = 1.048 - 1.900


2
= 0.098 m < 0.317
( Hence safe )

Max. Comp. Stress = 13.37 1+ 6x 0.098


1.900 1.900

= 9.212 t/Sqm ( Compression )

Min. Stress = 13.37 1- 6x 0.098


1.900 1.900

= 4.858 t/Sqm ( Compression )

Check for sliding = μ ΣV / Ph


= 0.5 x 13.366 / 1.939
= 3.447 > 1.5 Hence SAFE
Check for over turning = ΣMR / ΣMO
= 12.766 / 1.242
= 10.280 > 2 Hence SAFE
6.0 Aboutment under Head Wall SECTION 4'-4'

+ 413.662
W5 12
1.000
W3' W1 + 412.662
0.25 Thick slab
288 + 412.412
W4 450

W6
W2 0.700
W3 1.025

0.30
0.550 0.75 + 411.712
411.637
W7 1.30 0.50
411.137
1.90

W1 = Maximum stress on slab under head wall (d/s ) as calculated.

= 4.799 t/m

unit wt of concrete = 2.40 t


unit wt of earth = 2.10 t
Unit weight of R.C.C = 2.50 t
Surcharge load = 0.50 t
STRESS IN CONCRETE: ( Taking moments about 'A' )
S.NO Description Load LA Moment
(t) (m) (t-m)
W1 As calculated 4.799 1.075 5.159
W2 0.750 x 0.775 x 2.4 1.395 0.925 1.290
W3' 0.288 x 0.25 x 2.4 0.173 0.694 0.120
W3 0.5 x 0.550 x 1.025 x 2.4 0.676 0.367 0.248
W4 0.5 x 0.55 x 1.025 x 2.1 0.592 0.183 0.109
W5 1.000 x 0.838 x 2.1 1.760 0.419 0.737

Pv 0.0384 x( 2.525 ²- 1.500 ²)x 2.1 0.333 ----- ------


Ph 0.1338 x( 2.525 ²- 1.500 ²)x 2.1 1.159 0.430 0.499
V= 9.728 8.16
M= 8.16
Lever arm = M
V
= 8.16
9.73
= 0.839 m
Permissible Eccentricity = 1.30
6
= 0.217 m
Eccentricity 'e' = 0.839 - 1.300
2
= 0.189 m < 0.217
( Hence safe )

Max. Comp. Stress = 9.73 1+ 6x 0.189


1.300 1.300
= 14.011 t/Sqm ( Compression )
Min. Stress = 9.73 1- 6 x 0.189
1.300 1.300
= 0.956 t/Sqm ( Compression )
STRESS IN SOIL: ( Taking moments about 'B' )
S.NO Description Load LA Moment
(t) (h) (m) (t-m)
W1 As calculated 4.799 1.375 6.599
W2 0.75 x 0.77 x 2.4 1.395 1.225 1.709
W3' 0.288 x 0.250 x 2.4 0.173 0.994 0.172
W3 0.5 x 0.550 x 1.02 x 2.4 0.676 0.667 0.451
W4 0.5 x 0.55 x 1.02 x 2.1 0.592 0.483 0.286
W5 1.00 x 0.84 x 2.1 1.760 0.719 1.265
W6 0.30 x 1.025 x 2.4 0.738 0.150 0.111
w7 1.900 x 0.500 x 2.4 2.280 0.950 2.166
Pv 0.0384 x( 3.025 ²- 1.500 ²)x 2.1 0.556 '----- ------
V= 12.969 12.76
Ph 0.1338 x( 3.025 ²- 1.500 ²)x 2.1 1.939 0.640 1.24
M= 14.00

Lever arm = M
V
= 14.00
12.97
= 1.08 m

Permissible Eccentricity = 1.90


6
= 0.317 m

Eccentricity 'e' = 1.08 - 1.900


2
= 0.130 m < 0.317
( Hence safe )

Max. Comp. Stress = 12.97 1+ 6x 0.130


1.900 1.900

= 9.628 t/Sqm ( Compression )

Min. Stress = 12.97 1- 6 x 0.130


1.900 1.900

= 4.024 t/Sqm ( Compression )

Check for sliding = μ ΣV / Ph


= 0.5 x 12.969 / 1.939
= 3.344 > 1.5 Hence SAFE
Check for over turning = ΣMR / ΣMO
= 12.758 / 1.242
= 10.273 > 2 Hence SAFE
7.0 DESIGN OF HOIST PLAT FORM FOR OFFTAKE

Simply Supported Slab 1.600 m Clear Span


The Following stress are adopted for concrete & steel
a) Concrete Mix M20 Grade
b) HYSD bars of steel are adopted
Stress are as follows :

Stresses
Tensile Stress t = 2300 Kg/cm
Concrete Stress = 70 Kg/cm

Co- Efficients :
m = 13.333 = 13
k = 0.283
j = 0.906
Q = 8.985

Thickness of slab assumed = 0.15 m

LOADS :
Weight of slab = 0.15 x 2500 = 375 KG/m2
Live Load = = 400 KG/m2
Total Load = 775 KG/m2

Providing 10 mm HYSD bars


Effective depth of slab = 15 - 3 - 0.50
= 11.5 cm
= 0.115 m

Effective span : As per CI 22.2 of IS 456 : 2000 Eff. Span shall be least of 1) & 2)

1) Clear span + Eff. Depth = 1.600 + 0.115 = 1.715 m


2) C/C of supports = 1.600 + 0.50 = 2.100 m
Effective Span = 1.715 m

Maximum Bending Movement = wl2 = 775 x 1.715 2

8 8
= 284.9 Kg. m
= 28493 Kg.cm
Effective depth required = 284.9 x 100
8.985 x 100
= 5.631 as against avaialble depth of 11.5 cm

Ast. Required = 28493.117


0.91 x 11.5 x 2300
= 1.19 Sq cm
Provide 12 mm Dia bars @ 30 cm C/C spacing Ast. Provided = 3.77 Sq cm

% of steel = 100 x ast. = 100 x 3.768


bd 100 x 11.5
= 0.33
Alternate bars are cranked up at supports i.e., at 0.15 = 0.15 x 1.600
= 0.24 m ( Where M = wl/16)

Distribution Steel :

Minimum distribution steel required = 0.12 x 11.5 x 100


100
= 1.38 Sq. cm
Provide 10 mm Dia bars @ 30 cm C/C spacing Ast. Provided. = 2.62 Sq.cm
As per clause 26.3.3 of IS 456-2000 spacing of bars should not be > 3d
= 3x 11.5 = 34.50 cm or 30 cm
Which ever is smaller
Hence Provide Distribution steel of 10 mm Dia of bar @ 30 cm c/c
Provide 10mm dia bars @ 30 cm c/c both ways at top.

Check for shear


Maximum shear force = wl = 775 x 1.715 = 664.56 Kgs
2 2

S.F. at "d" from face of the support = 664.6 x ( 1.2 - 0.115 )


( As per clause 22.6.2.1, IS 456-2000) 2
= 360.525 Kg.

Nominal Shear stress v = V = 360.525


bd 100 x 11.5
= 0.314 Kg/cm
= 0.031 N/mm

Half of the bars are tensile reinforcement carried to support p= 0.328 = 0.164 %
2
As per IS 456-2000, table 23 ( Page no.84) for

0.15 - 0.18
0.25 - 0.22 for % 0.164 0.180 + 0.006
0.10 0.04
i.e for 0.164% 0.186 N/ mm2

= 1.86 > 0.314 Kg/cm


Hence ok
Uplift Pressure

Uplift Head On Barrel Floor Under Trough Portion :


Proposed thickness of barrel floor = 0.50 m.
Grade of concrete for barrel floor = M 15
Thickness of wearing coat = 0.075 m.
Grade of concrete for weraing coat = M 20

When Canal runs full and Drain empty :


F.S.L in the main canal = + 412.782
Bottom level of the barrel floor = + 411.712
Total head acting = 1.070 m
considered
50 % of uplift head = 1.070 x 50 / 100
= 0.535 m.
Uplift head resisted by the self wt. Of the
floor concrete = ( 0.50 + 0.075 ) x 2.4/1.0
= 1.380 m.
Uplift head resisted by Arch action :

2R
411.712 l/2 l/2
411.637 t/2
1.30 1.60

R (R-t/2)

l/2 l/2
0.5
1.60

Distance between abutment


at floor level = 1.60 m.
2
If R is the radius of the arch, ( 2R - t/2 ) * t/2 = l /4
t = 0.5 m.
l = width of the floor = 1.60 m.
2
( 2R - 0.5 ) x 0.5 = 1.60
2 2 4
(2R - 0.250 ) x 0.250 = 0.640 m.
R = 1.405 m.
If m is the uplift head that can be resisted by the arch action of the floor with a limit of
mean pressure 'p' at crown of the arch as 50.000 t/m,2(R.S.N Murthy Booklet), then
p x t/2 = V x l/2 x cot a
cot a = R - t/2 = 1.405 - 0.50 / 2
l/2 1.60 / 2
= 1.155 = 1.444
0.8

V = p * t/2 = 50.00 * 0.50 / 2


l * (cot 0 ( )/2 1.60 * 1.444 / 2
= 12.500 = 10.823 m.
1.155
Total head resisted = 1.380 + 10.823 = 12.203 m.
Against uplift head of 0.535 m. Hence O.K.
8) WINGS AND RETURNS
8.1 DESIGN OF HEAD WALL (U/S)
SECTION 3-3 & 5-5
unit wt of concrete = 2.400 t
unit wt of earth = 2.100 t
+ 413.662
+ 413.662 HOIST PLAT FORM LEVEL
W3

W1

1.000
W2

0.100 0.500 + 412.662


A 0.600
0.25
W5
+ 412.412
Surcharge of 0.5 m is considered.Additional live load of W = 500 kg / m2 is also considered.
Taking moments about A (Stresses in concrete)

Force
Load Particulars L.A. Moment
V H
W 0.500 x 0.500 0.250 0.350 0.088
W1 0.500 x 1.000 x 2.400 1.200 0.350 0.42
W2 0.100 x 1.000 x 2.400 x 0.500 0.120 0.067 0.008
W3 0.100 x 1.000 x 2.100 x 0.500 0.105 0.033 0.004
Pv 0.0384 x 1.000 x 1.000 x 2.100 0.081 --- 0.52
Ph 0.1338 x 1.000 x 1.000 x 2.100 0.281 0.420 0.119
SV 1.756
SM 0.639

Lever arm = M/V = 0.6 / 1.76 = 0.364 m

Eccentricity = 0.364 - 0.600 /2 = 0.064 m

Permissible 'e' = 0.60 /6 = 0.100 > 0.064 ( Hence safe )

Max. comp. Stress = 1.76 x ( 1 + 6 x 0.064 ) = 4.799 t/sq.m.


0.600 0.600

Min. Stress = 1.76 x ( 1 - 6 x 0.064 ) = 1.053 t/sq.m.


0.600 0.600
8.2 DESIGN OF SLOPED WING WALLS (U/S) SECTION 1-1

unit wt of concrete = 2.400 t


unit wt of earth = 2.100 t
+ 412.862
W3

W4 W1
1.295

W2

0.300 0.200 0.500 0.300 + 411.567


0.700
0.50
W5
1.300 + 411.067

Taking moments about A (Stresses in concrete)


Force
Load Particulars L.A. Moment
V H
W1 0.500 x 1.295 x 2.400 1.6 0.450 0.700
W2 0.200 x 1.295 x 2.400 x 0.500 0.3 0.133 0.042
W3 0.200 x 1.295 x 2.100 x 0.500 0.3 0.067 0.019
Pv 0.0384 x 1.295 x 1.295 x 2.100 0.1 --- 0.761
Ph 0.1338 x 1.295 x 1.295 2.100 0.471 0.544 0.257
SV 2.272
SM 1.018

Lever arm = M/V = 1.018 / 2.27 = 0.448 m

Eccentricity = 0.448 - 0.700 /2 = 0.098 m

Permissible 'e' = 0.70 /6 = 0.117 > 0.098 ( Hence safe )

Max. comp. Stress = 2.272 x ( 1 + 6 x 0.098 ) = 5.972 t/sq.m.


0.700 0.700

Min. Stress = 2.272 x ( 1 - 6 x 0.098 ) = 0.519 t/sq.m.


0.700 0.700
Taking moments about B (Stresses on soil)
Force
Load Particulars L.A. Moment
V H
W1 0.500 x 1.295 x 2.400 1.554 0.750 1.166
W2 0.200 x 1.295 x 2.400 x 0.50 0.311 0.433 0.135
W3 0.200 x 1.295 x 2.100 x 0.50 0.272 0.367 0.1
W4 0.300 x 1.295 x 2.100 0.816 0.15 0.123
W5 1.300 x 0.500 x 2.400 1.560 0.650 1.014
Pv 0.0384 x 1.795 x 1.795 x 2.100 0.260 --- 2.538
Ph 0.1338 x 1.795 x 1.795 x 2.100 0.905 0.754 0.683
Sv 4.772
SM 3.221

Lever arm = M/V = 3.2 / 4.77 = 0.675 m

Eccentricity = 0.675 - 1.300 /2 = 0.025 m

Permissible 'e' = 1.30 /6 = 0.217 > 0.025 ( Hence safe )

Max. comp. Stress = 4.77 x ( 1 + 6 x 0.025 ) = 4.095 t/sq.m.


1.300 1.300

Min. Stress = 4.77 x ( 1 - 6 x 0.025 ) = 3.248 t/sq.m.


1.300 1.300

Check for sliding = μ ΣV / Ph


= 0.5 x 4.772 / 0.905
= 2.636 > 1.5 Hence SAFE
Check for over turning = ΣMR / ΣMO
= 2.538 / 0.683
= 3.716 > 2 Hence SAFE
8.3 DESIGN OF PIAL WALL SECTION 2-2

unit wt of concrete = 2.400 t


unit wt of earth = 2.100 t
+ 413.662
W3

W4 W1
2.395

W2

0.300 0.800 0.500 0.300 + 411.267


1.300
0.50
W5
1.900 + 410.767

Taking moments about A (Stresses in concrete)


Force
Load Particulars L.A. Moment
V H
W1 0.500 x 2.395 x 2.400 2.9 1.050 3.018
W2 0.800 x 2.395 x 2.400 x 0.500 2.3 0.533 1.227
W3 0.800 x 2.395 x 2.100 x 0.500 2.0 0.267 0.537
Pv 0.0384 x 2.395 x 2.395 x 2.100 0.5 --- 4.782
Ph 0.1338 x 2.395 x 2.395 2.100 1.612 1.006 1.622
SV 7.648
SM 6.404

Lever arm = M/V = 6.40 / 7.65 = 0.837 m

Eccentricity = 0.837 - 1.300 /2 = 0.187 m

Permissible 'e' = 1.30 /6 = 0.217 > 0.187 ( Hence safe )

Max. comp. Stress = 7.65 x ( 1 + 6 x 0.187 ) = 10.960 t/sq.m.


1.300 1.300

Min. Stress = 7.65 x ( 1 - 6 x 0.187 ) = 0.805 t/sq.m.


1.300 1.300
Taking moments about B (Stresses on soil)
Force
Load Particulars L.A. Moment
V H
W1 0.500 x 2.395 x 2.400 2.874 1.350 3.88
W2 0.800 x 2.395 x 2.400 x 0.5 2.30 0.833 1.916
W3 0.800 x 2.395 x 2.100 x 0.5 2.012 0.567 1.141
W4 0.300 x 2.395 x 2.100 1.509 0.150 0.227
W5 1.900 x 0.500 x 2.400 2.280 0.950 2.166
Pv 0.0384 x 2.895 x 2.895 x 2.100 0.676 --- 9.33
Ph 0.1338 x 2.895 x 2.895 2.100 2.355 1.216 2.864
Sv 11.650
SM 12.194

Lever arm = M/V = 12.2 / 11.65 = 1.047 m

Eccentricity = 1.047 - 1.900 /2 = 0.097 m

Permissible 'e' = 1.90 /6 = 0.317 > 0.097 ( Hence safe )

Max. comp. Stress = 11.65 x ( 1 + 6 x 0.097 ) = 8.010 t/sq.m.


1.900 1.900

Min. Stress = 11.65 x ( 1 - 6 x 0.097 ) = 4.253 t/sq.m.


1.900 1.900

Check for sliding = μ ΣV / Ph


= 0.5 x 11.65 / 2.355
= 2.474 > 1.5 Hence SAFE
Check for over turning = ΣMR / ΣMO
= 9.33 / 2.864
= 3.258 > 2 Hence SAFE
8.4 DESIGN OF WING AND RETURN (D/S)
SECTION 6-6 , 7-7 and 8-8
unit wt of concrete = 2.400 t
unit wt of earth = 2.100 t
+ 413.662 G.L
W3

W4 W1
2.025

W2

0.300 0.600 0.500 0.300 + 411.637


1.100
0.50
W5
1.700 + 411.137

Taking moments about A (Stresses in concrete)


Force
Load Particulars L.A. Moment
V H
W1 0.500 x 2.025 x 2.400 2.430 0.850 2.066
W2 0.600 x 2.025 x 2.400 x 0.500 1.46 0.400 0.584
W3 0.600 x 2.025 x 2.100 x 0.500 1.276 0.200 0.256
Pv 0.0384 x 2.025 x 2.025 x 2.100 0.331 --- 2.906
Ph 0.1338 x 2.025 x 2.025 2.100 1.152 0.850 0.98
SV 5.494
SM 3.886

Lever arm = M/V = 3.9 / 5.49 = 0.707 m

Eccentricity = 0.707 - 1.100 /2 = 0.157 m

Permissible 'e' = 1.10 /6 = 0.183 > 0.157 ( Hence safe )

Max. comp. Stress = 5.49 x ( 1 + 6 x 0.157 ) = 9.272 t/sq.m.


1.100 1.100

Min. Stress = 5.49 x ( 1 - 6 x 0.157 ) = 0.717 t/sq.m.


1.100 1.100
Taking moments about B (Stresses on soil)

Force
Load Particulars L.A. Moment
V H
W1 0.500 x 2.025 x 2.400 2.430 1.150 2.795
W2 0.600 x 2.025 x 2.400 x 0.50 1.46 0.700 1.021
W3 0.600 x 2.025 x 2.100 x 0.50 1.276 0.500 0.638
W4 0.300 x 2.025 x 2.100 1.276 0.15 0.192
W5 1.700 x 0.500 x 2.400 2.040 0.85 1.734
Pv 0.0384 x 2.525 x 2.525 x 2.100 0.514 --- 6.38
Ph 0.1338 x 2.525 x 2.525 2.100 1.791 1.060 1.9
Sv 8.994
SM 8.280

Lever arm = M/V = 8.3 / 8.99 = 0.921 m

Eccentricity = 0.921 - 1.700 /2 = 0.071 m

Permissible 'e' = 1.70 /6 = 0.283 > 0.071 ( Hence safe )

Max. comp. Stress = 8.99 x ( 1 + 6 x 0.071 ) = 6.616 t/sq.m.


1.700 1.700

Min. Stress = 8.99 x ( 1 - 6 x 0.071 ) = 3.965 t/sq.m.


1.700 1.700

Check for sliding = μ ΣV / Ph


= 0.5 x 8.994 / 1.791
= 2.510 > 1.5 Hence SAFE
Check for over turning = ΣMR / ΣMO
= 6.38 / 1.9
= 3.358 > 2 Hence SAFE
ESTIMATE FOR FABRICTION & ERECTION OF M S SHUTTERS
Vent Size - 1.6 x 0.7 Shutter size : 1.80 x 0.90 Qty- 1 No

Quantity
S.no. Material No's Unit Quantity Weight
in kgs
1 a) Skin plate 1 Sqm 1.620 62.83 kg/sqm 101.78
M.S. Plate -8mm x 1800mmx 900mm
b. M.S. Angle ISA 50x50x6mm size for
Shutter frame Length- 1.800m 4 m 7.200 4.50 kg/m 32.40
Stiffeners length -0.900m 2 m 1.800 4.50 kg/m 8.10
c. Lifting plates
10mm x 150mm x 300mm 2 sqm 0.090 78.54 kg/sqm 7.07
2 a) Screw rod
50mm dia. X 2.50m 1 m 2.500 15.40 kg/m 38.50
b) Connecting plate
50mm x 80mm x 200mm 1 sqm 0.016 302.70 kg/m 4.84
c) pins 1"dia. X 4" 2 Nos 2.000 0.50 kg/no 1.00

3 a) Hoist beam
Channel ISMC 200x75mm for
platform length -1.20m 2 m 2.400 22.30 Kg/m 53.52
b) Fixing plate
20mm x 200mm x 400mm 2 sqm 0.160 157.08 kg/sqm 25.13
c)Foundation bolts
25mm dia. X 450mm 2 m 1.800 3.85 Kg/m 6.93

4 a) Groove channel
ISMC 100mm x 50mm x 2.5mm 1 m 7.200 9.56 Kg/m 68.83
b) Anchorages
16 dia. X 300mm 6 m 1.800 1.53 Kg/m 2.75
Sub Total 350.87
Wastage 5% 17.54
Total 368.41
wt.of Gear box 35
Total 403.41
Say Kgs 403.00
Area of Painting
1 Shutter -2 sides = 3.240 Sqm

2 Shutter frame = 0.708 Sqm

3 Lifting plate = 0.180 Sqm

4 Connecting plate = 0.016 Sqm

5 Hoist beam channel = 1.620 Sqm

6 Fixing plate = 0.160 Sqm


Total Area 5.924 Sqm
Say 6.00 Sqm
DETAILED ESTIMATE
Data SUPPLY AND FIXING OF MS SHUTTER WITH SCREW ROD,GEAR BOX AND
Code MS CHANNELS FOR 11L MAJOR
Vent
1 2 Qty Nos Unit Total qty
size
1 IRR-GAW- Design, fabrication, supply, erection, testing and
2-14 commissioning of adequate capacity screw gear type hoist
consisting of supporting structure, platform, ladder etc.,
with all accessories fortype hoist consisting of supporting
structure, platform, ladder etc., with all accessories for
operating canal escape / regulator gate including cost of all
materials, machinery, labour, cutting, bending, aligning,
anchoring, welding,finishing etc.,complete with all leads
and lifts.
1.6 x 0.7 403.00 1 kgs 403.00
Total Kgs 403.00
2 IRR-GAW- Surface cleaning of metal surfaces by chemical cleaners
4-4 and then by hand and power tool cleaners and removing
dust. After cleaning,applying primary coat with one coat of
Zinc rich epoxy primer to athickness of 40 microns
,followed by finishing coats 4 coats with coal tar epoxy
with material, labour,and all accessories with all leads and
lifts
1.6 x 0.7 6.00 1 sqm 6.00
Total Sqm 6.00
DETAILED ESTIMATE FOR 11L MAJOR (BARREL TYPE) AT KM 22.350 OF RIGHT MAIN CANAL OF
HALAHARVI RESERVOIR

Measurements
S.No. DESCRIPITION Units No's Quantity
length breadth depth
1 2 3 4 5 6 7 8
Excavation in all kinds of soil including boulders upto 0.3
m diameter for canal, seating of embankment, filter drains
/ catch water drains etc., including dressing bed and sides
to required level and profile, cost of all materials,
1
machinery, labour, placing the excavated soil neatly in
dump area or for the formation of service road /
embankment as directed etc., complete with initial lead
upto 1 km and all lifts.( IRR-CCDW-1-2 )
U/S Wing walls Cum 2 2.130 1.30 2.038 11.290
Pail Wall Cum 2 1.200 1.90 2.338 10.660
Abutments Cum 2 6.050 1.90 1.968 45.240
U/s Apron Cum 1 3.330 2.21 2.038 15.000
(2.82+1.6)/2
Between abutments Cum 1 6.050 1.60 2.038 19.730
Cut off walls U/s Cum 1 3.420 0.49 0.75 1.260
D/S Wing walls Cum 2 3.770 1.70 2.038 26.120
D/S Return walls Cum 2 3.825 1.70 2.038 26.500
Profile walls Cum 1 6.440 0.30 0.300 0.580
D/s Apron Cum 1 3.500 2.55 2.038 18.190
(3.5+1.6)/2
Cut off wall D/s Cum 1 3.500 0.49 0.875 1.500
U/s for Bed Cum 1 5.000 14.500 0.100 7.250
U/s for sides Cum 2 5.000 3.377 0.100 3.380
D/s Lining for beds & sides Cum 1 5.000 6.913 0.100 3.460
Total Cum 190.160
Providing and laying insitu vibrated M-15 ( 28 days cube
compressive strength not less than 15 N / sq mm ) grade
cement concrete using 40 mm down size approved,
clean, hard, graded aggregates for foundation filling
2 and Cutoff walls including cost of all materials,
machinery, labour, formwork, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts. (
IRR-CCDW-2-3 )
U/S Wing walls Cum 2 2.130 1.30 0.50 2.770
Pail Wall Cum 2 1.200 1.90 0.50 2.280
Abutments Cum 2 6.050 1.90 0.50 11.500
U/s Apron Cum 1 3.330 2.21 0.50 3.680
Between abutments Cum 1 6.050 1.60 0.5 4.840
Cut off walls U/s Cum 1 3.420 0.49 0.75 1.260
D/S Wing walls Cum 2 3.770 1.70 0.5 6.410
D/S Return walls Cum 2 3.825 1.70 0.5 6.500
Profile walls Cum 1 6.440 0.30 0.30 0.580
D/s Apron Cum 1 3.500 2.55 0.50 4.460
Cut off wall D/s Cum 1 3.500 0.49 0.875 1.500
Total Cum 45.780
Providing and laying insitu vibrated M-15 ( 28 days cube
compressive strength not less than 15 N / sq mm ) grade
cement concrete using 40 mm down size approved,
clean, hard, graded aggregates for sub-structure / super-
3 structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating,
finishing, curing etc., complete with initial lead upto 50
m and all lifts. ( IRR-CCDW-2-21 ) For Abutment, Wing
& Return Walls
U/S Wing walls Cum 2 1.830 0.60 1.295 2.840
(0.7+0.5)/2
Abutments Cum 2 6.050 0.88 0.70 7.410
(1.3+0.45)/2
U.s Head wall Cum 1 2.500 0.55 1.00 1.380
(0.6+0.5)/2
Pail wall Cum 1 0.700 0.90 2.395 1.510
(1.3+0.5)/2
D/s head wall Cum 1 2.500 0.55 1.00 1.380
(0.6+0.5)/2
D/S Wing walls Cum 2 3.770 0.80 2.025 12.210
(1.1+0.5)/2
D/S Return walls Cum 2 3.525 0.80 2.025 11.420
(1.1+0.5)/2
Total Cum 38.150
Providing and laying insitu vibrated M-20 ( 28 days cube
compressive strength not less than 20 N / sq mm ) grade
cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for Hoist Slab including
4 cost of all materials,machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with
initial lead upto 50 m and all lifts. ( IRR-CCDW-2-
24 )
Slab over Barrel Cum 1 6.050 2.05 0.25 3.100
Hoist Slab Cum 1 0.700 2.05 0.15 0.220
Total Cum 3.320
Providing and laying insitu M- 20 ( 28 days cube
compressive strength not less than 20 N / sqmm ) grade
cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for wearing coat
5 including cost of all materials, machinery, labour,
formwork, cleaning, batching, mixing, placing in position in
alternate panels, levelling, compacting, finishing, curing,
packing joints with asphalt mortar etc., complete with
initial lead upto 50 m and all lifts. ( IRR-
CCDW-2-26 )
Wearing coat over U/s Apron Cum 1 3.330 2.21 0.075 0.550
Wearing coat over D/s Apron Cum 1 3.500 2.55 0.075 0.670
Wearing coat over Crest Cum 1 6.050 1.60 0.075 0.730
Total Cum 1.950
Providing and laying insitu vibrated M-15 ( 28 days cube
compressive strength not less than 15 N /sq mm ) grade
cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for bed and Side lining
for u/s and d/s of structures(100 mm thick) including
6 finishing the junction of bed and sides to required
curveture, cost of all materials, machinery, labour,
formwork including supports, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.

U/s for Bed Cum 1 5.000 14.500 0.100 7.250


U/s for sides Cum 2 5.000 3.377 0.100 3.380
D/s for Bed & Sides Cum 1 5.000 6.913 0.100 3.460
Total Cum 14.090
Providing, fabricating and placing in position
reinforcement steel bars for RCC works including
cleaning, straightening, cutting, bending, hooking, lapping,
7 welding wherever required,tying with 1.25 mm dia soft
annealed steel wire, including cost of all materials,
machinery, labour etc., complete with initial lead upto 50
and all lifts. ( IRR-CCDW-2-1 )
No L T.L Wt. T.Wt.
For Roof Slab
16ᶲmm ,@ 150c/c for Top and Bottom 2 41.0 2.05 84.050 1.580 265.600
16ᶲmm ,@ 450c/c every third barbent up. 1 14.0 2.05 28.700 1.580 45.350
Distribution steel for Top 10ᶲ mm ,@ 200 c/c 1 11.0 6.050 66.550 0.620 41.260
Distribution steel for Bottom 10ᶲ mm ,@ 200 c/c 1 11.0 6.050 66.550 0.620 41.260
For Hoist Slab
12ᶲmm ,@ 300c/c for Top and Bottom 2 3.0 2.05 6.150 0.890 10.950
12ᶲmm ,@ 300c/c for Top and Bottom alternative are
1 2.0 2.05 4.100 0.890 3.650
bentup
Distribution steel for Top 10ᶲ mm ,@ 300 c/c 1 8.0 0.700 5.600 0.620 3.470
Distribution steel for Bottom 10ᶲ mm ,@ 300 c/c 1 8.0 0.700 5.600 0.620 3.470
Kgs 415.010
Wastage at 5% 20.750
Total Kgs 436.00
Supply and fixing of MS shutter with screw rod,gear box
8
and MS channels ( IRR-GAW-2-14 & 4-4 )
For Offtake No 1 1

You might also like