Professional Documents
Culture Documents
AAC Block Info PDF
AAC Block Info PDF
AAC
KEDA block
INTERNATIONAL COMMERCE CENTRE / Products / AAC PLANT / AAC block plant
300,000
/ AAC block plant / AAC block plant
China national standard(GB)
300 days / year
22.5 hours / day
AAC7.5block
hours plant
/ shift
173200
Share to:
42100
The7500
AAC production process includes raw material preparation, batching and mixing, pouring, pre-
24800
curing, cutting, autoclaving, and packing.
The≈1000
entire line allows process to flow smoothly, from start to finish. The independent circulating
line≈500
of mould, side plate and autoclaving car can lead the object to the original location and get
ready for the next work cycle. The production line can achieve the real total automatic production
≈150600
without waste.
≈60000
Making full use of the land with the advanced overhead conveying system, special overhead cross
6
moving system and hydraulic control system for de-moulding machine, semi-product stacking
10
machine, separator and clamping machine, the investment of simple workshop structure can be
≈50
reduced.
≈10000
With decades of experience in serving the AAC blocks production machinery industry, we can
≈13500
supply customers with quality AAC block production lines with capacity ranging from 150,000m3
to 40,000m3 per year. Index value
AAC block
400,000
Inquire
China national standard(GB)
300 days / year
22.5
Brand: hours / day
KEDA
7.5 hours / shift
GENERAL INTRODUCTION
129900
PLANT PARAMETERS
31600
5600
AAC BLOCK PRODUCTION PROCESS
18600
RAW MATERIAL REQUIREMENT
≈1000
Contact Us Now
www.sinokeda.com/aac-block-plant.html 1/6
12/27/2019 AAC block plant - "Autoclave Aerated Concrete AAC Production Line, AAC block plant, block making machine Product on KEDA Interna…
≈460
AAC FINAL PRODUCTS
≈113500
≈45000
No. Index content unit Index value
6 AAC block
Name
10
Production scale(annual capacity) m³ 150,000
I≈45
≈9200
China national
Specification(cake: 4.2×1.2×0.6)
≈10000 m
standard(GB)
sumption 1. sand Ton / year 65000 2.lime Ton / year 15800 3. gypsum Ton / year 2800 4.cement Ton
boiler gas distribution ) 10 IX Total plant construction area hectare ≈30300 days / year area m2 ≈7000
Construction
Working system(three-shift continuous
I MainII raw material consumption 1. sand Ton / year 86600 2.lime Ton /22.5 yearhours
21100/ day
3. gypsum Ton /
weekly production)
l (including forklift and boiler gas distribution ) 10 IX Total plant construction area
7.5 hours acre ≈7.5
/ shift
22.5 hours / day 7.5 hours / shift III Main raw material consumption 1. sand Ton / year 108300
ators peopleMain
6 Single-shift
raw materialauxiliary personnel (including forklift and boiler gas distribution ) 10 IX
consumption
ntinuous weekly production ) 300 days / year 22.5 hours / day 7.5 hours / shift III Main raw
mption Ton 1.≈60000 Ton / year
sand VIII Single-shift producing operators people 6 Single-shift
65000 auxiliary personnel
tional standard(GB) II Working system ( three-shift continuous weekly production ) 300 days /
III Ton / year
2.lime Ton ≈113500 VII Annual gas consumption 15800
ater consumption Ton ≈45000 VIII Single-shift
3. gypsum Ton / year 2800
www.sinokeda.com/aac-block-plant.html 2/6
12/27/2019 AAC block plant - "Autoclave Aerated Concrete AAC Production Line, AAC block plant, block making machine Product on KEDA Interna…
www.sinokeda.com/aac-block-plant.html 3/6
12/27/2019 AAC block plant - "Autoclave Aerated Concrete AAC Production Line, AAC block plant, block making machine Product on KEDA Interna…
Click here
Contact Us Now
www.sinokeda.com/aac-block-plant.html 5/6
12/27/2019 AAC block plant - "Autoclave Aerated Concrete AAC Production Line, AAC block plant, block making machine Product on KEDA Interna…
Why KEDA
Products
Contact us
Contact Us
+86-555-2113600
+86-186-5559-0067
marketing_ea@keda-suremaker.com
Home
News
Contact Us
Contact Us Now
www.sinokeda.com/aac-block-plant.html 6/6