CATEGORY FOR APQP E Process Sequence / Layout change LEGEND
A New Product / Part F Process Equipment change u Activity to be done B Design Change G Relocation of Plant Blank Activity not required C Material Change H Supplier change v Prime Resp. Deptt. D Process Parameter Change (Temperature/Cycle time/Coolng time etc.) I Operator Change m Supporting Deptt. CATEGORY Responsible Department Reference S.No. Description A B C D E F G H I MKT ENG DEV QA PRO PUR Standards 1 Receipt of Enquiry along with Specification/Drawing/Reference sample etc. u u u v 2 Pre Feasibility Study u u u u u u u u v m 3 Clarification from customer for incomplete information u u u v m m 4 Technical Feasibility u u u u v m 5 Cost Estimation u u u u v 6 Receipt of LOI from customer u u u u v m 7 Preparation of Project Development Team u u u u v 8 Preparation of Timing Chart u u u u m v m 9 Process Flow Chart u u u u v m m 10 Bill of Material (BOM) u u u u v 11 Passed History Study u u v 12 Component Drawing u u u u v m 13 Drawing Review u u u m v m 14 Review of Process Flow Chart u u v m 15 Listing of Special Characteristics u u m v m 16 Evaluation of Regulatory/Statutory requirement, Environment Health & Safety u u v m m 17 Process FMEA u u u m m v m 18 Productivity Goal u u m v m 19 Quality Goal u u u v m m 20 Control Plan (Prototype) u u u v m 21 Tool Design / Drawings u u v m m m 22 Tool Manufacturing u u u u m v m m m 23 Gauge / Equipment Testing u u u m v m m 24 Sourcing of Raw material / BOPs u u u u m m v 25 Sample Trial Run u u u u m v m m 26 Follow-up results during product development u u u m v m 27 Review with customer u u u u v 28 Layout Plan u u m v m 29 Component Procurement u u u m m m v 30 Ppk Study Plan u u m v 31 Operator Process Instruction u u u u u u u u u m v m m 32 Logistic Study u v m m m 33 Packing Specification u u v m m m m 34 Pre Launch Control Plan u u u u m m v 35 MSA Plan u m v m 36 Production Trial Run (Pilot Lot) u u u u m v m m 37 Process / Product validation u u u u m v m 38 Process Capability Evaluation u u u u m m v m 39 MSA Study u v m m 40 PPAP u u u u v m 41 Customer Approval u u u u v 42 Feedback Analysis / Corrective Action u u u u m v m m m 43 Production Control Plan u u u u m v 44 Production Source Approval u u u u 45 PQP Summary and Sign off u u u u m m v m 46 Mass Production Plan u u u u m m m v Rev No. Description Date Signature Prepared by Verified by Approved by