You are on page 1of 22
Republic of the Philegines, J MUNICIPALITY OF MARCOS. \gprice OF THE MUNICIPAL ENGINEER FQUIPMENT CAPABILITES, Type of equipment 1. atldozer «D8 2 Road Grader 3. Payloader 4, Crane Shovel 5. Sheep Foot Rolle 6.3 Whee Road Rller 7. Tractor Drawn Roller Tandem Roller 9) 6-1 Dump Track 10.247 —Damp Truck 1, Bugey 12. Wheel Borow 13. Water Truck 14. Concrete Mixer 15: Rock Chaser 16 Conrete Vibrator 7. Conrete Foot Finisher Average Capability 2) Clearing hy Stripping ey Excavation 1) Common Sit 2) Slighly hard Materials 4 y Quarrying 107 Common Materials 50 qm he 20m he Scum hr 108 Aggregates amt Boulders Scumshr 200 Needs Screening Pushing Scum he 4) Sub grading 300 cum hr Spreading 50 cum te, Loading 3cum.br Loading 3Seum.br 4) Static Rolling Scum br (12 passes 15 em. Vibratory Rolling 13Scumbe (6 passes 20cm.) 4) Sate Rolling Deum be (6 passes - 20m. fit) 2) Vibratory Rolling Deoumbe (Gpasses— 20m. lit) 8) Site Rolling eum, (6 passes ~20 mi) 1b) Vibratory Rolling Peumbe (6 pases 60m. if) 4) Hauling Common Bortow Base Course 'b) Hauling Selected Borow S$ 0cum We ©) Hauling Coneete Batch 2 Batchtip “Class A” 4) Hauling Common Borow 25 cus tip Base Course >) Hauling Selected Borrow $.0cum trp sum he Base Concrete Bach 1 0Batchitip Cass 4 8) Hauling Concrete Mix 0.17cum itp 4) Hauling Aggregates 0:17 sua. tp 6) Hauling Concrete Mix 00S cus tp 2) Watering 1000 sg. ip 8) Mixing Concrete Sour. 44) Crashing Mix sand & Gravel 3/cum he 1) Vibrating Concrete Miy 40 tm br 4) Finishing Concrete Floor (40 cam he ‘ N y . ] " ‘ ! ] ] { i i i | | Braise SD muitcreatiy oF maneos ere OF ne MUNCTPAL ENGIN = 1) Drilling Hard Rock 023 my 1, Percussion Dring Sing asenock ODE €)Diilng Lime Stone 93g mnt 4) Driling Sticky Cay apm ) Diillng Looe Clay one Forte 10 Cteingand Gating Asin Productivity Tosh Ceing sim naeay Bash Type 4) Light Bosh 200 3) Mesiam Bish 100 «) Dense Bish 0 2) Tecan! Stump Removal One) manny prem of tk dance Baof tee 3) Gnting Vegetation Type 2) Des vegetation in fim ol covering % tte ale ea 1) Spaced weet nose si 250 Norte 105 Exc for Ronda & Da Avi utr 1) Bxeaion Cam mandy (rong Sisanein mn) Soi Type 4m dom eam 2) Lot, tacky si 50-60 45-33 S55 8) Fim Si 35-45 3440 35-35 e)Veryhared soit hard silmined 20-30 18225 1-38 ‘ih ones 2) Loading com mandy Tye of Si 3) Loose 45-55 $) Fim 25-40 «) Hart 13-25 Excavation combined with loading of sil ean be effectively cared out by labore up oa loading height of about 1.00 eg. into whee! borrow or head taskets Above tht bright itis preferable to havea separate group of leaders whose outpt must be matched with hat ofthe excavators Necessary output forthe Loading Atty SoiLTape ‘Loading Heighy ‘Prods cum mandy 2) Loose eis b) Loose 7-10 ©) Loose “5 Forltem 106 — Excavation fr Smuctures 1) Exeraon Deaeres Depending on the ype of il ‘There use similar productivity Data as thse wed for Excavation In em 105 Gimeno unitate or a ten teacrea everncer Seam nay 0.50 2.0 cum /man-day Activity : 1) Gunying (Excavation & Gravel) 2) Looting 7 10eum mandy 3) spreaing 3 12cum an-ay 4) Composting 8 Team man day 1b considered inthis item, hence. hauling stance as an 55) Hauling acsivity shoo important bearing onthe cos Aistance has tobe considered fom ease 10 8 rte rveling operation, the maximum accep Hlng Vi Forttem 200 Aggregate Bare Course Produetivioy wi 1) Quarrying (0.50 2.0cum/inancay 2) Loading 7 10cum/man-day 53) Spreading 8- I2eum/mancday 4) Compacting 8 12eum/man-day $3) Hauling please refer to activity no. $of Item 108, 6) Sereeping Bos VIL. For tem 413 - Reinforced Concrete Pipe Culvert Active Produstivity 1) Crushing of stone for agaregate (0.20 cu m/man-day 2) Casting of culvert rings 2 man-daystring Refer culver laying data teow 53) Laying of standard culvert (24 in, diameter) 070.60 m. dia, length 600 m, Excavation culvert had and Backfill 4) Building of headwalls with masonry blocks 10 man-days/ head walls the length ofthe culvert exceeds 6 meters, the numberof man-yshas tobe increased accordingly ‘Culvert laying — this task consis ofthe excavation of the trench preparing tebe, laying o culver, bckflng and compaction. Number of man-ys eqied vanes with he volume ofthe excavation andthe sol type 0 al Za) pict ne rins ce \ Gert Ore munacipaenetneen PTHE REQUIRED Qu FACTORS OF EACH MATERIAL ‘CONCRETE (BASED) on the 88 pounds (Its. bag of cement ‘Cement= 9.08 Bags‘cu.m of concrete +3 5 % wastage Sand ~0.88 cumeum, of concrete +8 — 10% wastage Gravel 0.77 cumJleum. of concrete +8 10% wastage “8 “TE (2500 psi Cement ~ 838 bgsieum. of concrete + 35% wastage Sand 0.45 cum.cum.of concrete +8 10% wastage Gravel ~0.82 cucu. of concrete + 8 10% wastage (Cement- 9:77 bags'cusm of eanerete + 3 ~$¥4 wastage Sand 0.53 cum/eum. of concrete + 8 10% wastage Gravel -0.70 cumJeum. of conercte+ 8 10% wastage “LASS “D" CON Cement ~ 11.17 bagscu.m, of concrete + 35% wastage Sand 0.44 cumJoum. of eonrete + 8 10% wastage Gravel~ 0.68 cumJcum of concrete + 8 10% wastage FOR BRIDGE ESTIMATE Lumber for false work - 60 bfooveum. of eoneete Nails 2kiloscum, of concrete Tie wires +11 kiloscusm,of concrete Painting structural steel ~ 3 gallons pr ton ax, Rue ho toe © sie ries pac ee [AVERAGE FUEL CONSUMPTION PER FUEL ENGINE GEAR GREASE OIL10 ol oll cane, UO itentdese) 4 ers Me am Diesel Hammer 20fites ier Balzer 200 ew Dest) 3 Hes ‘ie Ve ee Paar, 100 ites (Diese ‘er ee idle ie Grae aoe Oise 2 He ek 2 Tr Damp ck ie (ie 1 He dine 1 Ter Mice (rege () — 7. Visor tee ui) = Dre Bogart 0 eet Crete oy 16m, nghincing ting) VOLU Soil Type 7 7-8 10-3 In these cases, the work split over wo of more days. First te tench shoud be excavate and then the preparation of the bed the lying backfiling and compaction s done, ‘Therefore the volume ofthe excavation to be limited following rates and then applicable: SoilTvee Productivity a) Hard Soil 3.50 cum /man-day bh) Very had, sony 2.00 cum mandy Ate completion of the trench approximately | man ~ days are needed to ly 6 ings, ‘chil and compact Finish road level. MECHANIZED ASPECT ARING AND GRUBB Dozer Production Vegetation (No.of T 0-0 1-100 101-200 201-250 250 above 20 360-280 190160130 0 2 20s 180 160 403005200 180, SS sD 200 om 4 = 0551S LGD) “Svcs of locos ote Suet EN et nen B. EXCAVATION (Common Material) BA Crane acity (cu.m//hr,) Bank Volume ‘Tonnage eT Stucure Creek v0 10 Is 2 is 3 20 2s 20 20 3 Ef 3 8 2 Dozer production (eum) Bank Volume Horse Power anal Structure io 35 20 10 2» i ® x0 180 s 7 200 0 2. Backhoe basket cum Prdution cum‘hr) Bank Volume Seat Ste Cash 030 2 O78 x0 a » % ry » ios 30 » » 50 % % 3% ©. QUARRYING ae Dozer Prodston (usm hr) Bank Volume Horse ower Common Austins CobblesBasiders 0 ss No 3 180, 6 % u 200 m8 3 1. AVERAGE SPEED OF DUMP TRUCK ‘Type of Road lometer per hour ‘With Load ‘Without Load Conerete/Aspalt Road 8 ca Good Maintained Gravel Road 30 35 Pootly Maintained Gravel Road 20 2s K, DEMOLITION OF CONCRETE 160 CEN Compressor & two (2) Jack Hammer ‘Capacity ~ 8,00 cum day for massive concrete 12,00 cu.m.iday for slab & wall L.DRIVING OF PILES Coe Pines _ Crane 25 tons with 2— tons drop hammer, Capacity = 8 LMJ ‘Concrete Piles: Crane 25 tons with 2500 kgs, Pile Hammer. Capacity ~2.00 LM. EM. per hour. 4.00 L-Mper hott for thick and thin concrete piles far, Republic ofthe Pritipines aD) Sovnce of locas Nore AES) municrPaurry oF maRCos ‘Oreict OF THE MUNICIPAL ENGINEER MANUAL ASPECT A. EXCAVATION: ‘A. Common Materials Capacity (cum Jday Bank Volume & Depth of Excvton Type of Work (meter) Farm Ditehs 300 250) 20 Canal 250 20 is Strvture 20 175 150 ‘A2 Slight Hard Materials (nd) Type of Work ‘Capacity (cum man-day) Bank Volume Canal 1.00 Structure 075 1, LOADING CAPABILITIES OF FIVE (8) LABORERS Sand & Common Cobbles Boulders Cement RS. Bars Lumber Plywood Gavel Cumtir cums. cums. cum bagshr kesh. BL AUhE. pes. ss 358 3 600 4000 "25 C. UNLOADING CAPABILITIES OF FIVE (S) LABORERS Sand & Common Cobbles Boulders Cement RS.Bas Lumber Plywood Gravel Cums cum/br. cum. cums. bagshr gst bf pes, 6. 6 5 4 300 7.000 4000" 2s D, CUT, BEND & PLACE RSB Structure 1 Stsiman & | Helper with ar eter (Canal others 0 kg iday F. QUARRYING Capability ‘sum/manday Sand & Gravel Cobbies ‘Boulies 350 280 200 F. DEMOLITION OF CONCRETE Slab and Wall 050 cumiman-ay Massive Concrete 020 eum/man-éay G, SCREENING OF AGGREGATES Gravel “4.00 cum nan- CONCRETE Lists (ew 1 Foreman. 2 Maio. 1 Light Fag Oper 10 Laborer wth one Rage miner Capcity, 0 crm dy Crow) Mason & § taborer WX Taney oe 2 ay day Arve 3424 ies doy ' ONG WORKS | Vabrcation, Placing & Drsmarting of Forme (ESE 2 Cameniens 4° Lattren Capac 350 cam day od a AM | ater Capmcy” 450 cum ay cee 2 Comereting an tring agains Hla Wad conete met Crew Cas Veeemae 2 mason, 1 ¥ Scum dey Cae 570m den Clas 10cm de Van Coeur 46 cum ty UE Operate 4 Laboees © haste cats Mawes? Labo Capaiey TE ade (oe eel ONGRETD Pires Capabsity Dramctee fact Cm Fabra lmalation 1 Foweman ? mn io 1 Nae . i 1 Carpenter Seeimas 3 ¥ 12 Latoeees th ry 6 Bagger Miner ‘ + & Repti ofthe Prippines wo ipa SF naos \ Serie See monneteA Eten OLE: TIME OF MIXING = BAGS OF CEMENT/DAY 310 MIN BAG (0 MINUTESIHOUR MI, MATERIAL ASPECT lass Strength Max.Aggre. Cement Sand Grave} ‘Bags‘eum Size. inch A. Concrete 8211 gs 150 900048 090 » 200s 200 7200 050 1.00 Canal Lining 200 kas 100750048 096 Ruble Masonry wi 21 kgs 4500225 048 75 ©. GroutedRipeap > 420035 003 109 Plan Riprap Sn D. Lean Conrete 500 050 1.00 : 100 ps E. Gravel Blanket : 1.00 F Filer Dain : OTHER MATERIALS Glass Typeof Strength. Lumber U2°PIywd, Tie Wire Nits Sire Kes bdfcum, pes/cum. kescum keseum A BridgefFlume 211 40 1.00 125RSB 230 ‘A SiphowBox Cul 211 25125128 200 A Other Sine @ine 215 125 horse 200 A‘ au 7 01. 050 B 200 5 i 028 A 2 is 040 LoovRsB 150 R 200 5 0.10 LoS 030 A am 5 - 035 Gravel Gi. Sheet Inches Bag Cum, Cum. Pe 2 058 002° 005 0.12 18 122 005 0.10 019 24 182 008 015 028 30 256 O11 021 030 36 333 014 028 034 ‘2 426 018 036 040 bas. om 036 048 0.60 on 088 cial Kes. 928 ™m 975 an 504 ost E Lumber Tiere CW Nails Kes oro 020 030 040 030 060 cen meee =) mucin oF naneos, \ sfonde She crac emencen INSTALLATION OF R.G.PIPES Diameter Cement Sand Gravel BSB E_Lumber Tie Wire CW Na Inches ee es Ban Kees z 2 OS Gar” oo 20 ook teas Gan coe as 200 tayo BG Oe oe ts 3m ay x0 093 00s 008 3263.00 oa 6 1 00s 40a 2 132006 em 4m oa fortwo 2) sides Cement oat Sand Cusm/gm, 0.045 0.089 es tet tne res fa>) _“srovnce of tlocos Norte SS samactnnce oF nascos ort ee eta Eten ACEL RATE 1998 erated Eavioment Description RateperDay Phe) Baldor Komats, DADA-L2DD 1804 mi Dw Payloader 7S TOMClark, 153 cum, ne Capacity. ISL tp Rood Grader Mitsibishi MG S00 170 Hp 80800 Dump Track Japan & other Make, men, 1Oeum. Capacity Road Roller Ingersoll Rand SP88 MI Tons 8701.09 Crane All models, Truck mounted, 1125600 Standard mechanically operated 31-35 Tons Backhoe Komatsu PC 120, Capacity 90 Hp 9.65600 ‘Transit Mixer Japan Make 3.8 cum, 46 cum 852809 Capacity 175 Hy Air Compressor GasDiesel Engine, CFM 20 Hp 137600 Plate Compactor 2H Engine Driven 1688.00 Asphalt Paver ‘Worthington 34 (Basie Equipment Only) 3320.00, ‘Asphalt Distributor Lite Ford Sprasmaster 5784.00 Bare Equipment Dessrintion Pile Hammer (wio crane) Domag D8—22 506700 Drop Hammer (wio crane) Two Tons w/ Pile Hammer 100.00 Jack Hammer Stanley, hydraulic wo power unit 29400 ‘Welding Machine GasDiesel Driven 250 Amps, 18S Hp 300.00 Concrete Mixer 1 Bagger 298.00 CConereteVitrator Gas Diesel Driven 341.00 Chainsaw Husquama, 2100 CD wi Blade 180.00 ‘Water Truck

You might also like