Professional Documents
Culture Documents
because with a
barcode is reliable and cost-effective. Barcodes can adjust to company regulations and ensure
the accuracy of data availability. besides Barcodes and their scanners help companies calculate
and track assets faster and more accurately and minimize human error.
2.
Personil team
Salary : a man 1.500.000/day
project carried out for 9 months, 1 month (22 days)
22x 21.000.000= 462.000.000/ month
Woker Amount Cost
Project manager 2 3.000.000
System and analysis and 3 4.500.000
design
Programmer 2 3.000.000
Network Designer 2 3.000.000
Technician 1 1.500.000
Database Administration 3 4.500.000
Software Tester 1 1.500.000
Total cost per day 21.000.000
Other costs
no the goods cost
1 Cabel 10.000.000
2 Computer 58.000.000
3 Computer desk 20.000.000
4 Electric socket 2.000.000
5 Comsumtion 10.000.000
Total 110.000.000
3. The jobs
Woker Jobs
Project manager the person responsible for
leading a project from its
inception to execution. This
includes planning, execution
and managing the people,
resources and scope of the
project.
System and analysis and a person who uses analysis
design and design techniques to solve
business problems using
information
technology. Systems
analysts may serve as change
agents who identify the
organizational improvements
needed, design systems to
implement those changes, and
train and motivate others to
use the systems.
Programmer esigning and creating software
programs, integrating systems
and software, training end-
users, analyzing algorithms,
modifying source-code, writing
system instructions,
debugging, and maintaining
operating systems.
Network Designer -Determine an
organization's network an
d computer system needs
before setting one up.
-Install
all network hardware and
software and make
needed upgrades and
repairs.
-Maintain network and
computer system security
and ensure that all
systems are operating
correctl
4. Pennt chart
PERT Chart
Discovery Analysis
(1 MONTH) (1
MONTH)
Coding
Design
(3 month)
(2 month)
Development Debugging
(1 month) (1 month)
Operation &
Maintenance
Gant chart
Debugging
Development
Coding
finish
Design start
Analysis
Discovery