Professional Documents
Culture Documents
Land Securities,
Explanation of Schedules
Actuals 2016-17
Visit landsec.com
Everything is experience
Anchor-Meet
Service Charge Expenditure Report 2016-17 2
Meet Landsec
Welcome to Landsec
Explanation of Schedules
Actuals 2016-17
Apportionment
Summary of Variances
to Landsec
Welcome
Garret O’Neill, One New Change
Anchor-Welcome
Service Charge Expenditure Report 2016-17 3
Welcome to Landsec Meet Landsec
Welcome to Landsec
Explanation of Schedules
Actuals 2016-17
Apportionment
Summary of Variances
to Landsec
We have achieved significant savings
against utilities through a number of
energy reduction measures, but these have
largely been offset by several unforeseen
Welcome
repairs to plant within the building and an
enhancement to the security resource.
We are consistently achieving over 80%
recycling for the property, which is a
fantastic achievement.
As previously advised, we have now
completed the re-tendering of the
security, cleaning and engineering
maintenance contracts, which came into
effect from 1st April 2017. We are pleased
to report that all service partners retained
One New Change
Warm regards
Hiren Patel
Operations Manager
to Landsec
— Service Charge Expenditure Report will NOT include:
the property for the period 01/04/2016
— Service Charge Allocation — Initial costs in relation to 31/03/2017, in accordance with
and Apportionment to the original design the terms of the lease and, where
— Service Charge Operational and construction practicable, the RICS Code of Practice
Overview of Variances — Setting up costs that are part Service Charges in Commercial
Actuals
This report has been produced by
Landsec, the Landlord of the property,
and relates to the service charge period
of the original development
— Improvement costs above normal
maintenance, repair or
replacement except where an
Welcome
Property (Third Edition).
At year end there are amounts
totalling £94,633.74 which have been
improvement can be justified provided for in the service charge
of 1st April 2016 - 31st March 2017. to provide benefit to the occupiers expenditure - these allowances have
This service charge statement was — Redevelopment costs been made to account for expenditure
prepared on an accruals basis. — Costs which relate to where invoices have not been received.
individual occupiers
Royal Institution of Signed:
Chartered Surveyors Payment of Interest -
(RICS) Code of Practice, It is our policy not to apply
Garret O’Neill, One New Change
of Schedules
Explanation
Alia Hashem, N0VA, Victoria
Anchor-Schedules
Service Charge Expenditure Report 2016-17 6
Explanation of the Schedules Meet Landsec
Welcome to Landsec
Explanation of Schedules
Actuals 2016-17
Apportionment
Summary of Variances
of Schedules
access via the Cathedral entrance. allocated and that customers only
LOADBAY Services which benefit the retail customers contribute toward the services
Explanation
SPLIT FLOOR Services which benefit office customers with split floors. from which they benefit.
CARPARK Services which benefit office customers.
LIFTS G-5 Services which benefit office customers.
SPECIAL UNIT A contribution made by Gymbox which
credits the ALL schedule.
Alia Hashem, N0VA, Victoria
Actuals
2016-17
62 Buckingham Gate
Perry Locke,
Anchor-Actuals
Service Charge Expenditure Report 2016-17 8
Actuals - Overview Meet Landsec
Welcome to Landsec
Year Ending 31 March 2017
Explanation of Schedules
Actuals 2016-17
Apportionment
Summary of Variances
Actuals
2016-17
£2,185,876
Total Actuals
Actual (£) Budget (£) Variance (£) Variance (%) Actual (£)
2016-2017 2016-2017 2016-2017 2016-2017 2015-2016
Management
Management Fees 72,162 72,162 0 0.0% 69,213
Site Management Resources 259,111 275,436 (16,324) (5.9%) 250,250
Health, Safety & Environmental 19,015 14,557 4,458 30.6% 17,647
Management Sub-total 350,289 362,155 (11,866) (3.3%) 337,110
Utilities
Electricity 191,720 267,469 (75,749) (28.3%) 231,078
Gas 11,730 19,709 (7,979) (40.5%) 17,184
Fuel Oil (Heating) 0 3,000 (3,000) (100.0%) 0
Water 28,576 30,919 (2,343) (7.6%) 30,265
Utilities Sub-total 232,026 321,097 (89,071) (27.7%) 278,527
Soft Services
Security 688,970 654,509 34,461 5.3% 662,155
Cleaning & Environmental 261,463 260,237 1,226 0.5% 242,242
Actuals
Soft Services Sub-total 950,433 914,746 35,687 3.9% 904,397
Hard Services
Mechanical & Electrical Service
Lift & Escalators
492,650
36,726
464,848
38,858
27,802
(2,132)
2016-17
6.0%
(5.5%)
466,207
37,263
Suspended Access Equipment 8,894 9,537 (643) (6.7%) 7,096
Fabric Repairs & Maintenance 53,444 35,759 17,685 49.5% 59,561
Hard Services Sub-total 591,714 549,002 42,712 7.8% 570,127
62 Buckingham Gate
Perry Locke,
Actual (£) Budget (£) Variance (£) Variance (%) Actual (£)
2016-2017 2016-2017 2016-2017 2016-2017 2015-2016
Insurance
Engineering Insurance 7,287 7,440 (152) (2.0%) 11,154
Insurance Sub-total 7,287 7,440 (152) (2.0%) 11,154
Exceptional Expenditure
Major Works 54,126 55,201 (1,075) (1.9%) 27,881
Exceptional Expenditure Sub-total 54,126 55,201 (1,075) (1.9%) 27,881
2016-17
62 Buckingham Gate
Perry Locke,
Utilities
Electricity 191,720 7,300 9,904 23,793 6,077 11,143 127,444 6,059 0
Electricity Lighting 158,471 7,300 7,140 18,598 198 8,310 111,206 5,719 0
Electricity - Lifts/Escalators 22,955 0 2,209 3,864 5,538 2,209 9,135 0 0
CRC Electricity 10,293 0 555 1,331 341 625 7,103 340 0
Gas 11,730 0 0 1,665 0 0 10,065 0 0
Actuals
Actuals
Gas 10,338 0 0 1,555 0 0 8,784 0 0
2016-17
CRC Gas
Water
Water
Utilities Sub-Total
Soft Services
Security
Security
Cleaning & Environmental
Cleaning
1,392 0 0 110
28,576 0 0
28,576 0 0
232,026 7,300
688,970 245,665
688,970 245,665
261,463
176,446
8,139
16
9,904
0
1,991
0
2016-17
4,286
4,286
29,744
0 89,928
89,928
31,370
17,543
0 0
0 0
0 0
6,077 11,143
1,282 0 0
24,290 0 0
24,290 0 0
161,798
0 58,866 294,511
0
0
0
58,866
37,033
0
294,511
154,679
136,850
6,059
0
0
28,250
22,037
0
0
0
0
0
62 Buckingham Gate
Insurance
Engineering Insurance
Lift/Escalator Insurance
General Engineering
Insurance/Inspection
Insurance Sub-Total
7,287
3,049
4,239
7,287
Exceptional Expenditure
591,714
194
0
194
194
24
0
24
24
57,378
1,984
455
1,530
1,984
973
973
0
973
21,244
196
110
87
196
2016-17
57,372
3,915
1,512
2,404
3,915
0
0
0
0
0
0
0
0
12,623 25,604 415,330 2,163 0
62 Buckingham Gate
Total 2,185,876 530,475 34,456 239,745 20,823 137,454 1,157,098 37,988 27,837
Apportionment
Service Charge
Flossy Nwofor, 100 Victoria Street
Anchor-Apport
Service Charge Expenditure Report 2016-17 14
Service Charge Apportionment Meet Landsec
Welcome to Landsec
Year Ending 31 March 2017
Explanation of Schedules
Actuals 2016-17
Apportionment
Summary of Variances
Aportinment
Flossy Nwofor, 100 Victoria Street
Address
1st Floor 123 Victoria Street
Part 2nd Floor 123 Victoria Street
Part 3rd Floor 123 Victoria Street
4th Floor (Zone A) &
1 Car Parking Space 123 Victoria Street
5th Floor 123 Victoria Street
6th Floor 123 Victoria Street
7th Floor 123 Victoria Street & 4 Car Spaces
8th Floor 123 Victoria Street & 4 Car Spaces
9th Floor 123 Victoria Street & 4 Car Spaces
10th Floor 123 Victoria Street & 4 Car Spaces
11th Floor 123 Victoria Street & 4 Car Spaces
1st/2nd Floors (Piazza) & 2 Car Spaces
4th Floor (Piazza) & 1 Car Parking Space
Part 2nd Floor 123 Victoria Street
Part 3rd Floor 123 Victoria Street
3rd Floor (Piazza) & 1 Car Parking Space
107/111 Victoria Street
113 Victoria Street
115/117 Victoria Street
119/121 Victoria Street
125 Victoria Street
131 Victoria Street Grnd & Basemt
133 Victoria Street
135 Victoria Street
137 Victoria Street
139 Victoria Street
141 Victoria Street
143 Victoria Street
145 Victoria Street
147 Victoria Street
149/151 Victoria Street
127/129 Victoria Street
Part Sub Basement 123 Victoria Street
Car Spaces
7.79%
7.21%
4.98%
3.89%
3.61%
2.85%
2.72%
2.66%
7.43%
1.25%
8.04%
7.78%
4.17%
1.72%
1.36%
1.08%
1.44%
0.82%
0.72%
0.57%
0.60%
0.52%
Apportionment
18.27%
5.87%
5.50%
10.64%
9.84%
6.80%
3.89%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
MAIN
Service Charge
5.31%
4.93%
3.71%
3.64%
0.00%
0.00%
10.98%
10.62%
0.00%
0.00%
2.56%
2.56%
2.56%
2.56%
0.00%
0.00%
10.26%
10.26%
10.26%
10.26%
10.26%
5.13%
2.56%
5.13%
2.56%
2.56%
0.00%
0.00%
0.00%
0.00%
0.21% 0.00% 0.00% 0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.06% 0.00% 0.00% 0.00%
0.45%
0.55%
0.71%
1.67%
1.44%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00% 0.00% 20.51% 0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
12.58%
9.94%
7.93%
10.56%
5.98%
5.30%
4.15%
4.37%
3.85%
3.27%
4.03%
5.23%
12.25%
10.57%
0.00%
SPLIT
FLOOR CATHEDRAL
ALL ENTRANCE CARPARK LOADBAY C/PTS LIFTSG-5
0.00%
17.81%
16.69%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
33.30%
32.20%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
£530,475
8.19%
7.67%
14.83%
13.73%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
15.31%
14.81%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
RECEPTION
£1,157,098
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SPECIAL
57.81%
9.72%
0.00%
0.00%
32.47%
£34,456
UNIT
27,837
£137,454
22,808
21,379
41,319
38,242
26,425
20,609
19,153
15,120
14,416
14,132
39,423
6,626
42,646
41,248
22,140
9,107
7,192
5,739
7,644
4,326
3,838
3,003
3,159
2,783
2,364
2,916
3,788
8,868
7,651
£37,988
-
-
MAIN
67,937
63,682
123,076
113,911
78,713
61,388
57,051
45,039
42,942
42,095
127,030
122,864
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
883
883
883
-
-
3,534
3,534
3,534
3,534
3,534
1,767
883
1,767
883
883
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- 7,068
£20,823 £239,745
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
17,294
13,659
10,898
14,517
-
8,216
7,289
5,704
6,000
5,286
4,489
16,842
14,530
£2,185,876
-
5,538
7,193
-
-
SPLIT
FLOOR CATHEDRAL
ALL ENTRANCE CARPARK LOADBAY C/PTS LIFTSG-5 RECEPTION
70,961 211,370 883 - -
6,765
6,341
-
-
-
-
-
-
-
-
-
-
12,649
12,234
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5,304
1,705
1,598
3,088
2,858
-
-
-
-
-
-
-
-
3,187
3,083
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
138,606
23,296
-
-
77,843
-
-
-
-
-
-
-
-
-
TOTAL
288,518
100,097
93,884
168,366
155,011
105,139
85,531
79,738
63,693
60,892
59,761
179,796
30,805
187,279
180,312
100,867
26,401
- 337
-
-
-
-
-
-
20,851
16,637
22,160
- 1,112
12,542
11,127
8,707
9,159
8,069
6,853
8,455
10,980
25,710
22,180
27,837
- 7,068
15
Meet Landsec
Welcome to Landsec
Explanation of Schedules
Actuals 2016-17
Apportionment
Summary of Variances
of Variances
Summary
16 Palace Street
Jordon Joseph,
Anchor-Variances
Service Charge Expenditure Report 2016-17 16
Summary of Variances Meet Landsec
Welcome to Landsec
Year Ending 31 March 2017
Explanation of Schedules
Actuals 2016-17
Apportionment
Summary of Variances
% Variance
against forecast
-1.1%
of Variances
Summary
-10% to -5%
-5% to 0%
£2,209,641
Forecast (£)
0% to +5% 2016 - 2017
+5% to +10%
£2,185,876
16 Palace Street
Jordon Joseph,
Actuals (£)
2016 - 2017
Management Utilities
£362,155 £321,097
of Variances
Budget (£) Budget (£)
£350,289 £232,026
Actual (£) Actual (£)
(£11,866)
Variance (£)
(£89,071)
Variance (£) Summary
Site Management Resources Electricity
With the network maintenance provider A number of energy reduction measures
entering the final year of their contract, the including plant optimisation and lighting
warranty renewal for the I.T. hardware was not improvements have contributed to savings
put in place at the beginning of the financial year in electricity costs through the year.
which led to an underspend against this heading.
Gas
Health, Safety & Environmental Improving the operation of boilers has reduced
There is an overspend against this heading due gas costs through the year. Lower unit rates for
to learning and development training that was gas have also contributed to savings.
required for new staff. Following the annual
asbestos inspection, works were required to
Fuel Oil (Heating)
be carried out to the woven rope packer in the
16 Palace Street
Water
Water costs throughout the year were lower
than forecast due to lower consumption in
the building.
£914,746 £549,002
of Variances
Budget (£) Budget (£)
£950,433 £591,714
Actual (£) Actual (£)
£35,687
Variance (£)
£42,712
Variance (£) Summary
Security Mechanical & Electrical Service
There is an overspend on this line due to the This year saw an increase in reactive works that
introduction of additional out of hours security in were business critical, such as the replacement of
2015/16 to ensure 3 officers on shift at all times, gas regulation valves; cleaning and chlorination of the
providing much greater security and continuity of cold-water systems; replacement of the Simmtronic
service to the building. This change was introduced lighting control head end due to age and the
after forecasting of the 2016/17 budget was completed. replacement of the AHU 5 fan/motor.
Operations Manager
Landsec
16 Palace Street, London SW1E 5JD
D/L: +44 (0) 207 932 2598
Mobile: +44 (0) 759 520 6569
hiren.patel@landsec.com
landsec.com
David Payne
General Manager
Landsec
100 Victoria Street, London SW1E 5JL
D/L: +44 (0) 207 024 3837
Mobile: +44 (0) 759 044 4048
david.payne@landsec.com
landsec.com
Ann-Marie Khan
Operations Director
Landsec
100 Victoria Street, London SW1E 5JL
D/L: +44 (0) 207 002 8971
Mobile: +44 (0) 7710 307 920
ann-marie.khan@landsec.com
landsec.com
landsec.com