You are on page 1of 3

Sl.

No Point Cahnges Needed


1 Pre Commissioned date Should be Pre-Filled before Raising Call
2 Target Date Should be Pre-Filled before Raising Call
3 Actaul date Filled by Quality team
4 Region name Should be Auto Populated
5 Palnt Quality Rating Should not to be in General,Should be at the last of the report
6 SM & PM Name Should be Auto Populated in Display
7 PM & Sm Mobile Number Should be Auto Populated in Display
8 Type of Installation Should be Auto Populated in Display & in drop down(In Master)
9 EM's KWh Item Description deails-1
10 WBS ID Should be Pre-Filled before Raising Call
11 Task Name Should be Pre-Filled before Raising Call
12 Pv Syst Generation Details Should be PV Syst Yeild details
13 Generation Recorded Month Should be PV Syst Yeild details

14 Modules Make Need to Auto populated

15 Inverter Need to Auto populated

16
17
18
19
20
21
22
23
24
25
Field
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory

Make,Voltage Range,
Current,Qty, Size,Efficiency

Make,Voltage
Range,Efficiency,Load
Details,Quantity,Working
Temparature,IP,Clearance
Value
Sl.No Present Previous
1 Turn Over
2 No Of Projects
3 Ranking in PAN India
4 Awards & Achievements
5 Profits -15%
6 Failure rate 1-2%