KINGDOM OF CAMBODIA

NATION RELIGION KING

STRUCTURAL DRAWING
VILLA PROJECT

211-REVISION B

Cambodia

2019
NO. NAME OF PLANS REVISION DATE
0 A B C D E F G
1 PILE LAYOUT PLAN x x 21/8/2019
2 PILE CAP LAYOUT PLAN x x 21/8/2019
3 GROUND FLOOR LAYOUT PLAN x x x 29/9/2019
4 FIRST FLOOR LAYOUT PLAN x x x 29/9/2019
5 SECOND FLOOR LAYOUT PLAN x x x 29/9/2019
6 TOP ROOF LAYOUT PLAN x x x 29/9/2019

NO. NAME OF PLANS REVISION DATE


0 A B C D E F G
R1 PILE CAP DETAILS x 21/8/2019
R2 PILE CAP DETAILS x 21/8/2019
R3 PILE CAP DETAILS x 21/8/2019
R4 COLUMN DETAILS x 21/8/2019
R5 GROUND FLOOR BEAM DETAILS x 21/8/2019
R6 FIRST FLOOR BEAM DETAILS x 21/8/2019
R7 SECOND FLOOR BEAM DETAILS x 21/8/2019
R8 ROOF FLOOR BEAM DETAILS x 21/8/2019
R9 SLAB DETAIL x 29/9/2019
R10 LIFT'S BEAM DETAIL x 29/9/2019
R11 RC STAIR DETAIL x 29/9/2019
R12
R13
R14
R15

Name: Rev Page


LIST OF PLANS B 00
A B C D
1564
512 540 512
GROUND FLOOR FINISHING LEVEL =+0.90
GROUND LEVEL =+0.00

37.5

37.5

37.5

37.5
5

52.5

52.5

52.5

52.5
Starter bar from cap
RC PILE 30x30, Depth 13m and L=12m with Qall=27.25 ton
37.5 P4 P6 P6 P4 Total number of pile=103
90 90 90 90 52.5
CL=-0.95 CL=-0.95 CL=-0.95 CL=-0.95
52.5
37.5
G.E.T-Asia: Soil report date Sept 12, 2018
600

52.5
37.5 90 90 90 90

45 45 45 45
90

90

90

90
4
90

90

90

90
P6 P8 P8 52.5 P6 CL: Cut level of pile by keeping starter bars 40*dia
CL=-0.95 CL=-0.95 CL=-0.95 CL=-0.95
10 90 90 10 37.5
200
600

45 45

90 90
56 71
P6
200

CL=-1.20
45 45
2335

90
63.5 63.5

45 45

90
P5 10 90 90 10 80 P8
CL=-1.20 P8 P6
CL=-0.95 52.5
CL=-0.95 37.5CL=-0.95
600

37.5
52.5
52.5
52.5

52.5

52.5

2
37.5

37.5

37.5

37.5

P4 90 90 P6 90 90 P6 P4
37.5
CL=-0.95 CL=-0.95 CL=-0.95 CL=-0.95
52.5
535

P1 P1
CL=-0.95 CL=-0.95 PILE LAYOUT PLAN
Scale 1:100 Name: Rev Page
PILE LAYOUT PLAN 0 01
A B C D
Starter bar from cap
1564
PILE 30x30
512 540 512
160 CAP DIMENSION BL TL Nb
PC1 70x70x50HT -1.00 -0.50 2

72.5

87.5 72.5

87.5 72.5
PC4 160x160x60HT -1.00 -0.40 4

160

160

160
5 PC5 198x198x60HT -1.00 -0.40 1

87.5
C2 C2 C2 C2 PC6 160x250x65HT -1.00 -0.35 7
PC8 250x250x60HT -1.00 -0.40 3
72.5 PC4 125 125 PC6 125 125 PC6 PC4 PC68 340x360x65HT -1.25 -0.60 1
87.5
250 (cm) BL: Bottom level
250
TL: Top level
(Indication otherwise)
600

C4
160 250 250 160
STUMP DIMENSION Nb
C1 30x30 2
125

C2 35x35 12
C3 40x40 4
250

250

250

250
4
C4 20x20 3
C2 C3 C3 C2
125

72.5 PC6 PC8 PC8 87.5 PC6


87.5 72.5 MATERIALS
250 Concrete: fck=30MPa cylinder
25 200 25 Deformed bars: T 390MPa
600

Round bars: R 235MPa


160

200

250 160
C4
197.5 C4 C4
200

360
40
98.5
2335

80
197.5

250

250
160

3
C2 C4 C3 C3 C2
98.5

80

91 PC5 25 200 115PC68


106 340 PC8 87.5 PC6 GROUND FLOOR FINISHING LEVEL =+0.90
72.5 GROUND LEVEL =+0.00
600

PIT OF LIFT ELEVATOR IS 1.5m Depth/FFL

160 125 125 125 125 160


72.5 87.5

72.5 87.5

72.5 87.5

72.5 87.5
160

160

160

160
2
C2 C2 C2 C2
PC4 250 PC6 250 PC6 87.5 PC4
72.5 87.5 72.5
535

70 70
70

70

1
C1 C1
PC1 PC1 PILE CAP LAYOUT PLAN
Scale 1:100 Name: Rev Page
PILE CAP LAYOUT PLAN 0 02
A B C D
1564 +0.85 FL
+0.80 CL

BL=-0.35
512 540 512

GB7A
12cm thk

BL=+0.40

BL=+0.40
GB7

GB7
GB1 GB1 GB1 GB7A BL=-0.35
5
C2 C2 C2 C2
+0.00 FL
-0.05 CL
97.5
12cm thk
87.5

S1 S1 S1

GB1A
GB1

GB1

GB1
600

C4
G7

20
BL=+1.55
STUMP DIMENSION

115
Nb
C1 30x30 2

168
C2 35x35 12
GB1 GB1 +1.90 FL

73
185
GB1 +1.85 CL
C3 40x40 4
4
C4 20x20 4
C2 C3 C3 C2 12cm thk

S1 BEAMS DIMENSION BL TL
GB1 20x50HT +0.35 +0.85
GB1A 20x50HT +0.35 +0.85
GB2 20x40HT +0.45 +0.85
200 S1 S1
GB1

GB1

GB1

GB1
+0.90 FL
600

GB7 20x40HT +0.45 +0.85


+0.85 CL
GB7A 20x30HT +0.55 +0.85
12cm thk
GB2 (cm) BL: Bottom level
TL: Top level
C4 S2 C4 180
C4 (Indication otherwise)
200

180

Void SLAB THICKNESS


S1 12
2335

GB1 GB1 S2 12
3 (cm)
C2 GB1 C4 C3 C3 C2
MATERIALS
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa
GB1

GB1

GB1

GB1
600

S1 S1 S1

GB1 GB1 GB1


GB7A

GB7A

GB7A

GB7A

2
C2 C2 C2 C2
81

81

77 88 181 88.5 77 +0.90 FL 77 88.5 181 88 77


+0.85 CL
12cm thk
GB1
GB1
535

S1

GB1
1
C1 C1
GROUND FLOOR LAYOUT PLAN
Scale 1:100 Name: Rev Page
GROUND FLOOR LAYOUT PLAN B 03
A B C D
1564
512 540 512 195

G2A GROUND FLOOR FINISHING LEVEL =+0.90

100
G7

G7
+3.70 FL
G7 G1 G1 G7 +3.65 CL GROUND LEVEL =+0.00
5 12cm thk
C2 C2 G1 C2 C2
BL=+3.35

120
120

S1 S1 S1 COLUMN
G2A

G1A
GF-1F DIMENSION
600

Nb
G1

G1

G1
C1 30x30 2
C4 G7

71
C2 35x35 12
G2 C3 40x40 4

20
BL=+4.90 BL=+4.90 C4 20x20 4

269
S2

G2A
188

198
168
G7 G1 G1 G1 G7 +5.35 FL BEAMS DIMENSION BL TL
4 +5.30 CL G1 20x50HT +4.85 +5.35
C2 S2 G2 C3 C3 C2 BL=+4.90 12cm thk
90

G1A 20x50HT +4.85 +5.35


+3.15 FL 185 G2 20x40HT +4.95 +5.35
+3.10 CL 472 G2A 20x40HT +4.95 +5.35
G4-stair
BL=+2.70

12cm thk G4-stair 20x30HT +2.80 +3.10


LANDING G7 20x40HT +4.95 +5.35
300

Stair G7A 20x30HT +5.05 +5.35


200 S1 +5.40 FL S1
(cm) BL: Bottom level
600

G1

G1

G1

G1
+5.35 CL TL: Top level
12cm thk (Indication otherwise)
G2
20

SLAB THICKNESS
C4 S2 C4 180
C4 S1 12
G2A

S2 12
200

180

Void (cm)
2335

G7 G1 G1 G7
3 MATERIALS
C2 G1 C4 C3 C3 C2 Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
SEE LIFT'S BEAM DETAIL Round bars: R 235MPa

120 120
G2A

G2A
600

S1 S1 S1
G1

G1

G1

G1
G7 G1 G1 G1 G7
G7A

G7A

G7A

G7A

2
C2 C2 C2 C2
81

81
200

77 88 181 88.5 77 +5.35 FL 77 88.5 181 88 77


+5.30 CL
starter bars 12cm thk starter bars
535

G1
G1

S1

65 540 65
G1
1
C1 C1
FIRST FLOOR LAYOUT PLAN
Scale 1:100 Name: Rev Page
FIRST FLOOR LAYOUT PLAN B 04
A B C D
1564
512 540 512 195

+7.25 FL
GROUND FLOOR FINISHING LEVEL =+0.90
G1 G1 G1 G7 +7.20 CL GROUND LEVEL =+0.00
5 12cm thk
BL=+6.90

113
C2 C2 C2 C2
GROUND LEVEL =+0.00
S1

S1 S1 COLUMN

G1A
1F-2F DIMENSION
600

Nb
G1

G1

G1
G7 C2 35x35 12
G2 C3 40x40 4
C4 20x20 6

5
200
BL=+8.70 BL=+8.70

G2A
203
S2

168
G1 G1 G1 G7 +9.15 FL BEAMS DIMENSION BL TL
4 +9.10 CL G1 20x50HT +8.65 +9.15
C2 S2 G2 C3 C3 C2 BL=+8.70 12cm thk
90
G1A 20x50HT +8.65 +9.15
185
+7.20 FL G2 20x40HT +8.75 +9.15
+7.15 CL 472 G2A 20x40HT +8.75 +9.15
G4-stair
BL=+6.85

12cm thk G4-stair 20x30HT +8.75 +9.15


LANDING G7 20x40HT +8.75 +9.15
300

Stair G7A 20x30HT +8.85 +9.15


200 S1 +9.20 FL S1
(cm) BL: Bottom level
600

G1

G1

G1

G1
+9.15 CL TL: Top level
12cm thk (Indication otherwise)
G2
SLAB THICKNESS
C4 S2 C4 C4 S1 12
G2A

180
S2 12
200

180

Void (cm)
2335

G1 G1
3 MATERIALS
C2 G1 C4 C3 C3 C2 Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
SEE LIFT'S BEAM DETAIL Round bars: R 235MPa
600

S1 S1 S1
G1

G1

G1

G1
G1 G1 G1
20
G7A

G7A

G7A

G7A

2
C2 C2 C2 C2
81

81

S2
180
G2

G2

77 88 181 88.5 77 77 88.5 181 88 77


G2
20

C4 C4
535

SECOND FLOOR LAYOUT PLAN


Scale 1:100 Name: Rev Page
SECOND FLOOR LAYOUT PLAN B 05
A B C D
1564
512 540 512

GROUND FLOOR FINISHING LEVEL =+0.90


GROUND LEVEL =+0.00
5

Short columns to protect reinforcement


600

G2 G2 G2

119.5
G7

G7

G7

G7
S2 S2 S2
G1 G1 G1
4 Short columns to protect reinforcement for future stories
C2 S2 C3 C3 C2
90

G2

S1 FUTURE STAIR

200 S1 +12.35 FL S1
600

600
G1

G1

G1

G1
+12.30 CL
12cm thk
G2
C4 S2 C4 C4
G2A

180
200

180

S20
2335

G1 G1
3 Short columns to protect reinforcement for future stories
C2 G1 C4 C3 C3 C2
S2 S2 S2
G7

G7

G7
SEE LIFT'S BEAM DETAIL

210
COLUMN
G7

G2 G2 G2
2F-RF DIMENSION Nb
C2 35x35 12
C3 40x40 4
600

+-.-- FL
+13.50 CL C4 20x20 4
20cm thk
LIFT ROOF
Ref: Clear height for lift's top BEAMS DIMENSION BL TL
slab: 4.1m/+9.20 G1 20x50HT +8.65 +9.15
RB22 in U shape to provide G2 20x40HT +8.75 +9.15
for Hoocking with numbers G2A 20x40HT +8.75 +9.15
and position as provided by G7 20x40HT +8.75 +9.15
2 lift's spec.
(cm) BL: Bottom level
TL: Top level
(Indication otherwise)
Short columns to protect reinforcement
SLAB THICKNESS
S1 12
S2 12
535

(cm)

MATERIALS
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa

TOP ROOF LAYOUT PLAN


Scale 1:100 Name: Rev Page
TOP FLOOR LAYOUT PLAN B 06
PILE CAP - PC1 PILE CAP - PC4 PILE CAP - PC5
Scale 1:30 Scale 1:30 Scale 1:30
nb=2 nb=4 nb=1

35
35
90

90
35 35
60

197.5
127.5
160
90

35

35
60

90

90
35

35
35 90 35
160
35 127.5 35
197.5

STUMP STUMP
STUMP
30 35 35

35

35
30

90

90
74

30 35 35

+0.85 CL +0.85 CL +0.85 CL


50

50

50
85

85

85
125

125
135

8T20 8T20
+0.00 G.LEVEL +0.00 G.LEVEL +0.00 G.LEVEL
185

185
4T16
185

R8@10 R8@10
40

40
50

R8@10 T10@15 T10@15


5T10 -0.50 CL -0.50 CL
-0.50 CL
T10@15 T10@15
T10@12
60

60

60

60
35Dia

35Dia
50

50

30

-1.00 CL -1.00 CL -1.00 CL


55

55

55
5T16 T16@15 T16@15
70 160 197.5
PILE 30x30x12m PILE 30x30x12m PILE 30x30x12m
Qall=27.5t Qall=27.5t Qall=27.5t

MATERIALS
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa Name: Rev Page
PILE CAP DETAIL 0 R01
PILE CAP - PC6 PILE CAP - PC8
Scale 1:30 Scale 1:30
nb=7 nb=3

35
35

35 40

250
160

180

40
90

35
35

35 90 125
250

35
35 90 125
250

STUMP
STUMP
35 40

40
35
90

90
74
35 40

+0.85 CL +0.85 CL
50

50
85

85
120

120
8T20 4T20+8T16
+0.00 G.LEVEL +0.00 G.LEVEL
185

185
R8@10 R8@10
35

35

T12@15
T10@15
-0.35 CL -0.35 CL

T10@15 T10@15
65

65

65

65
30
35Dia

35Dia

30

-1.00 CL -1.00 CL
55

55

T20@15 T20@15
160 250
PILE 30x30x12m PILE 30x30x12m
Qall=27.5t Qall=27.5t

MATERIALS
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa Name: Rev Page
PILE CAP DETAIL 0 R02
PILE CAP - PC68 LIFT PIT
Scale 1:30 Scale 1:30
nb=1
250

25 200 25 90

70
T12@15
160

20

20
C4 C4

200
360

360
180

180
LIFT PIT
40

15 20 180 20 15
20 180 20

80
160

160
40

40
20

20
C4
40
40 C3

80
70

STUMP
C3
STUMP
C4

40
25 200 115

90
40

20
74

74
340 6T16
40
20
10
+0.85 CL

LIFT PIT

50
85

145

145
6T16 4T20+8T16
+0.00 G.LEVEL
R8@10

95

210
60
R8@10
15 20 T12@15
125 -0.60 CL

T10@15
65

65
30

35Dia
-1.25 CL
55

T20@15
340
PILE 30x30x12m
MATERIALS
Qall=27.5t
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa Name: Rev Page
PILE CAP DETAIL 0 R03
RC COLUMN LIST

MARK C1 (30x30) C2 (35x35) C4 (40x40) C4 (20x20)

LEVEL SECTION SECTION SECTION SECTION

30 35 40
20

30

35

40

20
GF TO TOP ROOF

MAIN BARS: 4T16 MAIN BARS: 8T20 MAIN BARS: 4T20+8T16 MAIN BARS: 6T16
LINK: R8@15 LINK: R8@10-15 LINK: R8@10-15 LINK: R8@15
STIRRUP: - STIRRUP: R8@10-15 STIRRUP: R8@10-15 STIRRUP: -

30 35 40
20
30

35

40

20
STUMP COLUMN

MAIN BARS: 4T16 MAIN BARS: 8T20 MAIN BARS: 4T20+8T16 MAIN BARS: 6T16
LINK: R8@15 LINK: R8@10-15 LINK: R8@10-15 LINK: R8@15
STIRRUP: - STIRRUP: R8@10-15 STIRRUP: R8@10-15 STIRRUP: -

f'c=30MPa, fy=390MPa, fyt=235MPa

MATERIALS
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa Name: Rev Page
COLUMN DETAIL 0 R01
RC BEAM LIST FOR GROUND BEAMS (cm)

MARK GB1 (20x50) GB1A (20x50) GB2 (20x40) GB7 (20x40) GB7A (20x30)

POSITION BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS BOTH ENDS

20 20 20 20 20 20 20 20

30
40

40

40
50

50

50

50
BEAM SECTION

L L

TOP BAR 6T16 3T16 6T16 3T16 5T16 2T16 5T16 3T16

BOTTOM BAR 3T16 6T16 3T16 6T16 2T16 4T16 2T16 2T16

SKIN REIN. - - - - - - - -

STIRRUP R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@15 R8@15

TIE BAR - - -

MATERIALS
Concrete: f'c=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa

L1/3-EXTRA BARS L1/3-EXTRA BARS L2/3-EXTRA BARS L2/3-EXTRA BARS


12db

link link link link link link link

5 5 5 5 5
L1/8 L1/8 L2/8 L2/8
L1/4 L1/2 L1/4 L2/4 L2/2 L2/4
L1 L2 L3

Name: Rev Page


GROUND BEAM DETAIL 0 R05
RC BEAM LIST FOR FIRST FLOOR BEAMS (cm)

MARK G1 (20x50) G1A (20x50) G2 (20x40) G2A (20x40) G4 (20x30) G7 (20x40) G7A (20x30)

POSITION BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS BOTH ENDS

20 20 20 20 20 20 20 20 20 20 20 20

30

30

30
40

40

40

40

40
50

50

50

50
BEAM SECTION

L L

TOP BAR 6T16 3T16 6T16 3T16 5T16 2T16 2T16 2T16 4T16 2T16 5T16 3T16

BOTTOM BAR 3T16 6T16 3T16 9T16 2T16 4T16 2T16 4T16 2T16 3T16 2T16 2T16

SKIN REIN. - - - - - - - - - - - -

STIRRUP R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@15 R8@15

TIE BAR - - - - -

MATERIALS
Concrete: f'c=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa

L1/3-EXTRA BARS L1/3-EXTRA BARS L2/3-EXTRA BARS L2/3-EXTRA BARS


12db

link link link link link link link

5 5 5 5 5
L1/8 L1/8 L2/8 L2/8
L1/4 L1/2 L1/4 L2/4 L2/2 L2/4
L1 L2 L3

Name: Rev Page


FIRST FLOOR BEAM DETAIL 0 R06
RC BEAM LIST FOR SECOND FLOOR BEAMS (cm)

MARK G1 (20x50) G1A (20x50) G2 (20x40) G2A (20x40) G7 (20x40) G7A (20x30)

POSITION BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS BOTH ENDS

20 20 20 20 20 20 20 20 20 20

30
40

40

40

40

40
50

50

50

50
BEAM SECTION

L L

TOP BAR 6T16 3T16 6T16 3T16 5T16 2T16 2T16 2T16 5T16 3T16

BOTTOM BAR 3T16 6T16 3T16 9T16 2T16 4T16 2T16 4T16 2T16 2T16

SKIN REIN. - - - - - - - - - -

STIRRUP R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@10

TIE BAR - - - -

MATERIALS
Concrete: f'c=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa

L1/3-EXTRA BARS L1/3-EXTRA BARS L2/3-EXTRA BARS L2/3-EXTRA BARS


12db

link link link link link link link

5 5 5 5 5
L1/8 L1/8 L2/8 L2/8
L1/4 L1/2 L1/4 L2/4 L2/2 L2/4
L1 L2 L3

Name: Rev Page


SECOND FLOOR BEAM DETAIL 0 R07
RC BEAM LIST FOR ROOF FLOOR BEAMS (cm)

MARK G1 (20x50) G1A (20x50) G2 (20x40) G2A (20x40) G7 (20x40) G7A (20x30)

POSITION BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS BOTH ENDS

20 20 20 20 20 20 20 20 20 20

30
40

40

40

40

40
50

50

50

50
BEAM SECTION

L L

TOP BAR 6T16 3T16 6T16 3T16 5T16 2T16 2T16 2T16 5T16 3T16

BOTTOM BAR 3T16 6T16 3T16 9T16 2T16 4T16 2T16 4T16 2T16 2T16

SKIN REIN. - - - - - - - - - -

STIRRUP R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@10

TIE BAR - - - -

MATERIALS
Concrete: f'c=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa

L1/3-EXTRA BARS L1/3-EXTRA BARS L2/3-EXTRA BARS L2/3-EXTRA BARS


12db

link link link link link link link

5 5 5 5 5
L1/8 L1/8 L2/8 L2/8
L1/4 L1/2 L1/4 L2/4 L2/2 L2/4
L1 L2 L3

Name: Rev Page


ROOF FLOOR BEAM DETAIL 0 R08
DETAIL REINFORCEMENT FOR SLABS (cm)
Direction (Lx) Direction (Ly) Noted
NAME TYPE THICKNESS
1 2 3 1 2 3
S1 A 12cm DB10@15 DB10@15 DB10@20 DB10@15 DB10@15 DB10@20

S2 B 12cm DB10@15 DB10@15 - DB10@15 DB10@15 -

S20 B 20cm DB12@15 DB12@15 - DB12@15 DB12@15 -

TYPE "A" TYPE "B"


Lx/4 Lx/4
3 1 2 3
Ly (Long
Lx/4
Lx (Short Direction )

3 3
Direction)

Lx (Short Direction )
1 1
2 2
1
2
Lx/4

3 3

3 1 2 3 1 2

Ly (Long
Direction)

LEGEND:
Bottom bar
Top bar

Name: Rev Page


RC SLABS DETAIL B R09
LIFT - VIEW PLAN
Scale 1:50

20 180 RC BEAM LIST FOR LIFT ELEVATOR

MARK GX (20x30)
20

POSITION BOTH ENDS CENTER

GX 20 20

30

30
BEAM SECTION
GX
180

ELEVATOR
TOP BAR 4T16 2T16

BOTTOM BAR 2T16 3T16

SKIN REIN. - -

STIRRUP R8@10 R8@15

TIE BAR -
20

GX
MATERIALS
Concrete: f'c=30MPa cylinder
LIFT ELEVATOR requirement: Deformed bars: T 390MPa
Round bars: R 235MPa
GX is at Every mid-level or at
maximum spacing 2.5m
between each.

Name: Rev Page


LIFT'S BEAM DETAIL B R10
10 600
205 297
+9.20F

5
12

206.5
15
238 118

380
380

264
203 296.5
10

+5.40F +5.40F

353.5
12

315
15

125.5 492

15
360

177

450
T10@10

15
T10@20
540
15

73 115
360
15

T10@10
+0.90F +0.90F
175

T10@20
15

95

+0.00
15

-0.05
OUT-DOOR STAIR DETAIL T10@10
T10@20
IN-DOOR STAIR DETAIL
Scale 1:50 Scale 1:50

Name: Rev Page


RC STAIR DETAIL B R11

You might also like