at
Pe a
F1Lgded TEBHAAVEL:
aNVHS. dO: fen
301S GNVH 1439| MEMORANDUM
Mr EM Moeron,
To AL Zany Date 21 June ‘95
&
From Adrian Roper Ref
Subject Revised data sheets
Copies
4-400 SERIES OVERHEAD TRAVELLING CRANE
LEADING DIMENSION BOOK
Errors have been discovered on sheets included in this book and revised copies are
included herewith as follows:
@
~~ 804N.Wws RevA Height of lift changed from 6.5 to 7.0 metres
4NWW.WS Reva Height of lift changed from 6.5 to 7.0 metres
“— _BD4L.WS RevA Height of lift changed from 10.0 to 13.0 metres :
—B04LWW.WS, RevA Height of lift changed from 10.0 to 13.0 metres
~ 10D4N.WS RevA Height of lift changed from 6.5 to 7.0 metres
—10D4NWW.WS Reva Height of lift changed from 6.5 to 7.0 metres
—T0D4L.ws RevA Height of lift changed from 10.0 to 13.0 metres
—10D4LWW.WS —RevA Height of lift changed from 10.0 to 13.0 metres
- 12D4N.WS Rev A Height of lift changed from 6.5 to 7.0 metres
-12D4NWW.WS Reva Height of lift changed from 6.5 to 7.0 metres
~ 12D4L.WS RevA Height of lift changed from 10.0 to 13.0 metres
-12D4LWW.WS —RevA Height of lift changed from 10.0 to 13.0 metres.
2 1202N.WS RevA Unit changed from 450 to 455
-12D2NWW.WS_—RevA Unit changed from 450 to 455
12021. WS RevA Unit changed from 450 to 455
@ _12021.wwws RevA Unit changed from 450 to 455
¢/——NSjease replace the Supersedég sheets in your book without delay.
Wil fecipients of copies destined for our overseas partners please ensure that this
‘ata and this memo is forwarded to them without delay.
«
®@
ee,| =
INDUSTRIAL CRANE DIVISION
4-400 SERIES OVERHEAD TRAVELLING CRANE
LEADING DIMENSION BOOK
ies
BOOK No. 20
ISSUED TO: aL 2am
g The contents of this book are controlled and must not be
~_Photocopied or altered in any way.
pm~ Na
aM“
2)
Authorised by: (\\ {Ghew
Date: 7/ & / "5
No. | Page Amendments to this Issue Date
~ 14-400 SERIES CRAB STARDARD SELECTION CUAL?
CALCULATION OF CRANE LEADING DInENSTONS
Th leaging disensions of the 4-400 series of electric overhead travelling cranes are given on the data sheets included
{in this sanval. Hovever certain dinensions aust be established by calculation as follovs.
Tt vill be useful to have a copy of blank 6A
ster to hand to interpret the
Calculation of disensions 'P’ or "h! (Height of Litt or gantry rail height).
The data sheets give values of dizension 'D’ and dinension ‘V" Dimension "0" already contains the Morris stancerd
clearance of 75a. Oisension 'C' is celeulated by adding 7Saa to Ginension 'V' if the custoner has not given the actual
value of disension 'c’ available. If the customer has given an actual value of dimension 'C’ then dixension is.
& subtracted froa the given value to establish the actual clearance betveen the too of ‘the crane and the underside of the
lovest obstructien. This value aust be areater than 7San If it is not the next construction of crane mist te ene vo
Cm Ser th rete disension "V7, IF tats te not bees carcait 2a 0.0. If the actual clearance is greater than 75
™“™ then dimension 'D’ aust be increased accordingly
GENERAL EQUATION: WeeePen
For a siven installation if the custoner requires a certain heisht’of Lift Fam then the oantry height is given by :=
(c
10-6
wereo a>
Conversely if the custoaer gives the height to the top'of the gantry rail Haw then the aati
height of itt is i=
Penec-0
(care shouldbe taten if the hook has to Lover into a pit Belov the Lover datus level for diaension *#"),
e
oon
aD NSte OVER pase For CALCULATION OF OINENSTON *S*, THE HEIGHT TO THE UNDERSIDE OF THE CRANE).
DATA SHEET No, := cALcorn us
Teneo.
RevIsION °
ISSUE ATE: s/ci9s are.ae
-400 SERIES CRANE STARDARD SELECTION CHART
ADDITIONS/CHARGES LEQOIRED TO COMPLE VITH MACHINERT'S DIBECTIVE. (CB HARK) °
In order to aeet the requirenents of the Kachinery's Directive and apply the CE logo to the finished crane, the
folloving changes aust be sade to the base standard crane vhich is sold into all other aarkets.
1. The crane aust be fitted vith the correct control panels. (These panels are fitted vith additional controls to
respond to phase loss, to the load liniting device and to the ultiaate overboisting svitch)
2. If the crane does aot have 2 valkvay then safety harness anchor poiats aust be supplied.
11 cranes not belov 1000Kg Lifting capacity aust be fitted with an autoratic Load limiting device,
\All cranes aust be {itted vith an ultiaate boist
rt sviteh.
in audible alara ust be fitted to sound if the crane is overloaded.
All electrical enclosures aust carry vatning labels.
7. Cranes fitted vith cabins aust be supplied vith an escape harness.
8. Cranes fitted vith banks of resistance spools aust be supplied vith a fire extinguisher.
5. Cranes fitted vith cages aust have a fire extinguisher fitted if there is equpiuent likely to cause a fire in the
cage.
19. The CE Logo and otter necessary labels aust be applied to the bridge structure.
‘The docunentation package aust include the crane Safety Supplement and the Schedule of Weights.
LSpot-aateriais 6196 + 6001 should be written on the Yorks Instruction Steet to call for all the aechanical coaponests
“Fit labels/positions, Hoist uaits stould be ordered with load liniters.
DATA SHEET Ho. cerons.¥s
tevision =: 0
1SSUE DATE SHI3SCIGHTS ON {-400 SERIES CRANES
3/1/95 PAGE 1 OF 2
DATE. 23 42,
‘THIS TAFORKATION 1$ TO BE USED TO ASSIST IN THE CREATION OP THE YEIGHT SCHEDULE
SUPPLIED WITH BACH 4-400 SERIES CEANE SUPPLIED IRTO THE BOROPEAR COKKONITY.
1. Weight of conplete crane v+ SEB GENERAL ARLANGEMERT
2, Weight of crane bridge coaplete,
3. Weight of hoist unit..... SER TABLE BELOW ~ VALUES IN KILOGRAKS
1 Lov wD sto HD | AST ATR
$ BASE ONIT =} DRUK} REBVED | CRAB
: FwORL $ 2/l } 390 300 156
Foe as YHORL $a} 390 no GL
: $ tow $l $4 a 200
tow fal 470M BuLT
46
sts 615 4s u
530 620 36
wor euILT
410 6 425 i
m
PWORML {2/1
20 PHORAL {4/1 151 150
foe fal} 35a no
1 toe fan
4235 101s aor Burt
1618 yor aurut
' 2} HOBKAL ! 16
asd 455 CHOWKAL {4/1 {2555 ROP BUILT Not BUILT 206
: GorG afl $2028 nor aur 1794
ons
Hor BUILT Nor BUILT
4. Weight of geared girder & valkvap
Yeight of 40 an square bar rail = 12.6 kg/aetre
Weight o€ 50 aa square bar rail = 19.6 kg/aetre
HOTE :1 this Coruula is ONLT true for standard sheet steel valkvays vbick typically veigh J0kg
ber etre. This figure includes an allowance for the panel etc. For veights of girders
vith other platforas consult the D.0.
(WEIGHT OF COMRLETE CRANE ~ WEIGHT OF HOISTING UNIT)
(WEIGHT OP GIEDEL & RAIL PER METRE + 30 kg/uetre) * seanTy CE
= Sieiabsatat tte of
aoe
wae y
cae = 3NVHO 30 i]
Ss 3QIS ONVH 1337 1
baa 1
BINS Wve) NVdS