Engineers Committee Exam 2013-2014 Rida Ali's Exam (1) CPM used to ® A 2000. |B. Calculate longest duration. C. xox D._ »o0xx wu (2) WBS — OBS relationship? wee The OBS displays organizational relationships and then uses them for assigning work to resources in a project. Like its originator, the OBS allows complex projects to be broken down, providing a more organized representation of the work to be completed. While the WBS is used to define the project during early stages of its cycle, the OBS provides an organizational structure for the project as it moves to completion. The erarchical nature of the Organizational Breakdown Structure allows for the appropriate resources and responsibilities to be assigned. (3) Ifa project has CPI value of 0.91 and SPI value of 1.01, what doe: It means that project is ahead on schedule (time wise), but is losing (Cost wise) (4) ABET A. Engineering Programming B._Engineering Exam ) Ifa contractor failed in delivering the project, what will be the Consequences? Liquidating of the performance bond. (6) In pert analysis, Activity is represented by: Arrow Line Node Xvox goe> Prepared by Yasser Al Wahid Page 1 of 2 [[ = tntincers Committee Exam 2013 — 2014 Rida Ali's Exam, (7) Concrete durability depends on | related to) and and Preoared by Yasser Al Wahidi Page 2 of 2

You might also like