Professional Documents
Culture Documents
211-Villa-Rev B
211-Villa-Rev B
STRUCTURAL DRAWING
VILLA PROJECT
211-REVISION B
Cambodia
2019
NO. NAME OF PLANS REVISION DATE
0 A B C D E F G
1 PILE LAYOUT PLAN x x 21/8/2019
2 PILE CAP LAYOUT PLAN x x 21/8/2019
3 GROUND FLOOR LAYOUT PLAN x x x 29/9/2019
4 FIRST FLOOR LAYOUT PLAN x x x 29/9/2019
5 SECOND FLOOR LAYOUT PLAN x x x 29/9/2019
6 TOP ROOF LAYOUT PLAN x x x 29/9/2019
37.5
37.5
37.5
37.5
5
52.5
52.5
52.5
52.5
Starter bar from cap
RC PILE 30x30, Depth 13m and L=12m with Qall=27.25 ton
37.5 P4 P6 P6 P4 Total number of pile=103
90 90 90 90 52.5
CL=-0.95 CL=-0.95 CL=-0.95 CL=-0.95
52.5
37.5
G.E.T-Asia: Soil report date Sept 12, 2018
600
52.5
37.5 90 90 90 90
45 45 45 45
90
90
90
90
4
90
90
90
90
P6 P8 P8 52.5 P6 CL: Cut level of pile by keeping starter bars 40*dia
CL=-0.95 CL=-0.95 CL=-0.95 CL=-0.95
10 90 90 10 37.5
200
600
45 45
90 90
56 71
P6
200
CL=-1.20
45 45
2335
90
63.5 63.5
45 45
90
P5 10 90 90 10 80 P8
CL=-1.20 P8 P6
CL=-0.95 52.5
CL=-0.95 37.5CL=-0.95
600
37.5
52.5
52.5
52.5
52.5
52.5
2
37.5
37.5
37.5
37.5
P4 90 90 P6 90 90 P6 P4
37.5
CL=-0.95 CL=-0.95 CL=-0.95 CL=-0.95
52.5
535
P1 P1
CL=-0.95 CL=-0.95 PILE LAYOUT PLAN
Scale 1:100 Name: Rev Page
PILE LAYOUT PLAN 0 01
A B C D
Starter bar from cap
1564
PILE 30x30
512 540 512
160 CAP DIMENSION BL TL Nb
PC1 70x70x50HT -1.00 -0.50 2
72.5
87.5 72.5
87.5 72.5
PC4 160x160x60HT -1.00 -0.40 4
160
160
160
5 PC5 198x198x60HT -1.00 -0.40 1
87.5
C2 C2 C2 C2 PC6 160x250x65HT -1.00 -0.35 7
PC8 250x250x60HT -1.00 -0.40 3
72.5 PC4 125 125 PC6 125 125 PC6 PC4 PC68 340x360x65HT -1.25 -0.60 1
87.5
250 (cm) BL: Bottom level
250
TL: Top level
(Indication otherwise)
600
C4
160 250 250 160
STUMP DIMENSION Nb
C1 30x30 2
125
C2 35x35 12
C3 40x40 4
250
250
250
250
4
C4 20x20 3
C2 C3 C3 C2
125
200
250 160
C4
197.5 C4 C4
200
360
40
98.5
2335
80
197.5
250
250
160
3
C2 C4 C3 C3 C2
98.5
80
72.5 87.5
72.5 87.5
72.5 87.5
160
160
160
160
2
C2 C2 C2 C2
PC4 250 PC6 250 PC6 87.5 PC4
72.5 87.5 72.5
535
70 70
70
70
1
C1 C1
PC1 PC1 PILE CAP LAYOUT PLAN
Scale 1:100 Name: Rev Page
PILE CAP LAYOUT PLAN 0 02
A B C D
1564 +0.85 FL
+0.80 CL
BL=-0.35
512 540 512
GB7A
12cm thk
BL=+0.40
BL=+0.40
GB7
GB7
GB1 GB1 GB1 GB7A BL=-0.35
5
C2 C2 C2 C2
+0.00 FL
-0.05 CL
97.5
12cm thk
87.5
S1 S1 S1
GB1A
GB1
GB1
GB1
600
C4
G7
20
BL=+1.55
STUMP DIMENSION
115
Nb
C1 30x30 2
168
C2 35x35 12
GB1 GB1 +1.90 FL
73
185
GB1 +1.85 CL
C3 40x40 4
4
C4 20x20 4
C2 C3 C3 C2 12cm thk
S1 BEAMS DIMENSION BL TL
GB1 20x50HT +0.35 +0.85
GB1A 20x50HT +0.35 +0.85
GB2 20x40HT +0.45 +0.85
200 S1 S1
GB1
GB1
GB1
GB1
+0.90 FL
600
180
GB1 GB1 S2 12
3 (cm)
C2 GB1 C4 C3 C3 C2
MATERIALS
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa
GB1
GB1
GB1
GB1
600
S1 S1 S1
GB7A
GB7A
GB7A
2
C2 C2 C2 C2
81
81
S1
GB1
1
C1 C1
GROUND FLOOR LAYOUT PLAN
Scale 1:100 Name: Rev Page
GROUND FLOOR LAYOUT PLAN B 03
A B C D
1564
512 540 512 195
100
G7
G7
+3.70 FL
G7 G1 G1 G7 +3.65 CL GROUND LEVEL =+0.00
5 12cm thk
C2 C2 G1 C2 C2
BL=+3.35
120
120
S1 S1 S1 COLUMN
G2A
G1A
GF-1F DIMENSION
600
Nb
G1
G1
G1
C1 30x30 2
C4 G7
71
C2 35x35 12
G2 C3 40x40 4
20
BL=+4.90 BL=+4.90 C4 20x20 4
269
S2
G2A
188
198
168
G7 G1 G1 G1 G7 +5.35 FL BEAMS DIMENSION BL TL
4 +5.30 CL G1 20x50HT +4.85 +5.35
C2 S2 G2 C3 C3 C2 BL=+4.90 12cm thk
90
G1
G1
G1
G1
+5.35 CL TL: Top level
12cm thk (Indication otherwise)
G2
20
SLAB THICKNESS
C4 S2 C4 180
C4 S1 12
G2A
S2 12
200
180
Void (cm)
2335
G7 G1 G1 G7
3 MATERIALS
C2 G1 C4 C3 C3 C2 Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
SEE LIFT'S BEAM DETAIL Round bars: R 235MPa
120 120
G2A
G2A
600
S1 S1 S1
G1
G1
G1
G1
G7 G1 G1 G1 G7
G7A
G7A
G7A
G7A
2
C2 C2 C2 C2
81
81
200
G1
G1
S1
65 540 65
G1
1
C1 C1
FIRST FLOOR LAYOUT PLAN
Scale 1:100 Name: Rev Page
FIRST FLOOR LAYOUT PLAN B 04
A B C D
1564
512 540 512 195
+7.25 FL
GROUND FLOOR FINISHING LEVEL =+0.90
G1 G1 G1 G7 +7.20 CL GROUND LEVEL =+0.00
5 12cm thk
BL=+6.90
113
C2 C2 C2 C2
GROUND LEVEL =+0.00
S1
S1 S1 COLUMN
G1A
1F-2F DIMENSION
600
Nb
G1
G1
G1
G7 C2 35x35 12
G2 C3 40x40 4
C4 20x20 6
5
200
BL=+8.70 BL=+8.70
G2A
203
S2
168
G1 G1 G1 G7 +9.15 FL BEAMS DIMENSION BL TL
4 +9.10 CL G1 20x50HT +8.65 +9.15
C2 S2 G2 C3 C3 C2 BL=+8.70 12cm thk
90
G1A 20x50HT +8.65 +9.15
185
+7.20 FL G2 20x40HT +8.75 +9.15
+7.15 CL 472 G2A 20x40HT +8.75 +9.15
G4-stair
BL=+6.85
G1
G1
G1
G1
+9.15 CL TL: Top level
12cm thk (Indication otherwise)
G2
SLAB THICKNESS
C4 S2 C4 C4 S1 12
G2A
180
S2 12
200
180
Void (cm)
2335
G1 G1
3 MATERIALS
C2 G1 C4 C3 C3 C2 Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
SEE LIFT'S BEAM DETAIL Round bars: R 235MPa
600
S1 S1 S1
G1
G1
G1
G1
G1 G1 G1
20
G7A
G7A
G7A
G7A
2
C2 C2 C2 C2
81
81
S2
180
G2
G2
C4 C4
535
G2 G2 G2
119.5
G7
G7
G7
G7
S2 S2 S2
G1 G1 G1
4 Short columns to protect reinforcement for future stories
C2 S2 C3 C3 C2
90
G2
S1 FUTURE STAIR
200 S1 +12.35 FL S1
600
600
G1
G1
G1
G1
+12.30 CL
12cm thk
G2
C4 S2 C4 C4
G2A
180
200
180
S20
2335
G1 G1
3 Short columns to protect reinforcement for future stories
C2 G1 C4 C3 C3 C2
S2 S2 S2
G7
G7
G7
SEE LIFT'S BEAM DETAIL
210
COLUMN
G7
G2 G2 G2
2F-RF DIMENSION Nb
C2 35x35 12
C3 40x40 4
600
+-.-- FL
+13.50 CL C4 20x20 4
20cm thk
LIFT ROOF
Ref: Clear height for lift's top BEAMS DIMENSION BL TL
slab: 4.1m/+9.20 G1 20x50HT +8.65 +9.15
RB22 in U shape to provide G2 20x40HT +8.75 +9.15
for Hoocking with numbers G2A 20x40HT +8.75 +9.15
and position as provided by G7 20x40HT +8.75 +9.15
2 lift's spec.
(cm) BL: Bottom level
TL: Top level
(Indication otherwise)
Short columns to protect reinforcement
SLAB THICKNESS
S1 12
S2 12
535
(cm)
MATERIALS
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa
35
35
90
90
35 35
60
197.5
127.5
160
90
35
35
60
90
90
35
35
35 90 35
160
35 127.5 35
197.5
STUMP STUMP
STUMP
30 35 35
35
35
30
90
90
74
30 35 35
50
50
85
85
85
125
125
135
8T20 8T20
+0.00 G.LEVEL +0.00 G.LEVEL +0.00 G.LEVEL
185
185
4T16
185
R8@10 R8@10
40
40
50
60
60
60
35Dia
35Dia
50
50
30
55
55
5T16 T16@15 T16@15
70 160 197.5
PILE 30x30x12m PILE 30x30x12m PILE 30x30x12m
Qall=27.5t Qall=27.5t Qall=27.5t
MATERIALS
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa Name: Rev Page
PILE CAP DETAIL 0 R01
PILE CAP - PC6 PILE CAP - PC8
Scale 1:30 Scale 1:30
nb=7 nb=3
35
35
35 40
250
160
180
40
90
35
35
35 90 125
250
35
35 90 125
250
STUMP
STUMP
35 40
40
35
90
90
74
35 40
+0.85 CL +0.85 CL
50
50
85
85
120
120
8T20 4T20+8T16
+0.00 G.LEVEL +0.00 G.LEVEL
185
185
R8@10 R8@10
35
35
T12@15
T10@15
-0.35 CL -0.35 CL
T10@15 T10@15
65
65
65
65
30
35Dia
35Dia
30
-1.00 CL -1.00 CL
55
55
T20@15 T20@15
160 250
PILE 30x30x12m PILE 30x30x12m
Qall=27.5t Qall=27.5t
MATERIALS
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa Name: Rev Page
PILE CAP DETAIL 0 R02
PILE CAP - PC68 LIFT PIT
Scale 1:30 Scale 1:30
nb=1
250
25 200 25 90
70
T12@15
160
20
20
C4 C4
200
360
360
180
180
LIFT PIT
40
15 20 180 20 15
20 180 20
80
160
160
40
40
20
20
C4
40
40 C3
80
70
STUMP
C3
STUMP
C4
40
25 200 115
90
40
20
74
74
340 6T16
40
20
10
+0.85 CL
LIFT PIT
50
85
145
145
6T16 4T20+8T16
+0.00 G.LEVEL
R8@10
95
210
60
R8@10
15 20 T12@15
125 -0.60 CL
T10@15
65
65
30
35Dia
-1.25 CL
55
T20@15
340
PILE 30x30x12m
MATERIALS
Qall=27.5t
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa Name: Rev Page
PILE CAP DETAIL 0 R03
RC COLUMN LIST
30 35 40
20
30
35
40
20
GF TO TOP ROOF
MAIN BARS: 4T16 MAIN BARS: 8T20 MAIN BARS: 4T20+8T16 MAIN BARS: 6T16
LINK: R8@15 LINK: R8@10-15 LINK: R8@10-15 LINK: R8@15
STIRRUP: - STIRRUP: R8@10-15 STIRRUP: R8@10-15 STIRRUP: -
30 35 40
20
30
35
40
20
STUMP COLUMN
MAIN BARS: 4T16 MAIN BARS: 8T20 MAIN BARS: 4T20+8T16 MAIN BARS: 6T16
LINK: R8@15 LINK: R8@10-15 LINK: R8@10-15 LINK: R8@15
STIRRUP: - STIRRUP: R8@10-15 STIRRUP: R8@10-15 STIRRUP: -
MATERIALS
Concrete: fck=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa Name: Rev Page
COLUMN DETAIL 0 R01
RC BEAM LIST FOR GROUND BEAMS (cm)
MARK GB1 (20x50) GB1A (20x50) GB2 (20x40) GB7 (20x40) GB7A (20x30)
POSITION BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS BOTH ENDS
20 20 20 20 20 20 20 20
30
40
40
40
50
50
50
50
BEAM SECTION
L L
TOP BAR 6T16 3T16 6T16 3T16 5T16 2T16 5T16 3T16
BOTTOM BAR 3T16 6T16 3T16 6T16 2T16 4T16 2T16 2T16
SKIN REIN. - - - - - - - -
TIE BAR - - -
MATERIALS
Concrete: f'c=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa
5 5 5 5 5
L1/8 L1/8 L2/8 L2/8
L1/4 L1/2 L1/4 L2/4 L2/2 L2/4
L1 L2 L3
MARK G1 (20x50) G1A (20x50) G2 (20x40) G2A (20x40) G4 (20x30) G7 (20x40) G7A (20x30)
POSITION BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS BOTH ENDS
20 20 20 20 20 20 20 20 20 20 20 20
30
30
30
40
40
40
40
40
50
50
50
50
BEAM SECTION
L L
TOP BAR 6T16 3T16 6T16 3T16 5T16 2T16 2T16 2T16 4T16 2T16 5T16 3T16
BOTTOM BAR 3T16 6T16 3T16 9T16 2T16 4T16 2T16 4T16 2T16 3T16 2T16 2T16
SKIN REIN. - - - - - - - - - - - -
STIRRUP R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@15 R8@15
TIE BAR - - - - -
MATERIALS
Concrete: f'c=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa
5 5 5 5 5
L1/8 L1/8 L2/8 L2/8
L1/4 L1/2 L1/4 L2/4 L2/2 L2/4
L1 L2 L3
MARK G1 (20x50) G1A (20x50) G2 (20x40) G2A (20x40) G7 (20x40) G7A (20x30)
POSITION BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS BOTH ENDS
20 20 20 20 20 20 20 20 20 20
30
40
40
40
40
40
50
50
50
50
BEAM SECTION
L L
TOP BAR 6T16 3T16 6T16 3T16 5T16 2T16 2T16 2T16 5T16 3T16
BOTTOM BAR 3T16 6T16 3T16 9T16 2T16 4T16 2T16 4T16 2T16 2T16
SKIN REIN. - - - - - - - - - -
STIRRUP R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@10
TIE BAR - - - -
MATERIALS
Concrete: f'c=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa
5 5 5 5 5
L1/8 L1/8 L2/8 L2/8
L1/4 L1/2 L1/4 L2/4 L2/2 L2/4
L1 L2 L3
MARK G1 (20x50) G1A (20x50) G2 (20x40) G2A (20x40) G7 (20x40) G7A (20x30)
POSITION BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS CENTER BOTH ENDS BOTH ENDS
20 20 20 20 20 20 20 20 20 20
30
40
40
40
40
40
50
50
50
50
BEAM SECTION
L L
TOP BAR 6T16 3T16 6T16 3T16 5T16 2T16 2T16 2T16 5T16 3T16
BOTTOM BAR 3T16 6T16 3T16 9T16 2T16 4T16 2T16 4T16 2T16 2T16
SKIN REIN. - - - - - - - - - -
STIRRUP R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@15 R8@10 R8@10
TIE BAR - - - -
MATERIALS
Concrete: f'c=30MPa cylinder
Deformed bars: T 390MPa
Round bars: R 235MPa
5 5 5 5 5
L1/8 L1/8 L2/8 L2/8
L1/4 L1/2 L1/4 L2/4 L2/2 L2/4
L1 L2 L3
3 3
Direction)
Lx (Short Direction )
1 1
2 2
1
2
Lx/4
3 3
3 1 2 3 1 2
Ly (Long
Direction)
LEGEND:
Bottom bar
Top bar
MARK GX (20x30)
20
GX 20 20
30
30
BEAM SECTION
GX
180
ELEVATOR
TOP BAR 4T16 2T16
SKIN REIN. - -
TIE BAR -
20
GX
MATERIALS
Concrete: f'c=30MPa cylinder
LIFT ELEVATOR requirement: Deformed bars: T 390MPa
Round bars: R 235MPa
GX is at Every mid-level or at
maximum spacing 2.5m
between each.
5
12
206.5
15
238 118
380
380
264
203 296.5
10
+5.40F +5.40F
353.5
12
315
15
125.5 492
15
360
177
450
T10@10
15
T10@20
540
15
73 115
360
15
T10@10
+0.90F +0.90F
175
T10@20
15
95
+0.00
15
-0.05
OUT-DOOR STAIR DETAIL T10@10
T10@20
IN-DOOR STAIR DETAIL
Scale 1:50 Scale 1:50