Recent amendments to the CoPTTM pages of the NZTA website

Part 8 of the Traffic Control Devices Manual (TCD Manual)


Code of Practice for Temporary Traffic Management (CoPTTM)
(CoPTTM) - (SP/M/010)
Fourth Edition – Amendments February 2017

Prepared by: Stuart Fraser for National Traffic and Safety Manager
Date of issue: February 2017

There have been a number of changes to the CoPTTM pages of the NZTA website since
October 2016. These changes and any effective dates are outlined below.
The changes to the website include:

Change / addition Date Comments

Revised update March 2017 Revision to update note to add:


note added to the • Revised TSL decision matrix
Amendments
section of the • Amendment to TMP (addition of TSL duration
website field in the TSL section of the TMP)
• Details of new section I-18 Guidance on TMP
Monitoring Processes for TSLs to this TMP

Update note Feb 2017 Effective date: 1 April 2017


added to the This technical note details all of the changes to
Amendments CoPTTM since August 2015. It also incorporates
section of the information from following technical notes:
website
Technical note Date of issue

Revised manual Feb 2017 Manual sections A through to H have been revised.
sections A new sections A-H combined has also been added to
the website.

New section I-15 Feb 2017 This includes NZTA endorsed diagrams for hydrant
NZ Fire Service inspection and flow testing which can be used in
Generic TMPs.

Issued February 2017 1


Recent amendments to the CoPTTM pages of the NZTA website

Change / addition Date Comments

Revised forms Feb 2017 The following forms have been revised:

Note: The previous version of each form has been


marked superseded and archived.

New form Feb 2017 An additional form has been added:


07. TSL matrix.

Technical notes Feb 2017 The following technical notes have been fully
marked as incorporated into CoPTTM:
superseded and •
archived

The original technical note has therefore been marked


as superseded and shifted to the Archived CoPTTM
documents section of the website.

L2/3 ROPE / Feb 2017 This new heading has been added for those
Practical undertaking the L2/3 practicing assessment or
assessment completing a ROPE for the renewal of their L2/3 STMS
documentation warrant.
The aim of adding this heading is to get all of the
requirements and documentation in one place.
The following documents have been added under this
heading:
Technical note: Changes to ROPE
Technical note: ROPE form master
L2/3 Trainers and Assessors.
Once the L2/3 practical assessment documents have
been revised, they will also be added to the website
under this heading.

NZTA TTM Feb 2017 Added a calendar of NZTA TTM related workshops.
training calendar Also included links to registration forms.

Issued February 2017 2