We are pleased to transmit the report on the sectoral audit of the textbook
program for elementary students. The audit was conducted in compliance with
COA Assignment Order No. 2002-023 dated July 18, 2002 by a team from this
Office from July 18 to October 30, 2002. The results of the audit were discussed
with the City Mayor and a representative from the Division of City Schools,
Quezon City in an exit conference conducted on November 5, 2002. Their
comments were incorporated in the report where appropriate.
Background 2
Audit Objective 4
Audit Scope and Methodology 4
Audit Conclusion 5
Management’s Reaction to Audit Observations 7
Determination of Textbook
Requirements 10
Introduction 11
Guidelines/Policies 11
Management’s Comments and Team’s
Rejoinder 15
Recommendations 16
Introduction 17
Guidelines/Policies 17
Management’s Comments and
Team’s
Rejoinder 20
Recommendations 21
Introduction 23
Risk Management Processes 24
Management’s Comments and
Teams Rejoinder 27
Recommendations 27
Contents Page
Chapter 3 Appropriate Manpower Resourcing 29
Introduction 30
Inadequate Work Plan 31
Evaluation of Performance 32
Training 32
Management’s Comments and
Team’s
Rejoinder 34
Recommendations 34
Introduction 37
Performance Reporting 37
Effectiveness Measures 38
Procurement Plan 44
Management’s Comments and Team’s
Rejoinder 44
Recommendations 46
Introduction 48
Coordination within DepEd Offices and
between the DepEd and the Local
Government Units 48
Management’s Comments and Team’s
Rejoinder 51
Recommendations 52
Part I
Executive Summary
1
EXECUTIVE SUMMARY
BACKGROUND
The provision of free elementary education is one of the priority programs of the
government identified in the Medium Term Philippine Development Plan for
2001-2004. The provision of school education by the government carries with it
the responsibility to provide facilities by which education will be delivered.
The appropriation for school education in calendar years 2001-2002 for the
implementation of the Department of Education (DepEd) is P169.385 billion, the
highest among all agencies, representing 12.73% of the total government budget.
Of the total budget, P1.609 Billion was allocated for the procurement of
textbooks.
For school year 2001-2002, there were 11,927,480 elementary students enrolled
throughout the country distributed in 16 regions. Of the total students, 237,552
were enrolled in 94 schools within the Division of Quezon City.
SEMP I aims to produce 25,000,000 textbooks for elementary and high school
students by the end of 2002 in order to achieve a 1:2 textbook-pupil ratio. The
projected quantity of 25,000,000 to be procured out of the loan was computed by
the DepEd based on an estimated cost of P70 to P80 per book. The books were
2
EXECUTIVE SUMMARY
As the financing agency for SEMP I, the World Bank assesses the
implementation and progress of the project on an on-going basis. In one of their
Assessment Reports it was noted that, there has been a number of long standing
problems in the distribution and utilization of textbooks under the program
including the procurement and receipt, financial reporting, communication links
between the Central and Regional Offices and links between planning and
financial management functions. The absence of a reliable, integrated and timely
information system was also reported to be a major weakness.
Using SEF, the City Government of Quezon procure textbooks for the use of
schools under its jurisdiction.
The funding of textbooks for the educational needs of the DepEd National
Capital Region (NCR) is therefore being funded through three sources, SEMP I,
the Divisional MOOE and the SEF. This sectoral audit focused on evaluating
whether thru the implementation of these programs, the government’s objective
of attaining 1:1 textbook pupil ratio for Grades I to IV had been attained.
3
EXECUTIVE SUMMARY
In the process, the team assessed operations of the different agencies involved in
meeting this objective by determining the textbook requirements and
monitoring the progress of the program.
AUDIT OBJECTIVE
The audit objective was to assess whether the implementation of SEMP I and
SEF have been effectively managed to contribute to the effective achievement of
the government’s objective of giving quality education through the provision of
textbooks considering the determination of textbook requirements and
distribution of available books.
The audit covered the implementation of the textbook component of SEMP I and
SEF programs of the government for elementary education from January 2001 to
September 2002 intended for SY 2001-2002 considering the determination of
textbook requirements and distribution of available books. The agencies
included in the audit were the DepEd Main Office, DepEd NCR and the
Division Offices and LGUs in the Cities of Quezon, Caloocan and
Mandaluyong.
As of audit date, the total textbook allocation for elementary students from
SEMP I for the Division of Quezon City was 690,414 books. Procurement of
textbooks by the Division Office from January 2001 to September 2002
amounted to P3,516,201.90 while procurement by the City Government out of
SEF for the same period amounted to P17,811,957.30. The City Government also
purchased textbooks from the General Fund amounting to P3,841,764.80.
The performance of the Division Office was assessed using the following
criteria:
4
EXECUTIVE SUMMARY
During the audit, the team performed the following procedures, among others:
The audit was conducted from July 18 to October 31, 2002 pursuant to COA
Assignment Order No.2002-023 dated July 18, 2002. The results of the audit
were discussed with the City Mayor, other City Government officials and a
representative from the Division Office of Quezon City on November 5, 2002.
AUDIT CONCLUSION
The DepEd, thru the Division Office and the City Government of Quezon have
not effectively managed the implementation of SEMP I and SEF through the
determination of textbook requirements and the distribution of available books
contributing in a failure to attain the government’s objective of achieving a 1:1
textbook pupil ratio in 5 priority subjects for Grades I to IV.
At the time of audit, only 6 subjects for Grades I to IV within the Division of
Quezon City have sufficient textbooks. The available books in these subjects
even exceeded the textbook requirements by 25,785 as the Division Office was
not able to determine the actual needs per subject and grade. The excess books
will still increase to 163,185 upon receipt of the forthcoming deliveries from
5
EXECUTIVE SUMMARY
IMCS of additional allocation for the Division Office. On the other hand books
in other subjects are short by 179,643. The insufficiency of books reduces the
effectiveness of the education services provided to students thru the provision of
sufficient books in all subjects, grades, sections and schools and wasted limited
and valuable government resources.
The excess books were among those procured by the Instructional Material
Council Secretariat (IMCS) under SEMP I, by the Division Office out of MOOE
and by the City Government of Quezon out of SEF.
At the time of audit, while there were excess books in some subjects, some
schools did not have sufficient books for these subjects due to inequitable
distribution of textbooks among schools. The purpose of providing textbooks
then which is to enhance and strengthen the student’s capacity to learn was
defeated and rendered such books worthless.
The audit covered the implementation of the textbook component under SEMP I
and procurement under SEF from January 2001 to September 2002. The textbook
program is again included in SEMP II to be implemented from September 2002
to December 2005 to complete the on-going reforms started in SEMP I. The
Division Office and City Government are also continuously addressing the
textbook needs of students. Therefore, for a more effective implementation of
SEMP II and SEF and to avoid the recurrence of the problems discussed above,
the Division Office and the City Government should seriously consider
addressing these concerns.
6
EXECUTIVE SUMMARY
The results of the audit were discussed with the City Mayor, other City
Government officials and a representative from the Division Office in an exit
conference conducted on November 5, 2002. Overall, the Division Office and
the City Government acknowledge the team’s observations. The Division
Superintendent assured the team that all recommendations shall be considered
and that implementation shall follow. On the other hand, the City Government
did not provide any written comments.
7
Part II
Audit Observations
and
Recommendations
8
Chapter 1
9
POLICIES and GUIDELINES
INTRODUCTION
Effective policies and guidelines established by an agency for running the day to
day business contribute to the achievement of the program’s outcome. It also
helps the agency mitigate the effect of risks, detect and prevent untoward
incidents and safeguard the attainment of the program’s objective. This should
also be clearly documented in procedures manuals and made available to staff
responsible for their implementation.
The audit noted that, the Division Office and the City Government have not
issued guidelines to ensure that the data on the number of textbooks available
and still needed by the students was accurate. As a result, the reported needs
were not reflective of the actual textbook requirements. Consequently, both
offices were not able to address the priority needs and they tend to procure
textbooks for subjects already being addressed by the IMCS resulting in excess
books in some subjects while books in other subjects remained insufficient to
address the student needs. The insufficiency of books in other subjects affects
the learning capacities of students and eventually limit work opportunities.
In relation to this program, the DepEd issued the following orders to submit the
total textbook requirements:
10
POLICIES and GUIDELINES
OBSERVATION
The Division Office and the City Government of Quezon do not have
established guidelines to determine the actual textbook requirements.
They merely rely on the guidelines issued by the DepEd which were
found insufficient to produce accurate data in a timely manner. As a
result, the needs were not properly addressed as the reported needs were
not reflective of the actual textbook requirements. As of audit date,
books in some subjects exceed the requirements while books in other
subjects are still inadequate. This contributed to the failure of the
government to achieve the objective of attaining 1:1 textbook pupil ratio
for Grades I to IV in 5 priority subjects.
a. The guidelines were issued only for a particular period and not intended to
be regularly observed. It was not intended to make the determination of
needs a continuing activity for the Division Office, and yet procurement of
books is being undertaken by different offices on an on-going basis.
11
POLICIES and GUIDELINES
funds; by the Division Office out of MOOE; and the Quezon City
Government out of SEF. The strategy to avoid duplication of needs being
addressed by these offices were not established.
Deadline for
Guideline Submission Factors to be Considered
Memorandum dated 05-30-01 1. Total textbook available and needed for five
05-16-01 priority subjects.
e. In using these guidelines, the Division Office could not establish the actual
textbook needs of schools and students. The guidelines do not address the
following:
On the basis of these issuances, the Division Office submitted the reports
required. However, the audit noted that due to inadequacies in the guidelines,
confusion over reporting needs and the time frame to collect the data, reporting
was not undertaken effectively and was then of little value in the procurement
decision making process. The reports which refer to the needs for the same
school year 2001-2002 reflects different figures without any explanations
casting doubts on the accuracy of the reports.
To ascertain the accuracy of the reports, the team then analyzed the submitted
needs for Grade 4. The needs submitted on May 2000 increased by 14,700 in
February 2001 when there were deliveries between the period May 2000 to
February 2001 of 30,000 copies. The needs therefore was expected to decrease
by the same quantity. On the other hand, the needs submitted on February 2001
decreased by 89,123 in May 2001 when only 13,700 copies were delivered
from February 2001 to May 2001. This demonstrates that the methods for
13
POLICIES and GUIDELINES
Consequently, as of audit date, as the needs reported were not reflective of the
actual textbook requirements, the actual needs of students were not addressed.
Hence, books available in selected subjects already exceeded the actual
requirements while books in other subjects remained inadequate. This
contributed to the failure of the government to achieve the objective of attaining
1:1 textbook pupil ratio for Grades I to IV in 5 priority subjects.
On the other hand, at the time of audit, the Quezon City Government relies
heavily on the needs/requests submitted by the Division Office without
validating these needs as to accuracy. The audit however, noted that the
submitted needs to the City Government are often the same needs being
addressed by the DepEd from the national level to the division level. This is
manifested in the 2001 Annual Procurement Plans of the Division Office and
the City Government chargeable against the SEF which contains exactly the
same books at the same quantity.
This has created two major risks for the City Government in ensuring efficient
and effective expenditure of SEF. One is that, the requests submitted by the
Division Office may not reflect the actual needs while the doubling up of
submission of requests to the DepEd and the City Government guarantees the
purchase of excess books as what is actually happening. The other is the failure
to ensure that the role of the City Government in providing additional funds to
meet the shortfall identified by the DepEd is met.
14
POLICIES and GUIDELINES
The Division of City Schools of Quezon The Division Office should consider
City submits various reports on the informing the NCR or the IMCS of all
needed textbooks to the DEP-ED NCR procurement undertaken by the Division
but deliveries of SEMP textbooks were Office after the needs have been
made two years later, thus, the reported submitted and providing an updated list
requirements were no longer in of needs for their guidance and
conformity with the present needs. information.
15
POLICIES and GUIDELINES
RECOMMENDATION
16
POLICIES and GUIDELINES
INTRODUCTION
Considering that the total textbook requirements could not all be addressed at
once, the distribution process that would ensure that books are actually delivered
at schools in time for the opening of classes is crucial. To address this problem,
the delivery function was passed on by the DepEd to the suppliers. As prescribed
in the guidelines and in the contracts, books will be delivered direct to the
District Offices by the suppliers. The suppliers however need to inform the
Regional/Division Offices of the delivery schedules 15 days before the delivery
dates. The District Offices in turn will deliver the books to schools under their
jurisdiction in time for the opening of classes.
The audit concluded that there were some lapses on the part of the suppliers
particularly in delivering the books on time and informing the District Offices of
the actual delivery schedules. There were also cases of undistributed books as
the District Offices were not properly equipped to perform the function of
receiving and distributing books. The distribution problems create a backlog on
the students’ study program of a particular subject matter and retard the progress
of their education development.
OBSERVATIONS
17
POLICIES and GUIDELINES
It was also observed that, the notices did not indicate the specific date and
time of delivery of the books to any particular District Office. It merely
notified the Division Office that a particular supplier would deliver the books
within a certain period. Considering that the Division has 19 District Offices,
the District Offices, even if notified, would not know the exact date and time
of the delivery.
The very purpose then of sending notice, which is to ensure that the District
Supervisor or his/her duly authorized representative is present at the time of
delivery, is defeated. It may be noted that, the designated Property
Custodians are in most cases, teachers with regular teaching loads. In view
of this deficiency, the supplier had either to wait for the availability of the
Property Custodian or had to return to have the deliveries accepted.
The team also noted that in the case of District VI, there were instances
where textbooks were delivered by the suppliers 8 to 36 days after the
scheduled delivery dates:
18
POLICIES and GUIDELINES
There were however no records to show that, the District Office had
informed the IMCS or the Regional Office of these problems. Meanwhile,
the students were deprived on the immediate use of these textbooks
affecting the quality of education services provided to students by the
government.
II Library
XVI Classroom
XVIII Computer Laboratory
19
POLICIES and GUIDELINES
In order to determine how the District Offices manage this situation, the team
inspected School District VI on September 16, 2002. Inspection revealed
that, in view of inadequate resources, there were cases of undistributed
books to schools. At the time of inspection, 1,740 textbooks received on May
27, 2002 intended for Pasong Tamo and Tandang Sora Elementary Schools
were still in the custody of the District Office. There were no documents
presented indicating that their respective school Property Custodians had
been informed to collect their textbook allocation. However, the District
Custodian claimed that they are waiting for the school Property Custodians
to collect these books.
The District Supervisors in School District Nos. II, VI, XVI and XVIII
claimed that the said constraints were reported to the Division Office. The
team could however not document the actions taken by the Division Office
as there were no records made available to the team.
20
POLICIES and GUIDELINES
RECOMMENDATIONS
21
Chapter 2
22
RISK MANAGEMENT PROCESS_
INTRODUCTION
Risk is defined as the chance of something happening that will have an impact
upon objectives. It is measured in terms of consequences or effects in the
attainment of the objectives and likelihood or certainty of its occurrence. Risks
should be identified at the earliest stage of the project. To be effective, the risk
management process needs to be rigorous and systematic. It demands that a plan
of action be developed, in relation to identified risks, that minimize the
likelihood and consequences of these occurring. As well, the plan needs to be
continuously monitored and reviewed because risks, not only change over time,
but their relative significance may also change, as may the mechanisms and
tools required to manage the risks efficiently and effectively.
The audit noted that, the Division Office and the City Government have not
adequately managed the risks in the implementation of SEMP I and SEF
resulting in a failure to achieve their objective.
23
RISK MANAGEMENT PROCESS
OBSERVATION
The Division Office and the City Government have not adequately
managed the risks in the implementation of SEMP I and SEF. As a
result, the textbook requirements were not met, the available textbooks
were not equitably distributed and books were not efficiently utilized.
Occasionally, actions were taken as the problems are encountered. The
major risks however, such as ensuring that the data on textbook
requirements are accurate and sound monitoring of the achievement of
the project objective are not managed. The failure to manage these risks
contributed in ineffective delivery of education services.
In order to ensure the smooth implementation of SEMP I and SEF, the Division
Office and the City Government should be able to identify and adequately
managed the risks in the implementation of the programs. The risks should be
identified at the start of the project and the intended treatment should be
established in order to avoid the occurrence of the risks and/or minimize its
effect on the program.
Evaluation of the documents gathered during the audit and interviews with the
officials and employees involved in the project however revealed that, the
Division Office and the City Government do not have structured processes to
manage the risks.
Upon the request of the team, the Division Office prepared a list of risks
encountered and the measures taken or to be taken as follows:
RISKS MEASURES
24
RISK MANAGEMENT PROCESS
The identified risks are mostly related to delivery problems and relevance of
the delivered books to the new curriculum. It is interesting to note that, even
with this awareness and the proposed treatment, the problems remained
unmanaged.
In view of the absence of the structured processes, they were not able to
detect a number of problems in the implementation of the program such as:
25
RISK MANAGEMENT PROCESS
This resulted in the oversupply of books in some subjects and some schools
while other books in other subjects remain insufficient. The inequitable
distribution of books was also not corrected. This condition affects the
learning abilities and quality of education provided to students.
b. Issuing distribution procedures to ensure that the books are distributed only
to schools in need;
26
RISK MANAGEMENT PROCESS
The real cause of the problem is the The risk of late delivery of textbooks could
delayed delivery of textbooks under have been identified and properly
SEMP. If the textbook requirements under managed if the Division Office developed a
SEMP were delivered on time, then the sound risk management processes at the
textbook requirements shall have been onset of program implementation. The
met. management of risks is an effective tool to
ensure that potential problems are
addressed or treated to avoid its occurrence
or at least minimize its impact on the
program objective.
RECOMMENDATIONS
27
RISK MANAGEMENT PROCESS
28
Chapter 3
Appropriate
Manpower Resourcing
29
APPROPRIATE MANPOWER RESOURCING
INTRODUCTION
In the performance of their duties and functions, the personnel involved in the
implementation of the program should be guided by a well-designed work plan
of activities geared towards the attainment of the program’s objective. The
evaluation of accomplishment is also necessary to assess the performance of the
personnel and address their training needs and other problems that may affect
the attainment of the objective.
The audit disclosed that the Division Office does not have a well defined work
plan to guide them in the performance of their duties and was not monitoring the
performance of the personnel involved in the implementation of the program.
There was also no training program designed to improve their performance. As a
result, the Division Office was not able to detect the non-performance of key
controls to ensure the smooth implementation of the program.
The audit noted that the offices involved in the provision of textbooks are the
following:
Office Functions
30
APPROPRIATE MANPOWER RESOURCING
OBSERVATION
The Division Office does not have adequate work plan of activities to
guide them in the performance of their duties and was not evaluating
the performance of personnel assigned to the program. The inadequate
work plan may also lead to inadequate manpower resourcing. Further,
the performance of the personnel were not strengthened as there was no
training program designed to enhance their performance. As a result,
the non-performance of key controls to ensure the success of the
program was not detected demonstrating a breakdown in processes that
affect the ability of the program to achieve its objectives.
Records show that although the Planning Office has developed the Work
Plan for CY 2002, the activities included therein are limited to
school/academic activities and do not include administrative matters
particularly, the determination of textbook requirements, the monitoring of
the attainment of the DepEd objective on the provision of textbooks and the
validation of the reports submitted by the schools.
The work plan should also include the performance target, manpower
requirements and expected output of each unit to define accountabilities and
responsibilities. In this case, the inadequate work plan led to a breakdown in
controls and non-performance of essential administrative functions such as
31
APPROPRIATE MANPOWER RESOURCING
At the time of audit, the personnel of the Division Office were not required
to submit accomplishment reports regularly. They also failed to submit their
Performance Rating for the year 2001. Consequently, the performance of
personnel and their respective accomplishments were not assessed and their
failure to perform the monitoring function was not detected.
Analysis of available records show that the Division Office does not have
training program designed for its employees. Surveys conducted by the team
with the concerned personnel showed that they have attended the following
seminars/training during CYs 2001 and 2002.
Inclusive
Name Section Title of Seminar Dates
01/10-11/02
Planning * DECS-NFE staff
32
APPROPRIATE MANPOWER RESOURCING
* Adm. Of 2001 PEPT-
* DECS-NETRC Student 06/07/02
ARACELI LIWANAGAN Tracking System
(Sup. Educ. Prog. Spec.) * Teacher Deployment
and 03/22-23/01
Utilization of Public 07/31-08/02/01
School Teachers 11/13-15/01
In view of the absence of a well-defined work plan to guide the personnel in the
performance of their duties and the failure of the Division Office to monitor the
performance of personnel, the non- performance of the key controls necessary to
ensure the achievement of their objective was not detected and addressed. The
inadequate work plan may also lead to inadequate resourcing of the function.
33
APPROPRIATE MANPOWER RESOURCING
The Division Office had prepared a The team appreciates the initial steps
work plan of activities and is taken by management to implement the
undertaking performance evaluation. recommended measures to address the
In order to enhance the performance issue on the lack of a work plan,
of personnel and to keep them abreast performance evaluation, personnel
on this recent COA rulings, the training and in recognizing their
Division Office is sending them to the importance towards the attainment of
Seminar-Workshop on Property the objective.
Management and Accountability
being conducted by Dep-Ed NCR in The training should not only be
four batches in Jonel II Calamba limited to Division Office personnel but
Laguna. Five of the property should also include School Property
personnel already attended the Custodians. Training needs should be
Seminar on Property Custodian in assessed to determine the aspect of
1999 RELC. work that needs improvement. The
training should give emphasis on the
The actual textbook condition is being determination of textbook needs,
monitored by the Division Office to distribution and allocation of textbooks
meet the actual needs of the school. per subject and classroom and
The Division Office is using monitoring of textbook condition to
Textbooks Situation Analysis form. avoid overprocurement of books and
ensure that textbooks are utilized
efficiently. In that way, the textbook-
pupil ratio of 1:1 will be achieved.
RECOMMENDATIONS
34
APPROPRIATE MANPOWER RESOURCING
35
Chapter 4
Performance Monitoring
36
PERFORMANCE MONITORING
INTRODUCTION
The audit noted that the Division Office and the City Government were not
accurately monitoring the textbook condition such that they were not aware of
the needs to be addressed. As a result, they were procuring books no longer
necessary wasting limited and valuable government resources.
OBSERVATIONS
37
PERFORMANCE MONITORING
English
Language 9223 33870 30000 (5353) 58
Reading 8065 34145 30000 (3920) 48
Filipino
Wika 10387 41070 30000 683 6
Pagbasa 10494 44103 30000 (3609) 34
Math 8038 38439 - 30,401 378
Science 12362 37449 30000 (4913) 39
Sibika 3878 35795 30000 1917 49
38
PERFORMANCE MONITORING
In order to reflect the present textbook condition, the team considered the
actual enrollment for school year 2002-2003 as of July 2002 as supplied by
the Planning Section and compared the same with the existing inventory in
five priority subjects for Grades I to IV as reflected in the Textbook
Inventory Report.
Comparison of the two data revealed that, in six (6) subjects, available
books exceed the requirements by 1,212 to 5,571 representing 1:0.88 to
1:0.97 textbook pupil ratio, while others are still short by 91 to 37,824
equivalent to 1:1.002 to 1:27.19 textbook pupil ratio. The ratios derived by
the team follow:
Reported
Enrollment Existing Textbook
Grade Subject SY2002-03 Inventory Pupil Ratio Excess Short
39
PERFORMANCE MONITORING
TOTAL 163,815
The textbooks in Science for Grades I and 2 were not issued to students as
the Property Custodian claimed that, this subject was already integrated into
English under the New Curriculum. This demonstrates the inefficient
utilization of resources and defeats the purpose of providing books which is
to enhance the students learning abilities.
The failure of the Division Office to monitor in a timely manner the existing
textbook condition affected the attainment of the government’s objective of
improving the quality of education provided to students by giving sufficient
books in all subjects and grade levels. At the same time, the oversupply of
40
PERFORMANCE MONITORING
41
PERFORMANCE MONITORING
On the other hand, review of the distribution records of the School Custodians
also showed that there were undistributed books in their custody for subjects
that have not yet attained the 1:1 textbook pupil ratio.
School/
District Book Subject Qty Shortage
The inequitable distribution of books renders some books useless when these
books could have guided the students of other schools within the Division
in their learning exercises.
On July 1994, Republic Act No. 8047 was passed providing for the
development of the book publishing industry. The Act was promulgated to
provide for the continuing development of the book publishing industry with
the active participation of the private sector. It also provides that, the DepEd
shall, within a period of not more than three years from the effectivity of the
Act, phase out its textbook publication and distribution functions and support
the phasing in of private publishers to assume these functions. Under this
42
PERFORMANCE MONITORING
As of May 19, 2000, some 458 books have been approved by the DepEd as
prescribed textbooks for elementary schools consisting of 1 to 18 textbooks
per subject area and grade level. This policy created a situation where the
Division Offices have as many textbooks as possible per subject. This
prompted the DepEd to issue a Memorandum on May 16, 2001 directing all
regional/division/district school officials to ensure that the same textbook
titles are used within a given class for each subject when these textbooks are
available. There should be no instance where any class would use more than
1 textbook title in any particular subject. The same school may however,
allow 1 class to use title A while another will use title B in a specific subject
and grade level.
The absence of books in some subjects and the use of different books in one
subject within the same class would affect the ability of the students to learn.
The team also noted that while there was an instruction to use only one book
title, there were no guidelines and processes established to implement this
instructions. The Memorandum did not also require the Division/District
Offices to swap or return books of different titles to other schools or
43
PERFORMANCE MONITORING
Divisions who may have preference for such titles after they have selected a
particular title.
As of June 2002, the inventory report of the Division Office of Quezon City
showed that there were about six (6) subjects for Grades I to IV with
textbooks exceeding textbook requirements. Review of the 2002 Annual
Procurement Program for MOOE however, show that books for four of
these subjects were still programmed to be procured within the year from
the MOOE in amounts representing 40.87% to 50.93% of the total
enrollment for SY 2002-2003.
Reported To be
Enrollment Existing Procured %age
Grade Subject SY 2002-03 Inventory Excess MOOE Enrollment
The team also observed that some schools are no longer using their textbooks
in Science for Grades 1 and 2 as the School Property Custodian claim that
Science is integrated into English under the New Curriculum implemented
this SY 2002-2003. Yet, substantial quantity are still intended to be procured
for these subjects out of the Division’s MOOE. As of September 30, 2002,
however, there was no recorded procurement for these textbooks.
44
PERFORMANCE MONITORING
The Division Office will follow-up the There is nothing wrong with allocating
District Office or Property Custodian funds from MOOE and SEF for the
for immediate distribution of books. procurement of books. However, the
books to be purchased should pertain to
Regarding the policy of multiple subjects that have not yet attained the
adoption per subject the Division 1:1 textbook condition and that
Office will bring this matter to the procurement should be properly
attention of the Dep-Ed NCR. coordinated with each other.
RECOMMENDATIONS
46
Chapter 5
Effective Relationship/Coordination of
Government Offices
47
EFFECTIVE RELATIONSHIP/COORDINATION OF
GOVERNMENT OFFICES
INTRODUCTION
The audit noted that, the lack of coordination among the agencies involved in the
program and the lack of guidelines to dictate the communication working
protocol resulted in a situation whereby all agencies were addressing the same
textbook needs of schools. These led to a breakdown in the overall funding
objective of the government which had been designed to maximize school
textbook purchases through tripartite involvement and ensure accessible and
equitable education services to school children.
OBSERVATION
The textbook procurement plan of the Division Office and the City
Government, designed to augment the allocation from IMCS, are not
coordinated to IMCS. There were even no guidelines established to
provide a clear direction to all concerned parties on their roles and
responsibilities. As a result, the IMCS is allocating scarce resources to
48
EFFECTIVE RELATIONSHIP/COORDINATION OF GOVERNMENT OFFICES
the needs already being addressed by the Division Office and the City
Government contributing to the failure to achieve their objective.
To augment the allocation of books from the IMCS, the Division Office also
procure books from the MOOE and the City Government out of the SEF. For
this purpose, the Division Office prepares two Annual Procurement Plans
(APPs), one for each funds.
Both APPs clearly indicate the particular book for subject and grade level
intended to be procured. Results of interviews revealed that the determination of
the total quantity to be programmed were based on enrollment and available
books. This could however, not be documented as there were no records or
reports submitted to the team.
As programmed, the Division Office and the City Government implement their
respective plans and continue with the procurement and distribution of textbooks
to the different schools without informing the Regional Office or the IMCS. The
IMCS, on the other hand, proceeded with its own procurement and distribution
schedules.
The audit noted that in view of the lack of coordination among the three offices,
they were addressing the same needs simultaneously as illustrated below:
P R O C U R E M E N T
---------------------------------------------------------------------------------------------------------------------
IMCS CITY DIVISION OFFICE
Delivery Excess/
Grade Subject Qty. Date Qty. Date Qty. Date Total (Short)
49
EFFECTIVE RELATIONSHIP/COORDINATION OF GOVERNMENT OFFICES
Science for
Everyone 8000 04-11-00 8000
Sub-total
39689 14231 53920
IV Diwang
Makabansa-Wika 5150 5150
Hiyas sa Wika 4150 No data 40784
30000 05-22-02
6634 For
delivery
Sining sa Wika 5000 01-25-01
6430 12-10-01
1465 2001 12895
Sub-total 40784 18045 58829 19830
50
EFFECTIVE RELATIONSHIP/COORDINATION OF GOVERNMENT OFFICES
The Division Office however, failed to inform the IMCS that they were
purchasing the same textbooks to be supplied by the IMCS out of the MOOE
and SEF.
The absence of coordination between the City Government and the DepEd
and among the offices within the DepEd resulted in excessive procurement of
books in some subjects wasting valuable and limited resources while books in
other subjects are insufficient. It also demonstrate a breakdown on the
government’s strategy to supplement the budget of the DepEd thru SEMP I
with SEF to attain the government’s objective and target.
The strategy would only work if there is a system in place that would ensure
that the procurement is timely and responsive, well coordinated, will address
the priority needs and would prevent duplication of actions on a particular
need to avoid overprocurement and wastage of government’s limited
resources.
51
EFFECTIVE RELATIONSHIP/COORDINATION OF GOVERNMENT OFFICES
RECOMMENDATIONS
1. Informing the IMCS, the Regional Office and the City Government
regularly of the textbook condition clearly indicating the subjects
and grade level that have already attained the 1:1 textbook pupil
ratio and the excess quantity of books per subject and grade level for
possible redistribution to other Divisions;
3. Advising the IMCS on the specific textbook needs that could not be
addressed by the Division Office and the City Government.
52
Submitted in compliance with COA Assignment Order No. 2002-
023 dated July 18, 2002.
MILA M. LOPEZ
Team Member
LINA R. MACARAIG
Co-Team Leader
NORMITA N. NARVAEZ
Team Leader
Reviewed by:
SUSAN P. GARCIA
Team Supervisor
Approved by:
53