1. Which of the following order stage is compatible with requirement change process?

A
Problem analysis and change specification ->
Change analysis and costing ->
Change implementation.
2. Which of the following stage is done to:
- Detect and resolve conflicts between requirements ? Elicit & Analyze Requirements
3. Which of the following role uses requirement documents to:
- plan a bid for the system and to plan the system development process ? Manager
4. Which of the following stage is done to:
- Elaborate system requirements to derive software requirements ?  Elicit & Analyze
Requirements
5. Which of the following stage is done to:
- Develop use cases, system requirement ? Elicit & Analyze Requirements
6. To validate requirement, what type of the following checking action that
answers the question "Is there any requirement CONFLICT?"  Consistency check
7. A Non-Functional Software testing done to check if the user interface is easy to use and
understand? Usability Testing
8. What type of documents address what users need to do their jobs? URD - User Requirement
Definition
9. Requirements elicitation means? All of the above
10. It includes a set of ________ that describe all the interactions the users will have with the
software.?  Use case
11. Requirements review process is carried out to? Improve the quality of SRS
12. To validate requirement, what type of checking answers the question of
- Can requirement be TESTED? Verifiability check
13. In collaborative requirements gathering the facilitator?  controls the meeting
14. Product features are related to:  Functional requirements
15. To check whether we are developing the right product according to the customer
requirements are not. It is a static process ? Verification
16. To validate requirement, what type of checking answers the question of
-Are all functions required by customer INCLUDED? Completeness check
17. What type of characteristics of good SRS describes that it is good reference for future
dev/enhance documents ? Traceable
18. Which of the following should be considered as candidate objects in a problem space? all of
the above
19. To validate requirement, what type of techniques describes that it develops tests for
requirements to check testability? Test-case generation <<<<<<
20. Which is not a characteristic of a good SRS?  Brief
21. Six important characteristics of good SRS are? Correct, Unambiguous, Complete,
Consistent, Verifiable, Traceable.
22. Verification is to check?  whether we are building the product right
23. Software requirement should not be? Ambiguous
24. Prototyping allows the users to clarify their information requirements as they use the
prototype.? Yes
25. Validation is to check? whether we are building the right product <<<<<
26. Which of the following are valid reasons for collecting customer feedback concerning
delivered software? All of the above
27. What type of documents used to track the status, relationship and change of requirements
during the whole project? Requirement Management Sheet
28. - Can requirement be IMPLEMENTED with given available budget and technology? Realism
check
29. What type of characteristics of good SRS describes that it should has only one interpretation
(to both creator & user)? Unambiguous