You are on page 1of 4
‘JOBSAFETY ANALYSIS 400 Sep Potential Hazard Rak ating ‘Control Method Resid Risk ‘Secure nesesary | ork perm ‘Work who Avorn ‘Sess appropri Hot Work Peni om authorind TRSA work Ensure tat all he reunited in the permite Compiled price to art the work 2 Preah bring Tack ofiowedge oat ‘indesign Iseing ‘Superior foreman sal be reponse conaing BT specific tothe activity in clear nner, sing tis JSA as rerence, Supervisor! freran sal asl the TT na language tat workers ca ily understand Supervisor! fran sal check paso pozcve equipment of cach re prio to stato he vi General preparation Una wh ie Al ew wookrs all be asigned wide peso To glde them and filirze tha with he work, the plas apd the ates. Poor Fania Tob planning tal ake nto consideration ofall HSE apes and prevetive measures when conduction the joints visit proto pinning. |All epproved and lvant documentation an pene infomaton Shall be rable (Metied Steet, Jo Safety Analyse). Egipent Flare Eguipmant shall ave x valid CONTRACTOR inspection sicker prior te deploy on ste Pree iapectos, Inpetion bl lecude checking the fimcinaty fst devices. ‘Egeipment sal bused in aesardance wih the manicures (Checks fo soupment must be ile up pire sta he saupmentin daly basis ‘Grtied Pernod ‘Ony autora etd personel knowlodgeale we ope ie eipmeat {ob Step Potential Hazard (Control Method 1 Cattng radia, Tar Damage deo Bose Noire. ‘se ar Pg or Ear Goh Use good quality comet ried Grinding / cating whee ‘Use Good quality CE mark cried power tals Maina the poser ool properly acceding to the manufatrer Fiend Bar Kecp the work are fe form any conusibe male sah -wood papel ol and grease ‘Use fie resistance loves to protect the and foem spark “Thaned TRSA approved Sire watch nus ese near the work unl the pining work ish, Fir extinguisher st be preset inthe work ee, Replace the damaged electri cod immediatly. ad eld power ols mst be good quali with CE enter. Taj caused by ariding ‘shes ‘nly ened TRSA approved echniian mus we the ower tools and eld power os mst be good gay with CE ceriaton. Ure Pull fice sala Ure ort ated rindingleuting wheels Use oer toon accordance with the instruc ofthe manufacturer, Secure the rindingleting wheal ily Use the ower tools for inland purpese ony. (Le. wing Grinding wel fo euting the Mesa.) Dont remove te safety gor, bale ‘Use only rndg machine ht ited with constant presse sith ot lw unnecessary person inthe rnding wrk are. Dot ive excessive forse onthe mache Face shi ns ewe all eine fo any nding activities Grinding ols al not eed unless the maximum pemisible speed isclery marked on the wheel and eae. See Figure 17. “Te umsing spend sal aot excend the mamum permissible speed Display on the grieding wheel Poge 318 isk ating (Control Method Residual sk trading dling ‘Bo nt luis The power ols (La: aging eel by Rolin power eo) Main witch extension box must be teachable dance. Extension box must be ited with GFCT Replce the damaged elec cord immedi. Repair any aletion on cod or power nls by non-compete puso ar ot alowed inhalation of ds Expose excessive Noise Inj by siping he ding ria. Tey by fy of the broken tool Toc cased by ase staring of equipment Injry by entanglement of| oth ‘Use Dust nak, Kogp te working wea Seah nd ‘Ue ea plu or er gar ‘Malta he ling machine prope. (nly Thsined TRSA approved iecnician must ws the power os and eld power ols mast be good quality with CE cetieton, Use ower tools in accordance wit the instrotion of he Dnt remove te handle inthe mache Ure corct ted ol it Donot apy excessive orc, Use appropcnte PPE gels, loves, Safety sos, ‘Ue only power il that are fied with constant presse swith ‘While wing dling do neue oose lth, Make sue the power toe haiag a “Deadman swt before se [8 Caatweiing oten metal Wat can ease ‘hin bur avo cad welsing Tot Work permit be obtined prior start work “Area must be properly barened, ie watchman wit re ‘stinger sal be yale Ensue no fammabllcombusible mates acr working ac. Daily checking and regular maintenance to evid any chance of afc, ‘Use fce shi, goggles undereath wih ANSI standod Hot wor aren sal Be covered wth Fie bank Use ster fre tring ad welcing proses {lean old before ech sot. “Appropne PPE" shal be provided (.. FRC, welding gloves, spon safety shoes) Page aor sob Sep Potential Hazara "Rik ating (Control Method Residual Continuation of Cad welding + proper “Tools and equipment shal Be ispeciod by quali personel and calor ended prior ous. + Novinipeed, Dees oF Damage ‘Ailtol nd equipoen sal be vill specie by we poo se and regularly maintained “Tools and exigent with dfs or amage shal be aneately taken out of service for repair or rmove om heb ste and replaceé Molise wes in accordance with he manufacturers + TaauthorzedPeronneito performed the All personnel workers tal be coed und wall ined Inston of umes ‘Resp potion sgupmen sal Be provided and vad as eed, See Chater 3, Pasral Protective Equipment PPE) + Fre Ourbastofpowde Fir esate shal be sd CCombusble material sound the work aren shal be emoved andor protected agin spt, ago eating Hreqrot mello Fire lanket ory wering UULEM Fire etnguisher) sal be readily vaablenearthe hot work arn 2 aied fire wath shall e assigned te ay ot work operation. “There wath shall remain nth week te during hese actives tnd for no les than 30 minutes er the hot werk bas ised. ‘Appropriate PPE" shal be povided (FRC, welding loves, pon, safety shoes, face shield) let git wil be used ul weld activites © Working during tight shi extended hows Poor aaatan onthe working reas Ensure sult iuminaion sal be provided “Te lighing/luminton sal be mod ona plo plan and work hal Be stopped if suet ination sno provided Scien warming igh shal alo be leat specific reso vn eer constr and ac ofthe works being eased tn the sree. Pagesets

You might also like