You are on page 1of 1

Solid Control & Drilling Waste Management

Environmental Drilling

Trip Tank Pump Trip Tank

Sand
B H Trap

Degaser Pump
Gumbo Box D
I
Flow Devided Desander Pump J

A Well G
Desilter Pump
F
E Mud

Shale Shaker 1
Shale Shaker 4

Shale Shaker 2
Shale Shaker 3
Clean

Desander

Desilter
Tank
Normal Mud Flow

Conditional Mud Flow


Mud
Solid Control/ Drilling Waste Clean
Tank

Cutting Ditch
BB Auger 1
Centrifuges

AA To Well, by Mud Pump

Decanter
Centrifuges
/ Solid
II
CC
Auger 2 & 3
Removal
Mud System Solid Control & Drilling Waste
Auger
JJ A Well AA Cutting Ditch
Wet Skip Wet Skip GG B Gumbo Box BB Auger 1
C Trip Tank CC Auger 2 & 3
Auger 4 KK D Flow Devided Box DD Auger 4
HH
DD
E Shale Shaker EE Cutting Dryer
Auger 5
Dry Skip
F Desander FF Auger 5
EE Dryer
FF
G Desilter GG Wet Cutting Skip
H Degaser HH Dry Cutting Skip
Dry Bags/ I Sand Trap/ Chamber II Decanter Centrifuges
Transition J Centrifugal Pump JJ Auger from Solid Removal
KK Wet Skip

Mud System Solid Control & Drilling Waste

A E I AA EE II

B F J BB FF JJ

C G CC GG KK

D H DD HH

Created by: Maychel Beta Wibowo (Environment)

You might also like