You are on page 1of 1

1.

The following points and instructed by KRCL to TPL for the Toe wall design for at Custer
184m .
Toe wall design proposed by TPL ( RCC/ CRS stone ) is not acepetable to KRCL .
Tpl has to designed TOE wall as per site conditions with KRCL shared for reference drawing
toe wall and the following points to be considered.
 CC wall concrete grade is M20
 CC wall height is ( 2 to 4m ) as per site condition.
 Side slopes with 1:1 stone pitching is accepetiable to KRCL with Railway spec.
 Stone pitching spec. to be shared by KRCL
 Toe wall design at cluster & amenities area is CC wall with 1m above ground
and 0.5m below ground.

2.In considering the rain season the road cross drawings is discussed with KRCL
at cluster area.
3. KRCL given instructions to RASS validation to be done at the earliest and
released GFC drawings.