You are on page 1of 3
JICA Assisted Yamuna Action Plan Project (111) JICA Loan No, ID-P 215 NJS Consultants Co., Ltd. (Japan) In Consortium with Regd. Ofice ‘ABCOM India Pvt Ltd. 1-11, Shipaura,Chome Minato-ku, Tokyo-105-0028, ‘TTI Consulting Engineers India Pvt. Ltd. ssuwsns-consultantscomn, Tel, @1-3-6324-4344, Fax 81363244345 INJS Engineers India Pvt.Ltd. TRANSMITTAL SHEET TS Ref. No. PMC/Y AP-IIl/ DIB/K3/2020/481 ‘Date: 28" February” 2020 Project Name ‘Rehabilitation and Up-aradation of Kondli: Phase I (45.5 MLD), Phase II (113.7 MED) & Phase HII (45.5 MLD) Wastewater Treatment Plant (WWTP) with effluent standards of BOD -i0 mg/l, TSS~ 10 mgil or better under YAP (i) Executing Agency / Client | Dethi Jal Board, Delhi Contractor Mis Triveni Engineering & Industries Ltd.~ GS] Envo Ltd- M/s Gharpure Engineering & Construction Pvt. Ltd.JV) To, CC: Client Address ‘The Executive Engineer (C) DRIX ‘The Executive Engineer (SDW) IV Delhi Jal Board (Govt. of NCT of Delhi) | Dethi Jal Board (Govt. of NCT of Delhi) Jagriti Pump House, Near Karkardooma | Kondli STP, Near Mayur Vibar, Phase-IIl, Crossing, Shahdara, Delhi — 110 092 Delhi-110 096 E-mail: eecdr9ram@gmail.com E-mail: gesdw4.djb@nic.in Ref, Contractor Letter, No, | _3.1/PXD-1320/DIB-Kondli/STP/D&E/650- 17/02/2020 651-652 Ref, DIB Letter No. F-Q7)DIBIEE (C) DR-XI2019-204155, 2570272020) Sub Document Revision | Recommended Category Sub. Document Reference [1- PXD-1320-13-112-A (IDocument) o1 “er 2. PXD-1320-13-112-B (3 Sheets) oO “cr 3. PXD+1320-13-112-C (1 Sheet) a scr T. Design Calculation of Filter Feed Sump for Phase — I (10 MGD) Wastewater ‘Treatment Plant (PXD-1320-13-112-A) (Total 1 Document) 2. GA Drawing of Filter Feed Sump for Phase ~ I (10 MGD) Wastowater Treatment Plant (PXD-1320-13-112-B) (Total 3 Sheets) 3. Arch Drgs of Filter Feed Sump for Phase — I (10 MGD) Wastewater Treatment Plant (PXD-1320-13-112-C) (Total 1 Sheet) Document Subject/Title Document Reseiving Date — | 19702/2020 Review Date 25/02/2020, J Reviewed b Mr, Rajat Garg { > Enclosure: PMC Comments Sheet Atached @ Page) z “Approved by a Suraj Aggarwal Deputy Project N ‘Acknowledgement (Received the above) Note: Recommended category deseription Category Description A". Recommended for Approval =B°. | Recommended for Approval subject to incorporation of comments as marked =C*. ‘Returned with comments & resubmission required =D”. ‘Retained for Information onl Project Ofice: 404, 4 Floor, 12 Gagandeep Building Rajendra Place, New Dslhi~ 170008, CIN: F03629 Package-K3 1. Structural Design Calculations for Filter feed Sump for Phase-I (10 PXD-1320-13-112-A (Rev. - 1) MGD) Waste Water Treatment Plant 2. GA & Reinf Drawing of Filter feed Sump for Phase-I (10 MGD) Waste PXD-1320-13-112-B (Rev. 1) Water Treatment Plant (3 Sheets) 3. Arch Drawing of Filter feed Sump for Phase-I (10 MGD) Waste Water PXD-1320-13-112-C (Rev. 1) ‘Treatment Plant (1 Sheet) Comments Sheet (TS Ref No PMC/YAP-IIU/DJB/K3/2020/481) Sr. | PMC Observation Dated 29.11.2019 | Contractor’s Resolution for | PMC Observation Dated No. | (Rev. 0) PMC Observations Dated —_| 28.02.2020 (Rev. 1) 14.02.2020 (Rev. 0) Architectural Drawing - PXD-1320-13-112-C 1. | As per Page No 800 of CA, Cl 33] Noted. Toilet details and | Noted and provide details and give (xxxvi), All Control Room & Pump Houses shall be provided with toilet of minimum size of 3m x 2m accordingly modify the drawings along with design calculations. Hence same shall be incorporated in this Pump House as well, Please revise the drawing and design according! locations are to be furnished separately, reference of the drawing in this drawing, + Filter house footing is overlapping filter feed sump footing. Redesign the footing. + Effective length factor Ely and ELz shall be considered. + Subgrade modulus to be as per geo tech report. + In wall and footing design calculation, central moments are considered in the design, comer ‘moments (Mx and My) along with corresponding Mxy shall be considered in design. + On grid 34, cantilever portion of the bypass channel loads to be considered in design. 3. Tn architectural drawing, + Note no. 4 and 5 to be corrected. + In schedule of finishes, 6mm thick plaster on roof to be provided. + Provide stainless steel cat ladder to access the roof as per CA. + Provide ramp at rolling shutter location. + Provide notes relevant to this building only. 4 Tn civil/reinf. drawing notes, + Add Note “All Civil GA Drawings shall be as per approved Mechanical Drawing and it shall be confirmed at site before start of Page 1 of 2 Sr. | PMC Observation Dated 29.11.2019 | Contractor’s Resolution for No. | (Rey. 0) PMC Observations Dated 14.02.2020 (Rev. 0) PMC Observation Dated 28.02.2020 (Rev. 1) work. If there is any discrepancy between these drawings then it shall be informed to Engineer in Charge. + Base slab cover to be updated to 50mm for both i. top and bottom and in contact with water + Remove note no. 10-13. Provide notes as per CA. + Make all the changes as per design calculations in drawings. Note: All design and drawings and construction shail be in full compliance with the requirement of contract specifications including addendum and corrigendum. ‘Recommendation: Category “C”: Returned with Comments & resubmission Required. Rayo GG (Rajat Garg) Page 2 of 2

You might also like