You are on page 1of 1

Proposed Piping Configuration (Removal

of piping leg) with liquid dumping

67-4
Q-110-5-2-3-4 Temperature 119.9 F 80-4
Temperature 120.4 F 66-6-3 66-7-3-3
Pressure 710.2 psig Bhit Plant-3
Pressure 710.2 psig Temperature 120.6 F Temperature 120.6 F Temperature 126.8 F
4
Pressure 708.0 psig Pressure 708.0 psig Pressure 615.5 psig
PIPE-100-7 PIPE-100-2-4
4-4-2-5-2-2-4 PIPE-100-3-4 PIPE-100-4-4 PIPE-100-5-5 PIPE-100-5-4-3
VLV-100-5-2-3-4 B--02-5-2-3-4 16-5-2-3-4 10 in. Badhra 02 to Bhit Plant-5
E-101-5-2-3-4 14-5-2-3-4 66-9
FE-101-3
67-4 66-4-3
80-4 66-5-3 66-6-3 66-7-4 66-7-3-3 PIPESYS
MIX-100-5-2-3-4 Q-103-6-4 Bhit Plant-3
MIX-124-4
Q-103-2-5 Q-103-4-4 Q-103-6-3-3
3-5-2-3-4 14-5-2-3-4 Q-103-8 Q-103-5-3
2-2-4 66-9 66-7-4 Q-115-4
Temperature 120.0 F 66-5-3
Temperature 120.0 F Temperature 120.6 F
Q-102-5-2-3-4 Pressure 713.0 psig Temperature 120.6 F
Pressure 712.7 psig Pressure 708.0 psig
K-100-5-2-3-4 S Pressure 708.1 psig
SET-20-4

90-4-2-3-4
122-5

2-3-4 Temperature 124.4 F

TEE-107-4-2-3-4 Pressure 710.2 psig


Phase Actual Liquid Flow (Aqueous Phase) 431.3 barrel/day
P-102-5 122-5
89-4-2-3-4

Q-128-3

Fri Apr 03 14:03:23 2020 Case: C:\USERS\SOHAIB\DESKTOP\BADHRA NETWORK UPDATED (120F).HSC Flowsheet: Case (Main)

You might also like