Delhimetrophaseiii, TBM 1: Project No.: S-839
Delhimetrophaseiii, TBM 1: Project No.: S-839
START END
AT: 28.10.2014 AT: 22:25: 20 AT: 29.10.2014 AT: 02:15: 22
THRUST CYLINDERS:
AVERAGE [KN] AVERAGE [BAR] MINIMUM [BAR] MAXIMUM [BAR]
GROUP A 622 27 5 45
GROUP B 2703 89 31 96
GROUP C 3625 95 56 141
GROUP D 1014 33 16 46
0 500 1000 1500 2000 2500 3000 3500
FORCE [ KN ]
TOTAL FORCE [KN] 7964 SPEED [ MM/MIN] 12 PENETRATION [MM/ REV] 4.0
DI SPLACEMENT:
AVERAGE [kN] AVERAGE [bar] MINIMUM [bar] MAXIMUM [bar]
GROUP A 530 83 19 156
GROUP B 1273 158 26 337
GROUP C 1543 192 48 325
0 500 1000 1500
FORCE [ kN]
START END
AT: 28.10.2014 AT: 22:25: 20 AT: 29.10.2014 AT: 02:15: 22
EARTH PRESSURE:
AVERAGE [BAR] MINIMUM [BAR] MAXIMUM [BAR]
1 0.03 0.0 0.0 0.0
2 0.11 0.1 0.1 0.3
3 0.07 0.1 0.0 0.2
4 0.04 0.0 0.0 0.0
5 0.07 0.1 0.0 0.2
6 0.03 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1
PRESSURE [ BAR ]
VALVE 1 2 3 4 S
STROKES 22 23 22 20 87
FOAM SYSTEM:
AVERAGE [BAR] MAXIMUM [BAR] QUANTITY LIQUID [ L]
MINIMUM [BAR] FLOW LIQUID [ L/ MIN] FLOW AIR [L/ MIN]
FOAM SYSTEM 1 0.8 0.2 1.9 27.7 1824 100
FOAM SYSTEM 2 0.7 0.4 0.7 37.8 2431 100
FOAM SYSTEM 3 1.4 1.1 1.5 34.4 2231 100
FOAM SYSTEM 4 0.2 0.1 0.4 0.9 0 110
AVERAGE
QUANTITY WATER [ L] 13669
FLOW WATER [ L/ MIN] 100
FLOW POLYMER [ L/ MIN] 2.1
QUANTITY POLYMER [L] 0