Owner MTR L&T

Items Case -1 Case - 2 Case - 3


MTR calc. (per
Flow (MMSCMD) 0.5 0.72 1
email)
PFD Case # 6 Back-calculated Back-calculated
Piping 3.86 1.0333 1.7712 3.0814
Heat Exchanger 0.2 0.2 0.2 0.1
1st Stage F-C 0.3 0.3 0.3 0.3
Carbon Bed 0.5 0.5 0.5 0.3
Particulate Filter 0.3 0.5 0.5 0.4
1st Stage Mem 0.7 0.7 0.7 0.5
2nd Stage F-C 0.3 0.5 0.5 0.4
2nd Stage Memb 0.6 0.7 0.7 0.5

FT-800 0.2
PV-801 0.2
NRV d/s of particulate filter 0.05 0.8 0.8 0.4
NRV d/s of 2nd stage mem 0.05
FT-806 0.2
Total 7.5 5.23 5.97 5.98

Note
For Case-2, flow iterated to achieve del. P of 6 kg/cm2.
For Case-3, flow iterated with actual pressure drop values instead of design pre. Drop values.