You are on page 1of 4
sare Bran Use Weslo, al clio pst Qatar General Electric & Water Corporation ELECTRICITY PROJECTS (TECHNICAL AFFAIRS) @tc/372E/2040 Qatar Power Transmission System Expansion PHASE-10 (Package C5) DOCUMENT TRANSMITTAL ADVICE [Ref.No.: PH10-372E-KM.DTA-11. 555 Total Pages: 173 Date: 2012 72a) aT a He Tipo oan sO Mis Elsewedy Cables: |B Approved Except as Noted is Enmuty Cablot i fo ney a foe Ete hogs Resto Fax # 974 44653802 Sane Poe From: Ft emain Engr. Mohammed M.Al-Dosari Gist reeee Head of Electricity Projects fa sca ge ils ned Doane om kOe KAHRAMAA lets “ro ed Fr Contin [S] over [Pre velk bate pocument raving ibe ee «| eseneey | rm0-1822-075 lioaeaeanoon | 0. fMellbetasot Waring Tape forhv cable for) g Cables |11-0046 05.12.2011 [220kV Cable System Elsewedy | PH10-£15-26-DTS- ean [Typical Detatls of Cable Route Marker for 220K 2) cables | 11-0046 05.12.2011 M10-26-28-00-0002 © | cable system 5 Elsewedy | PHIO-ELS-26-DTS: [Typical arrangement dramving of crossing with 3] “cables |11-0045 05.12.2011 PH1O-26-28-70-7001 © Jexisting utiities for 20KV Cable System 7 4) er jimoesraapoeeeme | © ermmenesecra | © oe os i Ise wanna aaron tend ot ectcty Projects Lage eis (074) 484 6196; ~ Faxi(074) 404 6101 F OBOX 41, DOHA - QATAR. -wae sama ae bh 604 Hozee — siovoo-azue “woryeyno}2> 999 panoidde ay} oy eouavayou ym pareoxpur 2q NeYS BLA JO AMA YL) ‘doy 20;>800 UDUIIOD WH ons 9 |G | ° (OIESIOINa ® sngeas vondyoseq| uolsinay “oN Bumeg / quauinsog fin 1402°21'S0 9¥00-L1-S10-32-S13-01Hd (g a8ey2e4) OL-aSVHd UoIsUedxg Wayshs UOISsHUISUeI | J2MOg JED orozsvzze/219 ELSEWEDY GABLES — Integrated Energy Solutions QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 - EHV CABLES GTC/372E/2010 PACKAGE-C5. Kahramaa comments: Ref No:- PH10-372E-KM-DTA-12-0223 dated 16/jJuly/2012 Item | Drawing/Document No | Rev. Description Status No 01. | PH10-2E-28-70-7002 0 Typical Cable Trench Cross Section Drawing for B 220kV/315MVA Cable Single Circuit ‘S.No. ‘Comments Roply TR value of FTB shall be indicated with reference to the approved CCC calculation >> Noted and revised, 1415 Z x 300 | 300 _| 250. 1100 250] GROUND LEVEL SIEVED SOIL BACK FILL (TR 2.0K md) —— PE WARNING TAPE (W=150mm,7Nos,) '50 mm LAYER OF DUNE SAND ABOVE THE TILE CONCRETE CABLE COVER TILE 8 16x 220K 12008q.nm CABLE | —@ comm HOPE PIPE FOR FUTURE OTS CABLE ‘CABLE BACKFILLING MATERIAL ‘CEMENT BOUND SAND (CBS) (TR 1.2K.m) ‘© 40mm HOPE PIPE FOR F.O. CABLE FLUIDIZED THERWAL BACK FILL (FT8) BEDDING ‘ ida Resa ary TYPICAL 220kV_SINGLE CIRCUIT TRENCH CABLE NOTE! 4) AllDInensionsarein “mn. (CABLE SUMMERY: CROSS HONDING— FLAT FORMATION [TYPE OF BONDING REFERENCE DRAWING / DOCUMENTS DRAWING / DOCUMENT TITLE DOCUMENT No. {2 220KY HYDRAULICALLY PRESSEDCASLE TiS | PHIO-2E-52-70-5001, ce eatcuLaTIN — PHASE 10- EHV CABLES (GTCIS72E/2010 guseweDy TABLES AL THUMAMAH S/S - NAEBJA SUPER S/S TYPICAL CABLE TRENCH CROSS SECTION DRAWING FOR 220k, 31S MVA CABLE SINOLE CIRCUIT ee Cr ae >e PHIO-26-52.70.7002 yer arr

You might also like