Professional Documents
Culture Documents
350
ON RIGHT MAIN CANAL OF HALAHARVI RESERVOIR
Offtake at km : 22.350
ID : 4040.46
Total Cultivable Ayacut = 4040.46 Acres
Duty adopted = 130.00
Required discharge = 31.08 Cusecs or 0.880 Cumecs
Add : Transmission losses 20% = 0.176 Cumecs
Total discharge required = 1.056 Cumecs
Section adopted
= 2.535 Sq.m
P = b+2*(1+n*n)^.5*d
= 3.50 + 2 x 1.803 x 0.58
= 5.591 m
R = A
P
= 2.535 = 0.453 m
5.591
V = 1/n*R^2/3*S^1/2
2/3 0.5
= 1 X 0.453 X 0.00033
0.025
= 0.431 m/sec
Designed Discharge ( Q ) = V x A
Q = 0.431 x 2.535
= 1.092 cumecs
0.52
Vo = 0.530 x d m/sec
0.52
Vo = 0.530 x 0.580
= 0.399 m/sec
V = 0.431 = 1.079
Vo 0.399
1
F.S.D 0.580 m
:
5
1.
Bed width
3.50 m
DESIGN OF OFF-TAKE SLUICE(BARREL) FOR 11L MAJOR AT Km 22.350 ON RIGHT MAIN CANAL OF
HALAHARVI RESERVOIR
1) Hydraulic Particulars
Particulars of
Sl
Description Unit RIGHT MAIN CANAL OF
no 11L MAJOR
HALAHARVI RESERVOIR
1 Ayacut Acre 4040.46 ID
The off taking C.B.L. (sill level) of the distributory has been worked out as per the guide lines
of CE, CDO and the calculations are as under.
Percentage of off take
Height of sills above the bed of parent canal when the F.S.D.
discharge to parent
Above 2.13 m. 2.13 m to1.22 m. Below 1.22 m.
canal discharge.
15% and above. 0.070 m 0.070 m 0.070 m
10% to 15% 0.150 m 0.070 m 0.070 m
5% to 10% 0.300 m 0.150 m 0.070 m
2% to 5% 0.460 m 0.300 m 0.150 m
1% to 2% 0.610 m 0.460 m 0.300 m
0.5% to 1% 0.760 m 0.610 m 0.460 m
Less than 0.5% 0.910 m 0.760 m 0.610 m
Therefore, the sill level of the OT should be kept 0.070 m above the sill level of parent
CBL in parent canal at OT location = + 411.642 m
Sill level in off taking canal at OT location = + 411.712 m
2. Area Of Ventway
Flow in parent canal in cumecs Operating level in parent canal
Less than 0.7 Cumecs Full supply condition
0.7 to 2.83 Cumecs Three fourth supply condition
Above 2.83 cumecs Half supply condition
Considering
Half Supply Depth in parent Canal , since the parent canal flow is above 2.830 cumecs.
Bed Level of parent canal = + 411.642 m
Q = 9.355 cumecs
Bed Width = 14.500 m 0.810
Bed fall = 1 in 6000
n = 0.0250 14.500
Side slope = 1.5 : 1 /2:1
Half supply discharge = 4.678 cumecs
By trial and error d = 0.810 m
Area = (b+nd)xd)
= 12.729
Perimeter = b+ 3.606 xd
= 17.420 m
R = A/P
= 0.731
R^2/3 = 0.811
V = (1/n)x(R^2/3)x(1/6000)^1/2
V = 0.419 m/sec
Discharge = VxA
Q = 5.333 cumecs >= 4.678 cumecs
HENCE OK
2.1 Driving head
Where
Q = OT Discharge = 1.092 Cumecs
h = Driving head considered = 0.160 m
A = Area of vent way
Cd = Coefficient of discharge = 0.620
(A) Hoist platform level = Sill level + twice the height of gate + 0.30 + 0.15
4 Length Of Barrel
5 Upstream Transition
The level of U/S sloped wing = Platform level - (Platform width /side slope)
= + 413.662 - 1.200 / 1.500
= + 412.862
The length of U/S transition (or) The Horizontal length of U/S sloped wing
= (level of U/S sloped wing - CBL of parent channel) * side slope
= 1.500 x 412.862 - 411.642
= 1.830 m
Providing 1 in 3 flare
width of transition = Barrel width +( 2 x horizontal length of U/s sloped wing / flare)
= 1.60 + 2 * 1.830
3
= 2.820 m
Provide 1 in 3 flare to reduce the width of transition thus the width works out = 2.820 m
6 Down stream cistern length
Barrel width = 1.60
Bed width of O.T Channel = 3.50
length of transition with 1 in 5
flare = 1.60 + 2 x 3.500
5
= 3.000 m (min.3.0m)
Hence, provide = 3.000 m.
7 SCOUR DEPTH ON U/S
Provide 750 mm depth of cut-off.
1/3
mean scour depth = 1.34 x {( q2 ) / f} 1/3
2
Assuming silt factor = 1.5 = 1.34 x 0.250
1.5
= 0.464 m
9 Protection work
The O.T channel beyond d/s transition is provided with 100 mm thick lining in CCM15 for 5.0 m
length with 300 x300 mm profile wall at the end.
On U/s the side slope of parent channel on either side of U/s transition also provided with 100 mm thick
lining in CCM-15 for 5.0 m length with profile wall (300 x300) at the ends.
3) DESIGN OF ROOF SLAB ( UNDER EARTH BANK )
1.000
+ 412.662
450 0.25 450
750 + 412.412
1.60
0.70
11.4 t 11.4 t
H = 1.000
Dispersion width along the span = L= 1.8+2H+0.5 H
Dispersion width perpendicular to the span = B=1.2+2 H +0.25
( As per Clause 207.3, IRC 6:2000 )
L = 1.80 + 2.00 + 0.50 = 4.300 B = 1.20 + 2.00 + 0.25 =3.450
Lx B = 14.835 Sq m
= 22.800 = 1.537 t
14.835
i) live Load (Class A Loading ) 1.537 t
ii) Weight of earth on slab = 1.00 x 2.10 = 2.100 t
iii) Self weight of slab = 25 x 2.50 = 0.625 t
100 Total 4.262 t
1
= 2.607
= 0.384 m
j = ( 1 - n/ 3 )
(Lever arm constant )
= 1 - 0.384
3
= 1 - 0.384
3
= 0.872 m
M. R = 1 b n x c x jd
2
= 1xb x 0.384 d x 70 x 0.872
2
2
= 11.720 bd
2
Kg/ m
5 2
1.749 x10 = 11.720 bd
2
Kg/ m
= 6.308 cm2
Spacing = 2.011 X 100.00 = 31.89 cm
6.308
2
Provide 16 mm dia bars @ 15 Cm C/C , Ast provided = 13.410 cm
= 100 x 5.03 = 335.147 cm
1.5
Every third bar bent upwards
2
Area of bent up bars = 13.410 / 3 = 4.470 cm
Distribution reinforcement = 0.12 x 25 x 100
100
= 3.000 cm 2
Spacing = 0.786 X 100.00 = 26.19 cm
3.00
2
Provide 10 mm dia bars @ 20 cm c/c, Ast provided = 3.929 cm
= 0.5831 t-m
2 2
= 2.103 cm < 4.470 cm
Hence ok
Distribution reinforcement = 10 dia @ 200 c/c.
= 1.100 x 0.274
= 0.302 N/mm2
2
i.e 3.018 Kg/cm > 1.608 Kg/cm2
Hence ok
30mm end cover
16ᶲmm ,@ 150c/c 10ᶲ mm ,@ 200 c/c 10ᶲ mm ,@ 200 c/c
B C 30mm end cover
v v v v v v v v v v .
250
v v v v v v v v v v v v v v v
450 240 A 240
16ᶲmm ,@ 450c/c every third bar
bent up.
1600
470 470
50 50
269 1320 269
Main steel Bentup Bar A
2440
Main steel B
2440
1
= 2.607
= 0.384 m
j = (1 - n/ 3 )
(Lever arm constant)
= 1 - 0.384 d
3
= 1 - 0.384
3
= 0.872 m
M. R = 1 b n x c x jd
2
= 1xb x 0.384 d x 70 x 0.872
2
2
= 11.720 bd
Kg/ m2
5
2.226 x10 = 11.720 bd2
Kg/ m2
2
= 8.028 cm
= 0.742 t-m
Ast required = 0.742 x 1000 x 100
1500 x 0.872 x 21.2
2
= 2.676 cm
Bent up every third bar of bottom reinforcement which will take care of above moment
= 1 x 13.41 = 4.470 cm2 > 2.676 cm2
3 Hence ok
Distribution reinforcement = 10 dia @ 200 c/c.
v v v v v v v v v v v v v
450 240 240
16ᶲmm ,@ 450c/c every third bar
bent up.
1600
5.0 Aboutment under Earth Bank SECTION 4-4
+ 413.662
W5 12
1.000
W3' W1 + 412.662
0.25 Thick slab
288 + 412.412
W4 450
W6
W2 0.700
W3
Lever arm = M
V
= 14.01
13.37
= 1.048 m
+ 413.662
W5 12
1.000
W3' W1 + 412.662
0.25 Thick slab
288 + 412.412
W4 450
W6
W2 0.700
W3 1.025
0.30
0.550 0.75 + 411.712
411.637
W7 1.30 0.50
411.137
1.90
= 4.799 t/m
Lever arm = M
V
= 14.00
12.97
= 1.08 m
Stresses
Tensile Stress t = 2300 Kg/cm
Concrete Stress = 70 Kg/cm
Co- Efficients :
m = 13.333 = 13
k = 0.283
j = 0.906
Q = 8.985
LOADS :
Weight of slab = 0.15 x 2500 = 375 KG/m2
Live Load = = 400 KG/m2
Total Load = 775 KG/m2
Effective span : As per CI 22.2 of IS 456 : 2000 Eff. Span shall be least of 1) & 2)
8 8
= 284.9 Kg. m
= 28493 Kg.cm
Effective depth required = 284.9 x 100
8.985 x 100
= 5.631 as against avaialble depth of 11.5 cm
Distribution Steel :
Half of the bars are tensile reinforcement carried to support p= 0.328 = 0.164 %
2
As per IS 456-2000, table 23 ( Page no.84) for
0.15 - 0.18
0.25 - 0.22 for % 0.164 0.180 + 0.006
0.10 0.04
i.e for 0.164% 0.186 N/ mm2
2R
411.712 l/2 l/2
411.637 t/2
1.30 1.60
R (R-t/2)
l/2 l/2
0.5
1.60
W1
1.000
W2
Force
Load Particulars L.A. Moment
V H
W 0.500 x 0.500 0.250 0.350 0.088
W1 0.500 x 1.000 x 2.400 1.200 0.350 0.42
W2 0.100 x 1.000 x 2.400 x 0.500 0.120 0.067 0.008
W3 0.100 x 1.000 x 2.100 x 0.500 0.105 0.033 0.004
Pv 0.0384 x 1.000 x 1.000 x 2.100 0.081 --- 0.52
Ph 0.1338 x 1.000 x 1.000 x 2.100 0.281 0.420 0.119
SV 1.756
SM 0.639
W4 W1
1.295
W2
W4 W1
2.395
W2
W4 W1
2.025
W2
Force
Load Particulars L.A. Moment
V H
W1 0.500 x 2.025 x 2.400 2.430 1.150 2.795
W2 0.600 x 2.025 x 2.400 x 0.50 1.46 0.700 1.021
W3 0.600 x 2.025 x 2.100 x 0.50 1.276 0.500 0.638
W4 0.300 x 2.025 x 2.100 1.276 0.15 0.192
W5 1.700 x 0.500 x 2.400 2.040 0.85 1.734
Pv 0.0384 x 2.525 x 2.525 x 2.100 0.514 --- 6.38
Ph 0.1338 x 2.525 x 2.525 2.100 1.791 1.060 1.9
Sv 8.994
SM 8.280
Quantity
S.no. Material No's Unit Quantity Weight
in kgs
1 a) Skin plate 1 Sqm 1.620 62.83 kg/sqm 101.78
M.S. Plate -8mm x 1800mmx 900mm
b. M.S. Angle ISA 50x50x6mm size for
Shutter frame Length- 1.800m 4 m 7.200 4.50 kg/m 32.40
Stiffeners length -0.900m 2 m 1.800 4.50 kg/m 8.10
c. Lifting plates
10mm x 150mm x 300mm 2 sqm 0.090 78.54 kg/sqm 7.07
2 a) Screw rod
50mm dia. X 2.50m 1 m 2.500 15.40 kg/m 38.50
b) Connecting plate
50mm x 80mm x 200mm 1 sqm 0.016 302.70 kg/m 4.84
c) pins 1"dia. X 4" 2 Nos 2.000 0.50 kg/no 1.00
3 a) Hoist beam
Channel ISMC 200x75mm for
platform length -1.20m 2 m 2.400 22.30 Kg/m 53.52
b) Fixing plate
20mm x 200mm x 400mm 2 sqm 0.160 157.08 kg/sqm 25.13
c)Foundation bolts
25mm dia. X 450mm 2 m 1.800 3.85 Kg/m 6.93
4 a) Groove channel
ISMC 100mm x 50mm x 2.5mm 1 m 7.200 9.56 Kg/m 68.83
b) Anchorages
16 dia. X 300mm 6 m 1.800 1.53 Kg/m 2.75
Sub Total 350.87
Wastage 5% 17.54
Total 368.41
wt.of Gear box 35
Total 403.41
Say Kgs 403.00
Area of Painting
1 Shutter -2 sides = 3.240 Sqm
Measurements
S.No. DESCRIPITION Units No's Quantity
length breadth depth
1 2 3 4 5 6 7 8
Excavation in all kinds of soil including boulders upto 0.3
m diameter for canal, seating of embankment, filter drains
/ catch water drains etc., including dressing bed and sides
to required level and profile, cost of all materials,
1
machinery, labour, placing the excavated soil neatly in
dump area or for the formation of service road /
embankment as directed etc., complete with initial lead
upto 1 km and all lifts.( IRR-CCDW-1-2 )
U/S Wing walls Cum 2 2.130 1.30 2.038 11.290
Pail Wall Cum 2 1.200 1.90 2.338 10.660
Abutments Cum 2 6.050 1.90 1.968 45.240
U/s Apron Cum 1 3.330 2.21 2.038 15.000
(2.82+1.6)/2
Between abutments Cum 1 6.050 1.60 2.038 19.730
Cut off walls U/s Cum 1 3.420 0.49 0.75 1.260
D/S Wing walls Cum 2 3.770 1.70 2.038 26.120
D/S Return walls Cum 2 3.825 1.70 2.038 26.500
Profile walls Cum 1 6.440 0.30 0.300 0.580
D/s Apron Cum 1 3.500 2.55 2.038 18.190
(3.5+1.6)/2
Cut off wall D/s Cum 1 3.500 0.49 0.875 1.500
U/s for Bed Cum 1 5.000 14.500 0.100 7.250
U/s for sides Cum 2 5.000 3.377 0.100 3.380
D/s Lining for beds & sides Cum 1 5.000 6.913 0.100 3.460
Total Cum 190.160
Providing and laying insitu vibrated M-15 ( 28 days cube
compressive strength not less than 15 N / sq mm ) grade
cement concrete using 40 mm down size approved,
clean, hard, graded aggregates for foundation filling
2 and Cutoff walls including cost of all materials,
machinery, labour, formwork, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts. (
IRR-CCDW-2-3 )
U/S Wing walls Cum 2 2.130 1.30 0.50 2.770
Pail Wall Cum 2 1.200 1.90 0.50 2.280
Abutments Cum 2 6.050 1.90 0.50 11.500
U/s Apron Cum 1 3.330 2.21 0.50 3.680
Between abutments Cum 1 6.050 1.60 0.5 4.840
Cut off walls U/s Cum 1 3.420 0.49 0.75 1.260
D/S Wing walls Cum 2 3.770 1.70 0.5 6.410
D/S Return walls Cum 2 3.825 1.70 0.5 6.500
Profile walls Cum 1 6.440 0.30 0.30 0.580
D/s Apron Cum 1 3.500 2.55 0.50 4.460
Cut off wall D/s Cum 1 3.500 0.49 0.875 1.500
Total Cum 45.780
Providing and laying insitu vibrated M-15 ( 28 days cube
compressive strength not less than 15 N / sq mm ) grade
cement concrete using 40 mm down size approved,
clean, hard, graded aggregates for sub-structure / super-
3 structure works including cost of all materials,
machinery, labour, formwork, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating,
finishing, curing etc., complete with initial lead upto 50
m and all lifts. ( IRR-CCDW-2-21 ) For Abutment, Wing
& Return Walls
U/S Wing walls Cum 2 1.830 0.60 1.295 2.840
(0.7+0.5)/2
Abutments Cum 2 6.050 0.88 0.70 7.410
(1.3+0.45)/2
U.s Head wall Cum 1 2.500 0.55 1.00 1.380
(0.6+0.5)/2
Pail wall Cum 1 0.700 0.90 2.395 1.510
(1.3+0.5)/2
D/s head wall Cum 1 2.500 0.55 1.00 1.380
(0.6+0.5)/2
D/S Wing walls Cum 2 3.770 0.80 2.025 12.210
(1.1+0.5)/2
D/S Return walls Cum 2 3.525 0.80 2.025 11.420
(1.1+0.5)/2
Total Cum 38.150
Providing and laying insitu vibrated M-20 ( 28 days cube
compressive strength not less than 20 N / sq mm ) grade
cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for Hoist Slab including
4 cost of all materials,machinery, labour, formwork,
scaffolding, cleaning, batching, mixing, placing in position,
levelling, vibrating, finishing, curing etc., complete with
initial lead upto 50 m and all lifts. ( IRR-CCDW-2-
24 )
Slab over Barrel Cum 1 6.050 2.05 0.25 3.100
Hoist Slab Cum 1 0.700 2.05 0.15 0.220
Total Cum 3.320
Providing and laying insitu M- 20 ( 28 days cube
compressive strength not less than 20 N / sqmm ) grade
cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for wearing coat
5 including cost of all materials, machinery, labour,
formwork, cleaning, batching, mixing, placing in position in
alternate panels, levelling, compacting, finishing, curing,
packing joints with asphalt mortar etc., complete with
initial lead upto 50 m and all lifts. ( IRR-
CCDW-2-26 )
Wearing coat over U/s Apron Cum 1 3.330 2.21 0.075 0.550
Wearing coat over D/s Apron Cum 1 3.500 2.55 0.075 0.670
Wearing coat over Crest Cum 1 6.050 1.60 0.075 0.730
Total Cum 1.950
Providing and laying insitu vibrated M-15 ( 28 days cube
compressive strength not less than 15 N /sq mm ) grade
cement concrete using 20 mm down size approved,
clean, hard, graded aggregates for bed and Side lining
for u/s and d/s of structures(100 mm thick) including
6 finishing the junction of bed and sides to required
curveture, cost of all materials, machinery, labour,
formwork including supports, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing, curing
etc., complete with initial lead upto 50 m and all lifts.