You are on page 1of 50

LITHELYARCH® Technology

An Infrastructure Technology Company

LITHELYARCH®Bridge Project

W: https://modernarchinfra.com
E: anujpuri@modernarchinfra.com | contact@modernarchinfra.com
M: +91 99309 79393
T: +91 712 228 2491 | +91 712 228 2492
Major Bridge Piers
Pre-cast Socket to Rest Arch Strips
Socket Placed on Piers
Steel Mould for Casting of Blocks
Concrete Blocks in Line and Level
Ready for Screed Concrete
Wire rope for Joining of Blocks, only for Lifting
Purpose…
Arch Strips Ready for Lifting After 60 mm
Screed Concrete
Half Lift
Arch Strips Arrived on Site
Full Lift
5-Point Lifting
5-Point Lifting
5-Point Lifting of Semi-circular Arch
Arch Placed on Socket, Self Stabilized,
No Requirement of Temporary Supports…
Minor Bridge, 2 Span Elevated
Placing of Arches for Major Bridge, 1m Wide Each Strip.
Brick Work as a Spandrel Wall
Any Well Compacted Filling Material like Soil,
Murum, GSB, Plum Concrete, FLYASH can be
used…
Plum Concrete for Backfill
(Concrete & Rubble)
Basic Structure Finished…
Four Span Arch Bridge in Koregaon Pune PWD

Fast Construction.
Three Span Arch Bridge in Panchgani Pune PWD

No Steel, No Maintenance…
Two Span Arch Bridge in Koregaon Pune PWD

Cost Effective than Traditional Slab Bridge.


Single Span Arch Bridge on Irrigation Canal Amravati PWD
Proof Load Testing by VNIT (National
Institute of Technology) for PWD
Bridge cum Bandhara
Railway Over Bridge
Railway Underpass with Roadway
Double Radius Arch for Railway
Double Radius Arch for Railway
LithelyArch for Cut and cover Tunnels
On site cut section for “Cut and cover”
Ribbed Arch
Back Filling in Old Arch Bridge
Skew in LithelyArch

You might also like