ASPEN VISION DEVELOPMENT SDN BHD Doc. Ref.

: AVD/PD/DWW
Rev. No. : 0
FORM
ISO Issue Date : 15TH SEPT 2017
DOOR & WINDOW INSPECTION CHECKLIST Page : 1 of 1

Project :

Project Ref. : Location : :

Contractor : Drawing Ref. : :

Block/Unit No. : Date & Time :

No. Items to be checked Acceptability Remarks


YES NO
1 As per approved supplier and sample material
2 Free from splits, cracks and termite attack
3 Type, size, squareness and grove line
4 Position, verticality, alignment and level
5 Lintol (Min 150mm projection)
6 Consistent gap between frame and door leaf
7 Door swing position
8 Frames are securely fixed in brick using fish tail
9 No visible gap between frame and wall
10 No sags, warps on door/window leaf
11 Ease in opening and closing
12 Aluminium frame to be wrapped with tape
13 Metal door frames are not dented and free from
corrosion
14 No hollowness is detected in metal frame
15 Properly protected against weather or damage
16 No mortar droppings and paint drips on frame and leaf

STATUS : YES - Acceptable NO – Unacceptable


Non-Conformance : Correction :

Re-inspection : Remarks :

Checked By : [Consultant’s Rep.] Verified By : [Client’s Rep.]

Signature : ………………………. Signature : ……………………….

Name : Name :

Date : Date :