Instructions: Candidates should read carefully the instructions printed on the question paper and
on the cover of the Answer Book, which is provided for their use
N
1. Answer any Five out of Six Questions
2. Use of Calculator is permitted
3. All Questions carry equal (ten) marks
4, Answer to each question to be started on a fresh page
5, Assume data where ever necessary and state them clearly
Question 1
Rich Cole Control Devices, Inc., produces custom-built relay devices for auto makers. The most
recent project undertaken by Cole requires 14 different activities. Cole’s managers would like to
determine the total project completion time (in days) and those activities that lie along the critical
path. The appropriate data are shown in the following table:
“Activity Optimistic Most Likely
ae [Time [Time
ae 4 [oe
8 a 2
c fa is —i6é
ofA {se
E B,C 1 9
[Eo 2 3 -
Ie D {a ak
i EF fa 4
ee [a 6
yt 2 [s
K 1 8 9
L J om 4
a a fa 2 mE
N [uM 6 8 (fom
a. Whatis the probability of being done in 53 days?
b. What date results in a 99% probability of completion?
— —_ Page gpQuestion 2a
The JIT philosophy carries with it an objective of continuous improvement (Kaizen). Explain this
central theme with a problem solving example
Question 2b
“Waste elimination is one of the most effective ways to increase the profitability of any business”
Explain how eliminating waste can free up resources and enhance production?
Question 3a
What are the reasons of holding Inventories? What are the costs associated with inventories &
their significance?
Question 3b
A quantity discount of 10% in existing unit price is offered, provided order cum supply quantity is
at least 500 units. The following information is given:
a) Annual demand = 1000 numbers
b) Procurement Cost per order = Rs 100
) Inventory carrying cost per annum = 22% of the acquisition cost
d) Existing unit price (acquisition Cost) Rs 10
‘What will be the annual saving (if any) if discount is availed of, instead of ordering out as per EOQ
based on the information above?
Question 4a
TQM is a philosophy that involves everyone in an organization in a continual effort to improve
quality & achieve customer satisfaction.” Explain the approach for TM implementation in an
Organization
Question 4b
‘The school board is trying to evaluate a new math program introduced to second-graders in five
‘elementary schools across the county this year. A sample of the student scores on standardized
math tests in each elementary school yielded the following data:
NO. OF TEST ERRORS.
te
Construct a c-chart for test errors, and set the control limits to contain 99.73% of the random
variation in test scores. What does the chart tell you? Has the new math program been effective?Question 5a
“Failure to match process capabilities with product or service requirements can result in
inefficiencies and higher cost, creating a competitive disadvantage’. Explain the Batch &
Continuous process types & summarize their comparison on the four key dimensions: job variety,
process flexibility, unit cost, and output volume,
Question 5b
"The need for layout planning arises both in the process of designing new facilities and in
redesigning existing facilities”. Explain the most common reasons for redesign of layouts
Question 6a
Six jobs are to be processed on 3 machines. The processing time (in days) for each job on each
machine is given, Find the sequence of job, which will take minimum time and calculate minimum
time. Indicate schedule on Gantt chart
fob Ae Ce Ore
Mic +
Question 6b
Booker's Book Bindery divides SKUs into three classes according to their dollar usage. Calculate
the usage values of the following SKUs and determine which is most likely to be classified as
Unit Value ($)
3.00
= | 0.02 |
0.75
I 40.00
B 0.03
6 3000_ 015
iz 450000 0.45eed
er
eae
Sted
Perr
ed
Pend
0 4a75olaea
‘reas under the Standard Normal
Probability Distribution Between the Mean
and Postve Values of 2
0.08 0.07
0.0279
0.0675
otoce
bias
0.1608
o2i57
6248
02704
03078
03340
0.4282
04525
baste
0.0160
262
0.498? 0.4969
Al