Professional Documents
Culture Documents
4000000008(MATNR),plant dr01(WERKS)
1.collect the (AUFM-aufnr) and pss it AFPO table.collect VERID
here you can get klin wise separation.
VERID 001-klin1
VERID 002-klin2
2.now the klin wise AUFNR pass in AUFM table with 261 &262 movement type(bwart)
*collect material,aufnr,matarial description,quantity,total cost acording the excel
sheet,show in output
3.now the klin wise AUFNR pass in AUFM table with 101 &102 movement type(bwart)
*collect material,aufnr,matarial description,quantity,total cost acording the excel
sheet,show in output overall cost
4.power cost see the zbillet_cost report,cost element will bel 800005,plant will be
dr01.acdoca table