Tesda Backup Computation
Tesda Backup Computation
C1F1
FOOTING 1
COLUMN DIMENSIONS:
Width 1 0.30 M
Width 2 0.30 M
FORMULA: VOLUME = H * W1 * W2
CLASS A CONCRETE MIX
Enter Height L (M) 8.65
VOLUME OF CONCRETE FOR
EACH COLUME: 0.78 CU.M.
Number of Columns Units 41.00 Units
TOTAL VOLUME OF
CONCRETE: 31.92 CU.M.
# OF CEMENT BAGS 288.00 BAGS
VOL. OF SAND CU.M. 16.00 CU.M.
VOL. OF 3/4"
CU.M.
GRAVEL 32.00 CU.M.
FOOTING 2
FORMULA: VOLUME = L * W * T
CLASS A CONCRETE MIX
Enter Length L (M) 1.20 M
Enter Width W (M) 1.20 M
Enter Thickness T (M) 0.30 M
TOTAL VOLUME OF CONCRETE: 0.43 CU.M.
Number of Footing Units 4.00 Units
TOTAL VOLUME OF CONCRETE: 1.73 CU.M.
# OF CEMENT BAGS 16.00 BAGS
VOL. OF SAND CU.M. 0.90 CU.M.
VOL. OF 3/4" GRAVEL CU.M. 1.80 CU.M.
COLUMN DIMENSIONS:
Diameter 0.25 M
AreaCirc 0.05 SQ.M.
FORMULA: VOLUME = H * AreaCirc
CLASS A CONCRETE MIX
Enter Height L (M) 8.00 M
VOLUME OF CONCRETE
EACH COLUMN: 0.39 CU.M.
Number of
Units
Columns 4.00 Units
TOTAL VOLUME OF
CONCRETE: 1.57 CU.M.
# OF CEMENT BAGS 15.00 BAGS
VOL. OF SAND CU.M. 0.80 CU.M.
VOL. OF 3/4"
CU.M.
GRAVEL 1.60 CU.M.