You are on page 1of 5
0B STEPS: POTENTIAL HAZARDS: PREVENTIVE AND CONTROL MEASURES RESIDUAL RISK. ‘ppl for PTW Untrained Parma Reoaiver > Permit ReceNed shal be avalabe voughout the duration of he ‘ety > Only trained Permt Receivers shall ppl foe PTW. PTW non-cenermance > PTW shal be secured and obtained fora actiies winout | exception. > PTW shal be kept and splayed onthe working area at a tines > PTW shal be cacureed to all workers. Werkare shal know the locaton athe PTW at alti. Preaek Btn Lack of know not understanding not istening > Superior / Foreman shall be resporsite for conducting TET speafe to the ecy ina oar manner, using Mis 8A 35 Feterence. > Superdsor/ Foreman shal translate the TST in a language at ‘workers can easly understand > Superior / Foreman shall quz the workforce and address Toecfe. and cect work ‘ested hazards and emergency procesizes questons. to ensure’ tney” understand the Peceutons and method obs folowed > Supervisor! Foreman shall chock parsonal protective equipment ‘teach cow porto the sta of be actives ‘General preparation fhe work namin th Ste > All new workers shal be assgned with a designated person to ‘uid them ans famstarze them wh te work the pace 2nd fhe aches > Al workers shal be gues by the Supenisor. Poor planning > Job planning shal take into consideration all HSE aspects and Preventive measures when conduction the jot ete vist prot ‘planning > All approved relovat documentation and ertnnt information shall be avaiable (Metiod Statement, Job Safety Anairss, te) aie Continue General preparation of ‘the work ‘Sips, ips and fas > Access and walkways shal be kept ee fom cbsbuctons. > Areas shal be minted clean and retro any obstruction > Proper storage area shall be provided to keep all tools and ratarale sored nt Man-machina terface Al parsonnel at Site shall wear high wally vest ata tines ‘en working at Ste > Al working afeas shal insta proper barreade and signs as required fr he aches peronmesin > Peseatian movement shal be separated from vehicle rmoverent Blological hazards > Al personnel hal report Seourty when any dangerous ania are found at Ste (snakes, scorpons, dessert foxes, dogs, et) > Werk place sal be kept lean and fee fom any waste food. > All_workere shall weer the minimum personal protective equipment required forthe project (safety helmet safety ‘Jastes, high visit vest, safety shoes) and forthe spect Ectvy beng cared out (eg. adequate safety gloves) > tems that may pose a biological risk shall be adequately “deposed of Ne ware facts > Priorto stat of the work, the folowing faces must be provide: Test sneer, portable toll, water arnungstabon, prayer are, washing area > Rest shatar shal have enough spece for all personel inthe ‘area and wil be proved wth fan. > Dring wate al be renewed fre thing every maming before ‘commencing the setuiies, and shall be Kept Sls By ug es nd insulating materals ‘Suey Works > REFER TO JSA SURVEY WORKS aia ee ae |e aa eoea ed Sasori rt eee eens ce rere naa are areas cam aS — | with portable air compressor Compressed ai causing serious Body injury sbuck by tose a hose > Ar compressor must be inspected and approved by GAC Inspector and! o TR iapedtr pro use nthe ste > Safety device ae 9 be fied to all tools and equipment and be ‘operational before use as per manutacra’sspeticaons > Flow conto valves tobe fed onal supply nes. > Safely cips ate tobe used in quick sap coupings. > Safety chains are to be used i ted > Whip checks ares o be sed ifchans not ited > Enaue noses re corecty connected and are not crimped, ed “srcamagee > Senicng of equipments tobe cared ou as per manutactrers ‘Speseatone and records maintanes > Before opaing a vale fom the ar supply tne, check tht the hove and coanestons are not damages ang held the and of theese to top k whipping about wnen the ais tuned on > Never use compressed ai to clean your clothes or har. Eye “SShage or ruptured eaerums may result rom ao ti | Cuting of existing esphait with Cutter machine Fang orivne Sebie > Workpisce shall be propery barrcaded wih signs posted to ‘oi! unautborzed ony of the workers, > User shall wear proper PPE (hard hat eye protecton, face ‘Sie eat pug, dust mask and disposable cover all during the speraton. > cutter machine shal be inspected prior to use inthe > Daly inspactons checklist must be property fA-up by competent ‘error na sally bess aoa Spears hart ust (ia) > User hall wear proper PPE (hard hat, eye protection, foce ‘Shia, ear pug, dust mask and dsposable cove al) curing he operation Try om Improper st up ex operation > Operator shal be property trained orto operate he machine >A conmecions, mountings, guards and contols on the [equipment must be pected pie use, > User shall wear proper PPE (hard hat, eye protection, face ‘shel ear plug, dust mask and sposable cover a) during te operation “Applieaion of Prime coat CTO) anal or Tack coat (RC250) > Long seeved bting, safely footwear, gloves and eye protection > Supenisolfereman shal be responsible for conducting TST “pectic tthe sey near manner using SDS ae reference {o workers tated at ese actives, > Firsts kt and eye wash must be avaiable at constuction sie, > Handle chemicalin accordance with material safety data sheet > Assess adjacent obstucions, parked veces, traf et for isk ‘of contamination and remove obsbuston or place afl contol measures fo mitgte rk Personnel caught ory eTNG ‘nice > Maintain viglanes fr ground personnel curing spray run. Sound ham tice before commencing spraying. Maintain cesrance ‘stance and stop Fearance distances are breached Fal fom wuck or Stuck by moving tuck > Appoint speternese handler who algo guides movement of ‘prayer > Prove Trained Flagman for guiing the tuck. Fang fom cae > Always use tree pots of contact when entenng and exing ‘ote, donot jum > aways face vehce when entarng an extng > Steering wheel sal not be as hand nod sia ‘Sef out paver rans and levels (ine ‘mark with palnt o wire rope) Fingers engin by malariae > Proper posfoning whe exenlon arms used wih pint canto Tnimize bending of to back > Wear eye potecton when elening spray nozaes. Placement of asphalt binder ‘wearing course with paver which {is lod rom tpper. Manual placement with shovels & rakes {equired. Some cleaning may be required a the front ofthe paver Wiariers caught in by machines? ‘equipment orhang muy > Use mechanical means where evr practic! > Warm up exercises, correct posture, and comet tectnique > Take regular breakstotate work > Wea gloves a required > Equipment and systems must be checked fr proper operation at “he sar ofeath ent > Equipment general repairs shall be not be mad on st except ‘omergoney besksoun, rebar shout be done only Gcaigatod rea > Donat coebustvoate workers access dung he eaulpment ‘peratons;eopaate te walkways withthe barseades, Sigages ana ights > Trained fagmen ars requred at ll equipment operation locations ‘goat Gono the woedore and Wate movement Rvarsing vets wi estctad Fear vison (ping asphalt into aver) 5 Allivexs to have completed a company inaucton oS ‘aring stb ste, ‘Allocate dasated operators, Alloperators shallhave val [SAG avers licenses including SAUDI ARANCO certeaton ‘Al equpment shall be reviewed & approved by TR equipment Inspect: WAS ehallbe installed on all Heavy Equipment and Tucks. ‘All sucks to completo an operators presat chee & be fits wih reversing beepers &retating lasing beacon Denot revere ino hopper undlunder te guidance othe trained flagman wi rod helmet, igh visa orange color vest and whist, verse a waking pace Seund norm to am poopl of your presence ‘Aways Use miors and lookin arazion of ravel No groune personnel permed in onto paver when tuck reversing ‘Trained tagman st moving equpment be assign to contol he afc fow of the

You might also like