Professional Documents
Culture Documents
Need to raise SR with orace..giving port and sftp server details host details (server name/address)or ip
address
If you use Update 19B, port 22 opening request is no longer required. Instead, Oracle BI is now using
a proxy servers to channel the traffic from BI to the external sFTP servers making the setup of SFTP
connectivity a self-service option for our customers. This new feature will eliminate the need for
opening ports for SFTP connectivity, both for standard and non-standard ports. This enhancement
should also eliminate the need for logging SRs related to requests for SFTP port opening.
If the BIP report is ready for use and burst the output file then go to the report path, click on More
Go to permissions: Roles needed: BI admin role, BI Author role and BI consumer role
Go to schedule: It will open the report, under general tab it will show report path and parameters
defined.
Choose layout(layout name) and format (pdf,wrd etc)in which the report needs to be delivered.
Click on add Destination..it will list all theservers added as part of FTP setup(under administration->BI
Publisher->Delivery->FTP)
Choose frequency: Weekly/Daily/Monthly(which month to schedule. IF whole year then choose all
months). You can also chose time zone
And you can give the start and end date like for 10 to 20 year or so.
Next go to NOTIFICATION tab:
Choose email and provide email address. Also ther are opton like when to mail. Like send when report
completed or ended in warning or error or failed
Go to DIAGNOSTICS Tab:
Choose option ‘Enable consolidated Job Diagnostics’..this will generate log if the report ends in error or
so
Clik on ok
Data Exchange-> Manage HCM data exract definition->Extract delivery type->setup SFTP details
Once that is done..