“SNC “SAC
NOTICE TO ALL FORMAN FOR MAJESTINE SITE P85 REGARDING THE RESPONSIBILITY TO WORKERS
his notice isin line with the Forman’s common knowledge and responsibility towards their subordinates in securing proper
safety at work apart from the Safety Officers task of ensuring safety culture and in cooperation of Site safety to avoid
Unnecessary accidents and incidents detrimental to Project Majestine sie.
‘BASIC REQUIREMENTS FOR SAFETY ON SITE FOR FORMAN AND CHARGE-HANDS
SCAFFOLDING
~All Erected scaffolding should be complete before undertaking tasks for workers working at height.
~ There will be no active work on any scaffolding unless it is complete and suitably corrected. Complete scaffolding
‘means there is present ladder access, scaffolding tags are present (green for okay installed by Scaffolding
Supervisor, (Red means not allowed) to enter the scaffolding
~ Complete the Planks (Working platform) without open areas where workers wil all before workin.
= Complete the guard rll, midral and toe-board before workin.
~ Advice the Workers to be wearing safety harness on any work above 1.5 meters above scaffolding,
Tor RAIL
FULL CLOSED
Bocaive
‘OPEN EDGES ON SLAB
"No work i allowed near open edge as close to 2 meters. Work can resume only when the area is barricaded or
when worker is using lifeline that is attached to rigid structure.
= Allow Safety Department to install ifeline and barricade before proceeding the workers to work,
Page tofSLAB CONSTRUCTION AND FORMWORK
~ There should be 60cm allowance to allow workers and guardrails to be place on the edges ofthe slab during
construction.
~ Disallow workers to work on dangerous open edges for their safety and advice safety as soon as possible to
correct before proceeding to work.
HOUSEKEEPING
= Help and Facilitate to clear area of workarea before undertaking any work to avoid trip and fall hazards
= Promote segregation of materials to avoid obstruction and blockage of pathways.
PPE
All Workers involved in wood cutting such as jigsaw or bench saw should wear correct PPE such as Gloves, Safety
Googles and Dust Mask.
= Gloves and Safety Googles should also be used for casting concrete and stel ing.
Responsibility of Forman/Charge-hand to look after workers to ensure safety harness is worn any work above 1.5
meters.
Upon signing thereby conform to the above mentioned requirements and accept the responsibilities mentioned above and
|mparted to my subordinates and in compliance with ste safety instructions. myself will also be practicing correct safety
precautions as mentioned above.
GENERAL FORMAN NAME
1. KRISHNA W210
FORMAN
4. SAYEED HASSAN #361
chaRGe HAND
PAJENDRAN #301,
SANTAZ MOHAMMED #1086
KARUPPASANY #4252
VEL SANY PANNER #211,
BHRIVUNATH #387
‘ABDUL QADIR #4037
FARHAN SABIR #3992
HSE ADVISOR (NEIL VILLAMOR)
CONSTRUCTION MANAGER (ENGR SHERIF SALEM)
DATE: AUGUST 25 2016
Page 2of2