You are on page 1of 7

Risk Assessment

METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.

RAISED FLOOR EKFC EXPO CENTRAL KITCHEN DJ-274-P-QC--MST-


00 04/03/2020 DJ-274-P-HSE-RA-0031
INSTALLATION DUBAI SOUTH, PLOT No. TP-238 0031
Current Risk Respo Final Risk
Who might be Responsible
Task (Steps) Potential Hazard Existing Control Additional Control nsible
affected person Con Prob Risk Cons Prob Risk
person

Preparation of Personnel Injury due to All those HSE induction needs to be HSE
works lacking of site awareness involved in task attended by all the new Safety briefing or Tool
workers and staff involved Task Foreman 3 2 6 box talk is required on a General 4 1 4
in the project works. daily basis prior to work Foreman
Time Keeper and must be recorded
and submitted to safety Task
department for Foreman
reference.

Verify compliance with HSE In


all HSE aspects of the charge
works and report
accordingly

Implement and comply


with all safety
procedures, safety
measures related to the
nature of works that are
being carried out in
accordance to HSE Plan.

Client instructions
should be followed
accordingly if any

Page 1 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.

RAISED FLOOR EKFC EXPO CENTRAL KITCHEN DJ-274-P-QC--MST-


00 04/03/2020 DJ-274-P-HSE-RA-0031
INSTALLATION DUBAI SOUTH, PLOT No. TP-238 0031
Current Risk Respo Final Risk
Who might be Responsible
Task (Steps) Potential Hazard Existing Control Additional Control nsible
affected person Con Prob Risk Cons Prob Risk
person

Transporting of  Crush Injuries, Workers Closed monitoring by Operator and Machine shall
Materials by  Operator Foremen assigned foreman. Project manger be 3rd party certified and Machine
machines to work incompetency, Engineers 2 2 4 Operators 4 1 4
operator should possessed
location. Visitors Construction
valid UAE driving license Workers
 Mechanical failure others Manager
to operate the vehicle.
Valid permit to work system HSE
 Collision with the fixed Site Engineer Site speed limits shall be
prior to work.
objects, abided by the plant Site
Task Foreman operator. Engineers
 Collision with the Plant to be checked with
moving objects Task
the approved daily Foreman
Induction and working at
inspection checklist and
height training for the
employees involved. deficiencies notified.
Flag man shall be assigned
with the machine to guide
the plant operator.
Tool Box talks with the Overcrowding in the area
involved workers. in the vicinity to be
avoided.
Area to be checked for any
trips and falls hazards.

Page 2 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.

RAISED FLOOR EKFC EXPO CENTRAL KITCHEN DJ-274-P-QC--MST-


00 04/03/2020 DJ-274-P-HSE-RA-0031
INSTALLATION DUBAI SOUTH, PLOT No. TP-238 0031
Current Risk Respo Final Risk
Who might be Responsible
Task (Steps) Potential Hazard Existing Control Additional Control nsible
affected person Con Prob Risk Cons Prob Risk
person

Manual Handling  Back injuries All those involved Supervision for the work. Lifting techniques should
of Materials in the task. PM be adopted to keep the back
 Muscular problems, 3 3 9 straight and knee bend with Site Engineer 3 2 6
Permit to work system in CM
place. a firm grip to load for
 Cuts, Task
Site Engineer lifting, all respective PPEs Foreman
should be worn by the
 Slips and Trips
Task Foreman workers to prevent body Safety in
injuries. charge
 Ergonomics Manual handling training Safety in charge Job rotation to the workers
to prevent dehydration
risks.
 Sprains and strains Area shall be inspected by
any slips and trips hazards.
Provision of cool drinking Cool drinking water
 Dehydration water in work area. provision shall be made
sure in the vicinity of work
area.
Appropriate and adequate
PPEs shall be provided and
Job Specific PPEs.
worn by all the workers for
the work.

Tool box talks the workers


prior the task.

Page 3 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.

RAISED FLOOR EKFC EXPO CENTRAL KITCHEN DJ-274-P-QC--MST-


00 04/03/2020 DJ-274-P-HSE-RA-0031
INSTALLATION DUBAI SOUTH, PLOT No. TP-238 0031
Current Risk Respo Final Risk
Who might be Responsible
Task (Steps) Potential Hazard Existing Control Additional Control nsible
affected person Con Prob Risk Cons Prob Risk
person

INSTALLATION  Eye injuries All those involved Hand Protection. No one shall be allowed to
OF PEDESTAL &  Electric shock Electric in the task. PM 4 4 16 worn loose clothes which Task 4 1 4
RAISED FLOOR  shock CM could cause entanglement Foreman
PANELS MSDS. HSE
 Noise with the rotating machine Site Engineer
Foreman HSE
 Fire Site Engineer parts. Workers
Tool Box Talks.
Mixer machine shall be
Permit to work System. properly earthed and
connections shall come
Ear plugs. through ELCB to prevent
electric shock.

Fire extinguisher availability For noise protection ear


at the work place. plugs shall be worn by all
the employees working in
high noise area.

Supervision for the task to


be ensured to identify
hazards and take immediate
corrective action for
rectifications.

Page 4 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.

RAISED FLOOR EKFC EXPO CENTRAL KITCHEN DJ-274-P-QC--MST-


00 04/03/2020 DJ-274-P-HSE-RA-0031
INSTALLATION DUBAI SOUTH, PLOT No. TP-238 0031
Current Risk Respo Final Risk
Who might be Responsible
Task (Steps) Potential Hazard Existing Control Additional Control nsible
affected person Con Prob Risk Cons Prob Risk
person

CUTTING AND  Entanglement with All those who are Job rotation and competent Appropriate PPEs like
INSTALLATION machine parts. involved in the task. supervision to be provided. 3 3 9 Hand Gloves, Eye 3 1 3
OF CUT PCS  Falling objects, protection shall be
 Dust inhalation Permit to work system.
provided to the employees
 Cuts and abrasions,
 Defective hand tools, Provision of cool drinking for personnel protection.
water.
Right tools for the right job
shall be used.

All tools and equipment


shall be color coded by
competent person.

The area to be kept clean


and tidy to prevent any
Slips, Trips and falls.

Page 5 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.

RAISED FLOOR EKFC EXPO CENTRAL KITCHEN DJ-274-P-QC--MST-


00 04/03/2020 DJ-274-P-HSE-RA-0031
INSTALLATION DUBAI SOUTH, PLOT No. TP-238 0031
Current Risk Respo Final Risk
Who might be Responsible
Task (Steps) Potential Hazard Existing Control Additional Control nsible
affected person Con Prob Risk Cons Prob Risk
person

Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
Financial A B C D E
No Safety Health Environ. No Frequency R=CxP
Equip. Product. 1 2 3 4 5
Practically impossible or Once in 10
1 First Aid Immediate Minor <AED 1k <1 hrs. A (1) 5 5 10 15 20 25
years
2 Medical Temporary Short term <AED50K 1-2 hrs. B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs. C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs. D (4) Has happened or Weekly 2 2 4 6 8 10
Catastrophi
5 Fatality Fatal >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5
c

RISK ASSESSMENT ORIENTATION ATTENDEES


Name Date Designation Comments Signature
1
2
3
4
RISK ASSESSORS

Name Date Designation Comments Signature

Page 6 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.

RAISED FLOOR EKFC EXPO CENTRAL KITCHEN DJ-274-P-QC--MST-


00 04/03/2020 DJ-274-P-HSE-RA-0031
INSTALLATION DUBAI SOUTH, PLOT No. TP-238 0031

Current Risk Respo Final Risk


Who might be Responsible
Task (Steps) Potential Hazard Existing Control Additional Control nsible
affected person Con Prob Risk Cons Prob Risk
person

RISK ASSESSMENT FINAL APPROVAL


RISK ASSESSORS CONSTRUCTION MANAGER PROJECT MANAGER CONSULTANT

Date: Date: Date:

Page 7 of 7

You might also like