Espesor = 0,15 Vol x Dens

m2 Area m3 Vol Kg Masa

1,2,7,8 3 0.45 1080


3,4,5,6 1 0.15 360
9,10,15,16 4 0.6 1440
11,12,13,14 6 0.9 2160

VIGAS l (m) h vigas = l /


Ancho min Riesgo Alto 18,5
1 AB, 1BC, 2AB, 2BC 4 0.3 0.216
A12, B12 (2), C12 2 0.3 0.108
2AB, 2BC, 3AB, 3BC 4 0.3 0.216
A23, B23 (2), C23 5 0.3 0.270

COLUMNAS VIGAS KN (N) X 1000

A1 1AB,A12 31.15 31152.72


A2 2AB, A12, A23 98.44 98439.72
A3 A23,3AB 71.52 71524.92
B1 1AB, B12, 1BC 78.78 78783.36
B2 2AB, B12,2BC,B23 189.46 189463.08
B3 3AB, B23, 3BC 137.75 137752.44
C1 1BC, C12 31.15 31152.72
C2 C12, 2BC, C23 98.44 98439.72
C3 C23, 3BC 71.52 71524.92

AFERENTE AREA (m2) Area T. FIBROCEMENTO#4 peso Kg T #4

1,2,7,8 3 0.94 12.74


3,4,5,6 1 0.94 12.74
9,10,15,16 4 0.94 12.74
11,12,13,14 6 0.94 12.74

COLUMNAS vol. Columna (Kg)columna (N) columna


A1 N_4 0.207 496.8 4873.608
A1 N_3 0.207 496.8 4873.608
A1 N_2 0.207 496.8 4873.608
A1 N_1 0.207 496.8 4873.608
A1 N_0 0.207 496.8 4873.608

B2 N_4 0.207 496.8 4873.608


B2 N_3 0.207 496.8 4873.608
B2 N_2 0.207 496.8 4873.608
B2 N_1 0.207 496.8 4873.608
B2 N_0 0.207 496.8 4873.608
Masa x Grave N/1000 Carga Min = 0,8 Area x CU (6 KN/m2)
N Peso KN Peso KN Baldosa KN CM total CV = almacenamiento CM Mayorada
liviano = 6 KN/m2
10594.8 10.59 2.4 12.99 18 ###
3531.6 3.53 0.8 4.33 6 5.20
14126.4 14.13 3.2 17.33 24 ###
21189.6 21.19 4.8 25.99 36 ###

h = viga m2 area m3 vol Kg masa N CM viga peso kN peso viga

0.3 0.09 0.36 864 8476 8.48


0.3 0.09 0.18 432 4238 4.24
0.3 0.09 0.36 864 8476 8.48
0.3 0.09 0.45 1080 10595 10.59

(KG) / 9,81 TON / 1000 AREA DIMENSIONES

3175.61 3.18 136.6 30X30


10034.63 10.03 431.5 30X30
7291.02 7.29 313.5 30X30
8030.92 8.03 345.3 30X30
19313.26 19.31 347.6 30X30
14042.04 14.04 603.8 30X30
3175.61 3.18 136.6 30X30
10034.63 10.03 431.5 30X30
7291.02 7.29 313.5 30X30

CM T#4 (Kg) CM T#4 (N) CM T#4 (KN)

40.6595744681 398.870426 0.39887042553


13.5531914894 132.956809 0.13295680851
54.2127659574 531.827234 0.53182723404
81.3191489362 797.740851 0.79774085106

(KN) columna suma CM vol.col sotano (Kg)


4.873608 5.13952162 0.36 864
4.873608 41.1658496
4.873608 68.8742576
4.873608 96.5826656
4.873608 127.893306

4.873608 6.73500332
4.873608 136.17
4.873608 270.48
4.873608 404.79
4.873608 539.09
CV Mayorada CT Mayorada CT Mayorada / 2

21.6 37.19 18.59688


7.2 12.40 6.19896
28.8 49.59 24.79584
43.2 74.39 37.19376

kN peso viga / CT viga kN CT viga Kn/2


2
4.23792 45.67 22.8348
2.11896 16.64 8.31792
4.23792 58.07 29.03376
5.2974 84.98 42.49116

(N) (KN)
8475.84 8.47584