You are on page 1of 1

DRG.

NO: AWD 36

DETAIL-1

1115
50 1055
150
100
30 150

5
400 500
20MM THK DARK GRAY
370
350 5 STONE FRAME
10.75°
10.75° 10MM GROOVE
30 20
20

DETAIL-3

MAKE THIS SURFACE


SECTION ELEVATION
GROOVY THAT STONE
CAN NOT MOVE
90

120
340
390
80 DETAIL - 3 SECTION A-A'
50
DETAIL-2 NOTE : ALL THE INSIDE STONE SURFACE WILL HAVE THIS TYPE OF 5x5MM ROUND EDGE
1015
1115
PLAN
WINDOW W4A WINDOW TYPE - TOP HUNG

ALUMINUM WINDOW INSIDE 10MM GROOVE


20MM HEAVY TEXTURED
230MM A.A.C. BLOCK AS PER SELECTION ANCHOR FASTNER
PLASTER AS PER SELECTION 20
230MM A.A.C. BLOCK
10MM GROOVE 10MM GROOVE
115
CASTE IN SITU 10
CONCRETE LINTEL 50
OUTSIDE INSIDE STONE FOLDING
150
100 FROM HERE 10 DEGREE 200
ANCHOR FASTNER
20MM THK DARK GRAY 10MM GROOVE
10 BETWEEN CONCRETE
20 20 STONE FRAME
10MM GROOVE LINTEL AND STONE 30
50 30 195 20
BETWEEN CONCRETE FRAME EXTENTION 50MM 20MM HEAVY TEXTURED
ALUMINUM WINDOW 100
LINTEL AND STONE LINTEL EXTENTION 100MM PLASTER AS PER SELECTION
AS PER SELECTION OUTSIDE
10MM GROOVE

DETAIL - 1 SECTION A-A' DETAIL - 2 PLAN

REVISIONS
1. ALL DIMENSIONS ARE IN M.M. & ARE TO BE READ NOT MEASURED. SN DATE REVISION
ABBREVIATIONS

PROJECT : MR. KOTHARI'S RESIDENCE PROJ.NO: #2008


SITE COORDINATOR

2. VENDOR SPECIFIC DWGS TO BE PROVIDED BY VENDOR, APPROVED BY ARCHITECT 1.


WINDOW DETAIL-W4A DRG.NO:36
APPROVALS

3. DISCREPANCY FOUND IN DRG SHOULD BE BROUGHT TO ARCHITECT'S NOTICE IMMEDIATELY


BEFORE COMMENCEMENT OF WORK.
AWD --
CONSULTANT

4. ALL LEVELS ARE TO THE FINISHED FLOOR LEVELS. GROUND FLOOR PLAN NORTH
ARCHITECT

5. ALL MATERIALS SHOULD BE ISI & FIA APPROVED MAKE. E-Mail: studiobaham206@gmail.com
NOTES

ARCHITECTS: CHECKED: HARSH


6. SAMPLES FOR ALL ITEMS TO BE APPROVED BY ARCHITECT BEFORE EXECUTION. PH/FAX:+91-9725035661
7. WALL : USE MEDIUM GAUGE PVC PIPE. DEALT: SMIT
8. FLOORING : USE HEAVY GAUGE PVC PIPE.
9. CHK : CHECK THIS POINT BEFORE LADING.
studio bāham DATE: 16 01 20 SCALE: NTS
NOTE: THIS DRAWING IS THE PROPERTY OF M/S. STUDIO BĀHAM & SHOULD NOT BE COPIED, REPRODUCED OR USED FOR ANY OTHER PURPOSE THAN SPECIFIED WITHOUT THE PRIOR PERMISSION OF THE ARCHITECTS IN WRITING.