Procedure to Start the CMM

1) First Clean the Machine properly with ISO Propyl Alcohol ( Except Scale ).
2) Remove I/P Supply connection of Machine controller from UPS O/P.
3) Check UPS I/P Supply. ( 230 V 50 Hz. )
4) Also Check Earth/Neutral Voltage ( It should be below 2 Volts. )
5) After confirmation of I/P Supply ok connect UPS and check the O/P Supply voltage condition of UPS.
6) After ensuring UPS O/P Supply Ok now it is ready to connect Machine controller I/P to UPS.
7) Remove I/P air connection pipe from air dryer unit.
8) Drain the Air supply from main Supply pipe for few Minutes ( To Clean the Moisture, Oil and dust content from main line )
9) Check the I/P Supply for Air Dryer Unit, after confirmation switch “ON” the air dryer unit and wait until the Indicator on air dryer goes in “ Green band “.
10) Clean the Filter unit assembly of air dryer as well as Machine I/P section.
11) Remove I/P air pipe from Machine.
12) Connect air dryer I/P air supply pipe to Main I/P supply line. Switch “ON” the main air supply and drain the air for few Minutes from air dryer O/P pipe and ensure air quality ( Moisture
& oil Free )
13) After ensuring quality of air, connect machine air supply pipe.
14) After confirmation of UPS Supply Condition, Air Quality and Cleaning of Machine now Machine is ready for power ‘ON”.
15) Connect Machine I/P Supply connection to UPS.
16) Switch “ON” the Controller and Machine Computer system.
17) Once Booting of Controller gets completed then open the Software.
18) Then perform the Homing of the Machine.
19) After Completion of homing move all the axis to their full stroke in ( + VE and – VE ) direction and ensure the smooth movement. Repeat full stroke movement for all axis min 8-10 times.
20) Then
1 run
| warm up cycle program for all axis for 10 to 15 Minutes.
hexagonmi.com

21) Now after successful run of warm up program machine is ready for Job Inspection.