Condensate System Sample Paper
Condensate System Sample Paper
HPSL/TEL/ O&M/z01
Type: O&M Document
Level:
Section: Operations
Thar Energy Limited
Reference 1x330MW Coal Fired Power Plant
1)
Documents:
Questionnaire
Condensate System
Attempted By
EMP No
Designation
Checked By
Designation
Marks Obtained
ALL RIGHT PERTAINING TO THE REPRODUCTION, TRANSFORMATION AND USE OF THIS DOCUMENT. IN ANY FORM OR MANNER
REMAIN THE EXCLUSIVE PROPERTY OF HPSL
Doc. Ref. No.
Generator and its auxiliaries 10HL/
Condensate System
From Questions 1 to 30 Short Answers
All question carry 3 marks each
1. What is the function of condenser and what type of condenser is installed at TEL?
4. What steps you would take if you receive “Condenser Hot-well Level Low” alarm?
5. What steps you would take if you receive “Deaerator Level Low” alarm?
9. Where the condensate would be discharged in case of emergency drain valve operation at
1. The primary task of condenser in thermal power plant operating on Rankine cycle is heat
rejection?
1. ☒ True ☐ False
1. ☐ True ☒ False
3. There is one set of Emergency Condensate water make-up pump with flow rate of 100t/h?
1. ☒ True ☐ False
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express
authority is strictly forbidden.
Paper Number Rev 00 Page | 2
Doc. Ref. No.
Generator and its auxiliaries 10HL/
1. ☐ True ☒ False
5. If the DP of polishing exceed 0.35 bar then polishing unit will by pass automatically?
☒ True ☒ False
☒ True ☐ False
☒ True ☐ False
8. Deaerator uses Low pressure steam supplied via Auxiliary boiler when plant is in startup mode
☒ True ☒ False
9. There is no bypass provision available for condenser hot-well level control valve?
☐ True ☒ False
10. In case of condenser level very high and ST is synched then you can decrease the level by
☐ True ☒ False
3. The flow maximum rated flow capacity of condensate polishing unit at TRL is ______________
4. Makeup water to the condensate water system will be provided by ____________ installed in
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express
authority is strictly forbidden.
Paper Number Rev 00 Page | 3
Doc. Ref. No.
Generator and its auxiliaries 10HL/
6. Intake of emergency condensate water make-up pump will come from the ________ and the
8. For design coal at BMCR condition the required condensate cooling water for each ash cooler
is _______________.
9. The DEA retention time is __________ minutes for boiler in case of feed water system failure
1. Condensate System is used to deliver water from Condenser Hot well to _____________ .
☐ HP drum
☐ Boiler
☐ DEA
☒ Demi water tanks
3. The Condensate water also serves the purpose of Low Pressure sprays at ___________.
☐ 839 t/h
☒ 970 t/h
☐ 770 t/h
☐ 990 t/h
5. Which of the following are the users of emergency condensate water pump.
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express
authority is strictly forbidden.
Paper Number Rev 00 Page | 4
Doc. Ref. No.
Generator and its auxiliaries 10HL/
6. The inlet and outlet temperature of condensate water for preheating via LP heaters are
☐ 40 C
☐ 83 C
☒ 50 C
☐ None of above
8. The maximum condensate cooling water required for one ash cooler for the worst coal
conditions is __________.
☒ 40 t/h
☐ 54 t/h
☐ 50 t/h
☐ None of above
9. Deaerator uses Low pressure steam supplied via __________ when plant is in operation.
☐ Extraction 7
☐ Extraction 6
☒ Extraction 5
☐ Extraction 4
☐ 2 MW
☒ 1 MW
☐ 0.5 MW
☐ 4 MW
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express
authority is strictly forbidden.
Paper Number Rev 00 Page | 5
Doc. Ref. No.
Generator and its auxiliaries 10HL/
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express
authority is strictly forbidden.
Paper Number Rev 00 Page | 6
Doc. Ref. No.
Generator and its auxiliaries 10HL/
6. Keeping in mind the P&ID draw the simplified flow path of LP heaters cascading
system?
Ensure ________water pump is in service and _______ water makeup header is charged
Open __________ inlet valve for condensate pump
Open suction strainer _____________
Open condensate pump _________ to condenser valve
_______________ Condensate Extraction pump A Suction Isolating valve
Close condensate Pump suction strainer ____________
(Before closing make sure all air should escape from the vent)
______________ condensate pump suction isolating valve
______________ valve of condensate pump if pump is to be put on standby
Ensure __________________ of condensate pump-A is normal
Check electrical supply from board XXXX
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express
authority is strictly forbidden.
Paper Number Rev 00 Page | 7