You are on page 1of 3
BQGENSETOANPANEL 4x25 NO. KETERANGAN. ay SAT HARGASAT| TOTAL ‘A [BAIA struktur 1)Kolom Kanal CNP 100 3,2mm double 72,00] m 350.000] _25.200.000 2{Balok Kanal CNP 100 3,2mm 84,00] m 175,000 | _14.700.000 3/Baja ringan 100,00] btg 127.500] 12.750.000 4]Plat 8mm 0,20] tbr 3.000.000 600.000 5/Angkur 016 24,00] buah 45,000 1.080.000 6|cat besi 975,00] ke 2.500 2.437.500 56.767.500 8 [DINDING Hebel 9 cm expose 72,00 | ma 275.000} 19.800.000 Ram kawat 24,00 ma 125.000 3.000.000 Pintu besi 3,00] buah '850.000 2.550.000 Pintu Sliding door 3x2,3m2 1,00| bh 9.500.000 9.500.000 34.850.000 [PONDASI [Cakar ayam 60x60x 20 crn bh 175,000 2.100.000 |sloof besi 15x20 cm m 145,000 | _10.730.000 Pondasi mesin & Tangki m 350.000 6.300.000 [Bekisting m2 160.000 9.472.000 [Cor beton K125 m3 975.000 1.462.500 [Lantai 10 cm K125 m3 975.000 9.750.000 lUrugan m3 90.000 3.600.000 |Saluran kabel m 135.000 2.025.000 : 5.439.500 [ATAP é [Atap Spandek 125,00| m2 95.000 | __11.875.000 |Talang dan dudukan talang 25,00| im 375.000 9.375.000 ipa pembuangan 3" ae cert “m 95.000 3.420.000 futup Flashing pinggir ruang panel Fon 95.000 475.000 5|Tutup flashing atap m 95,000 2.375.000 i 6|Plafond ruang Panel | 40,00] m2 120.000 4.800.000 i 32.320.000 me 500] tae 250,000 1.250.000 5,00 | _titk 375.000 1.875.000 f 3,00| _ tk 35,000 105.000 4,00 | bh 1.750.000 7.000.000 0.230.000 GRAND TOTAL 179.607.000 Re. r,l¢2, B22/, 2 pee a fr FIBER GLASS FULL BELAKANG 4 =H ‘Atop al Bo gan AP AES ae #1 150x15007110 Per Jak Su Boiaust KI GENSE®:... t t Cl {sco PINTU AKSES MASUK LUAR SUDING DOOR = te0c0 en ' 2000 1 CORRUGATED Atop WALL Bojo Rigor . re CLADDING TRAY 10emX40em_ Exnaust SS { Elev. Sioof Workshop Pi a PINTU AKSES OT. ACA pny AS WORKSHOP EFF vualHvrgs BNWAWN VAVE “Ld ston spon S| eta NT 8 aSH H¥Nad \- NIWA dOHS 4g moves 3 prosddy rived 1301 HyNag \ - / Libhbl ll ube!

You might also like