NAIKT/
a HOSPITAL TAWAU, TAWAU, SABAH (REKA & BINA)
This Volume forms Part of the Contract Documer
TABLE OF CONTENTS
nt No.: JKRIP/CKUB/74/2017 and Is to be read
together with other Volumes listed below:-
JILID 5A
JILID 5B
JILID 5 DARI 9
JILID 5B.1
JILID 5B.2
JILID §B.3
GEOTECHNICAL WORKS
GOVERNMENT'S REQUIREMENTS
7 SA.1_ GEOTECHNICAL WORKS BRIEF
5A2 STANDARD SPECIFICATION FOR BUILDING WORKS (EDITION 2014)
5A3 NON-COMPLIANCE REQUIREMENT (NCR) ABSTRACT FOR
GEOTECHNICAL WORKS
| SA4—NEED-STATEMENT-FOR-GEOTECHMIEAEWORK =
5A5 INDEPENDENT CHECKER REPORT <>,» / lakes dt Cob
CONTRACTOR'S PROPOSAL
DESIGN CONCEPT
5B.1.1 Geotechnical Works Design Criteria _/ ~,
5B.1.2 Design Calculation
5B.1.3 Soil Investigation Report
SREY IC ord (hn
Fabs 20 €
IDRAWINGS
5B.3.1_List of Drawing
§B.3.2 Geotechnical Works Drawings
3.3 Consultant Company Profile ;
7 aa Organisation Chart, Curriculum Vitae & Professional Certificate for Key
lum Vitae of Independent Checker -
se earSice Drawings with Endorsement of Professional Engineer with
68.37