METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.
Preparation of Personnel Injury due to All those HSE induction needs to be HSE
works lacking of site awareness involved in task attended by all the new Safety briefing or Tool
workers and staff involved Task Foreman 3 2 6 box talk is required on a General 4 1 4
in the project works. daily basis prior to work Foreman
Time Keeper and must be recorded
and submitted to safety Task
department for Foreman
reference.
Client instructions
should be followed
accordingly if any
Page 1 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.
Transporting of Crush Injuries, Workers Closed monitoring by Operator and Machine shall
Materials by Operator Foremen assigned foreman. Project manger be 3rd party certified and Machine
machines to work incompetency, Engineers 2 2 4 Operators 4 1 4
operator should possessed
location. Visitors Construction
valid UAE driving license Workers
Mechanical failure others Manager
to operate the vehicle.
Valid permit to work system HSE
Collision with the fixed Site Engineer Site speed limits shall be
prior to work.
objects, abided by the plant Site
Task Foreman operator. Engineers
Collision with the Plant to be checked with
moving objects Task
the approved daily Foreman
Induction and working at
inspection checklist and
height training for the
employees involved. deficiencies notified.
Flag man shall be assigned
with the machine to guide
the plant operator.
Tool Box talks with the Overcrowding in the area
involved workers. in the vicinity to be
avoided.
Area to be checked for any
trips and falls hazards.
Page 2 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.
Manual Handling Back injuries All those involved Supervision for the work. Lifting techniques should
of Materials in the task. PM be adopted to keep the back
Muscular problems, 3 3 9 straight and knee bend with Site Engineer 3 2 6
Permit to work system in CM
place. a firm grip to load for
Cuts, Task
Site Engineer lifting, all respective PPEs Foreman
should be worn by the
Slips and Trips
Task Foreman workers to prevent body Safety in
injuries. charge
Ergonomics Manual handling training Safety in charge Job rotation to the workers
to prevent dehydration
risks.
Sprains and strains Area shall be inspected by
any slips and trips hazards.
Provision of cool drinking Cool drinking water
Dehydration water in work area. provision shall be made
sure in the vicinity of work
area.
Appropriate and adequate
PPEs shall be provided and
Job Specific PPEs.
worn by all the workers for
the work.
Page 3 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.
INSTALLATION Eye injuries All those involved Hand Protection. No one shall be allowed to
OF PEDESTAL & Electric shock Electric in the task. PM 4 4 16 worn loose clothes which Task 4 1 4
RAISED FLOOR shock CM could cause entanglement Foreman
PANELS MSDS. HSE
Noise with the rotating machine Site Engineer
Foreman HSE
Fire Site Engineer parts. Workers
Tool Box Talks.
Mixer machine shall be
Permit to work System. properly earthed and
connections shall come
Ear plugs. through ELCB to prevent
electric shock.
Page 4 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.
CUTTING AND Entanglement with All those who are Job rotation and competent Appropriate PPEs like
INSTALLATION machine parts. involved in the task. supervision to be provided. 3 3 9 Hand Gloves, Eye 3 1 3
OF CUT PCS Falling objects, protection shall be
Dust inhalation Permit to work system.
provided to the employees
Cuts and abrasions,
Defective hand tools, Provision of cool drinking for personnel protection.
water.
Right tools for the right job
shall be used.
Page 5 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
Financial A B C D E
No Safety Health Environ. No Frequency R=CxP
Equip. Product. 1 2 3 4 5
Practically impossible or Once in 10
1 First Aid Immediate Minor <AED 1k <1 hrs. A (1) 5 5 10 15 20 25
years
2 Medical Temporary Short term <AED50K 1-2 hrs. B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs. C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs. D (4) Has happened or Weekly 2 2 4 6 8 10
Catastrophi
5 Fatality Fatal >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5
c
Page 6 of 7
Risk Assessment
METHOD STATEMENT
Rev. DATE SUBJECT / ACTIVITY PROJECT NAME / ID RA Ref
Ref.
Page 7 of 7