Professional Documents
Culture Documents
1.General Details
a) Station :
(i) Name of the TMG
b) (ii) SW Version
(query_mml_verinfo) :
c) Email ID of the Exchange In charge :
d) Designation of Inspecting Officer :
e) Date of last inspection :
f) Date of compliance on previous
inspection report :
2. Exchange Equipment
a) (i) Date of Commissioning
(ii) Equipped capacity of the TMG :
b) Total Working Streams : E1: STMs:
c) Percentage Loading :
d) Check Redundancy
(i) MAUIM/MSUIM :
(ii) MDTB/SDTB/SDTB2 :
(iii) Network Cards-VTCA (More than 1)
(iv)Synchronisation status
:
(v)Working of Both SMPS of Router :
(vi) Working of TMG 129 Server :
(Background Server) :
(vii) Check the TMG status whether in :
Manual or Auto mode :
(viii) Working of AV Alarm Panel
BNG+BNG:
Physical Connectivity to MPLS Net Work :
e)
BNG+PE:
PE+PE:
:
f)
Physical verification of link status in Router
h) :
(i)Availability of Mtce Documents
(ii) Availability of CDs (SQL,WIN2003 :
Server Edition)
i)
(i) Back Up (Weekly) :
(ii) Maintenance routines (Daily Alarms) :
(iii) PM by AMC Vendor (Every 6 Months) :
:
t) Temperature/Humidity
Total ports
5. EARTH
a) Earth value :
b) Date of last check :
c) Layout diagram :
d) Type of earth :
e) Has the earth resistance measured once in six :
months?
f) Whether common equipotential earth is :
provided?
g) Measurement of Tower Earth :
7. POWER PLANT
a) Type :
b) Make :
c) Date of installation :
d) Configuration :
e) Working condition of Power modules :
f) Availability of Stage 1 (Lightening Arrester) :
g) Availability of Stage 2(Surge suppressor) :
h) Peak Load :
Is the power plant sufficient to take up the :
i) load?
j) Take sample check of alarms :
k) Maintenance of History sheet. :
l) Availability of Sufficient of spare fuses :
8. BATTERY
a) Make :
b) Type :
c) Capacity :
d) Quantity :
e) Date of commissioning :
General cleanliness of the battery & power
f) plant room. :
g) i) Are there frequent power failures :
ii)Is the battery able to take up the load during
the prolonged power failure?
h) Condition of the battery leads & fuses etc., :
i) Are there any sick cells? :
j) Whether readings are taken when exchange
load is on battery ? :
k) Are battery registers maintained properly? :
l) Are there any stores lying in the battery room? :
m) Check when the battery was last discharged :
and its efficiency
n) As emergency power supply from battery for :
lighting been provided in case of main supply
failure.
o) Is exhaust fan provided in the battery room and :
working properly?
p) Temperature compensation extended or not? :
9. ENGINE ALTERNATOR
a) Capacity :
b) Make :
c) Date of Installation :
d) RPM, Frequency, Ammeter & Voltmeter :
Is capacity sufficient to take Peak load & Load
e) of AC blower motors? :
f) Adequacy of diesel & arrangement for storage :
whether sufficient or not?
g) Are all maintenance schedule are carried out? :
h) Condition of startup battery :
i) Diesel consumption data availability :
j) Engine earthing :
k) Condition of radiator. :
l) Working condition of Engine Alternator :
12. CONCLUSION