Professional Documents
Culture Documents
Equipment Rental
No. Qty Unit Unit Cost
1 Bagger concrete mixer 0 1 unit Php 500.00
Scaffolding (H-Frame) 0 1 unit Php 800.00
xxx 0 0 sets Php -
xxx 0 0 unit Php -
xxx 0 0 unit Php -
CHB WALL
Interior Wall
Mixture Class
CHB size
Project Title: Proposed Two Storey Residential Building Date: 10/31/2018
Location: Manga St. Quezon City Prepared By: BDT
Owner: Mr. & Mrs. Rellones Rev. No. 0
CHB Capacity
Deducted Area 2
Schedule of Door No. of Units Schedule of Window No. of Units
Door 1 = 1.89 m² 1 W1= 1.44 m² 1
Door 2 = m² W2= m²
Door 3 = m² W3= m²
Door 4= m² W 4= m²
Plastering
Thickness of Plastering (mm)
Mixture Class
No. of sides 2
Exterior Wall
Mixture Class
Size of CHB
CHB Capacity
Deducted Area
Schedule of Door No. of Units Schedule of Window No. of Units
Door 1 = 1.89 m² 1 W1= 1.44 m² 1
Door 2 = m² W2= m²
Door 3 = m² W3= m²
Door 4= m² W 4= m²
Plastering
Thickness of Plastering (mm)
Mixture Class
No. of sides 2
Project Title: Proposed Two Storey Residential Building Date: 10/31/2018
Location: Manga St. Quezon City Prepared By: JDT
Owner: Mr. & Mrs. Rellones Rev. No. 0
engr_bdt@yahoo.com 0936-922-1238
Bill Of Materials
Item No. Description No. Qty Unit Unit Cost Total
1.0 Materials:
Interior Wall
1.a Portland Cement (40 kg) 1.00 bags 244.00 244.00
1.b Sand 0.11 cu.m 900.00 100.22
1.c 4 inches (100mm) Non Load Bearing CHB 9 pcs 8.00 72.00
Exterior Wall
1.d Portland Cement (40 kg) 1.00 bags 244.00 244.00
1.e Sand 0.11 cu.m 900.00 100.22
1.f 4 inches (100mm) CHB Non Load Bearing 9 pcs 8.00 72.00
Sub-Total (1) 832.44
2.0 Equipment:
2.a 1 Bagger concrete mixer 0 1 unit 500.00 -
2.b Scaffolding (H-Frame) 0 1 unit 800.00 -
2.c xxx 0 0 sets - -
2.d xxx 0 0 unit - -
2.e xxx 0 0 unit - -
Sub-Total (2) -
Profit -
OCM -
VAT -
Total Indirect Cost: -