Mifos® – Pilot and Rollout Plan

TECHNOLOGY FOR MICROFINANCE

Introduction
This document covers the pilot and rollout of Mifos for the __________ Microfinance institution. The
Pilot will cover rolling Mifos out to ___ branches over ___ weeks/months. Upon successful completion
of the pilot the rollout will cover ____ branches within ____ weeks/months.

Roles & Responsibilities


The following individuals are involved with the rollout
 Please indicate if individuals are involved with just the pilot, rollout or both
 Branch participants are identified later in this document.
 Rollouts should include a representative from each of the major departments affected by the
rollout (Generally IT, Operations and Accounting)

PILOT AND ROLLOUT LEADS

Name Title Role & Responsibilities Pilot/Rollout


Participation
(sample) John Doe MFI IT Manager Oversee project, run data Pilot & Rollout
migrations, provide head office
support

TEAM MEMBERS

Name Title Role & Responsibilities Pilot/Rollout


Participation

Schedule
This is a general overview of the schedule. Detailed schedule should be built in another program like MS
Project. Please review sample schedule for more ideas.

PILOT

Task Owner(s) Participants Start Date End Date


Mifos® – Pilot and Rollout Plan
TECHNOLOGY FOR MICROFINANCE
Rollout to xxx Branch 1-4 12-27-09 12-29-09
Rollout to Group #1 Branch 1, Branch 2 1-15-10 1-30-10
Rollout to Group #2 Branch 3, Branch 4 2-1-10 2-15-10
Post rollout evaluation1 n/a

ROLLOUT
Task Owner(s) Participants Start End Date
Date
Train Remaining Branch Staff ??? [Need Trainers and Feb-08 Feb-10
before rollout participating branches]
Rollout to Group 1 ??? [List Branches] Mar-29 Apr-02
Rollout to Group 2 ??? [List Branches] Apr-05 Apr-09
Rollout to Group 3 ??? [List Branches] Apr-12 Apr-16
Rollout to Group 4 ??? [List Branches]

Rollout Process
When rolling out to a selected set of branches, the following steps are taken (below is a sample, please
change to your own process).

DEPLOYMENT PROCESS
Task Owner Scheduling
Run Data Migration script for IT Department – John Doe Weekend before rollout begins
selected branches
Enter Collections and other MIS Branch Staff Week of rollout
tasks
Assist branch staff on-site Rollout Team – Support Mon and Tues of rollout week
Member
Monitor and Validate Reports at Branch Manager Week of rollout
Branch
Monitor and Validate Reports at Operations Manager, IT Week of Rollout
HO Manager, Accounting Manager
Determine Success of rollout Rollout team Friday, last day of rollout
period

1
Post Rollout Evaluation involves reviewing the lessons learned during the rollout period and updating business
processes, rollout procedures, fixing data migration issues, fixing reporting issues, etc before beginning next step in
rollout. It is advised to schedule in an extended period after a live test and pilot for this step. During the actual
rollout it is expected this is ongoing and does not need an extended period as it is expected most major issues
would have been identified and resolved beforehand.
Mifos® – Pilot and Rollout Plan
TECHNOLOGY FOR MICROFINANCE
ROLLBACK PROCESS
Task Owner Scheduling

Risks
Risk Mitigation

Supporting Documents
Document/Tool Description Location
Production Server https://

Results
The following sections are here for demonstrative purposes. It is recommended that you use the google
doc templates for collaborative purposes or excel templates if offline editing is preferred/necessary.

Upon submitting this document for review, you can export the results from google docs into excel
format.

ISSUES
List all comments, bugs and issues found during the pilot and rollout. The same document should be
used for the live test, pilot and rollout.

Google Doc Template


link: https://spreadsheets.google.com/ccc?
key=0AmKV049R8sT0dFFhRjZIMmdrTGpZcjVmNFRXRTFHbEE&hl=en
Mifos® – Pilot and Rollout Plan
TECHNOLOGY FOR MICROFINANCE
Form Sample: https://spreadsheets.google.com/a/grameenfoundation.org/viewform?
formkey=dFFhRjZIMmdrTGpZcjVmNFRXRTFHbEE6MA

Submission:
When staff are submitting issues, they need to provide the following (required marked in *):
 Date and time issue was found * (automatically added in google doc format)
 Reporter Name *
 URL (if applicable)
 Account ID (Client or System ID where the issue can be looked at)
 Description *

Tracking Details:
These details are used for managing and resolving those issues found
 Severity – How bad is the problem
 Priority – How important is it to resolve the issue
 Owner – Who is resolving the issue
 Status – Status of the resolution
 Bug ID - Used to link the issue to a bug if one is filed
 Resolution – Notes on how the issue was resolved, if at all
 Notes

VALIDATION
During rollout it is important to validate that it was successful. Create an excel template to use as a
checklist to track the validation for each branch. You may want to create multiple checklists covering
validation from the headquarters or different roles at the participating branch.

The checklist should cover things like

 Business Processes
 Reports
 Data Validation between current MIS and Mifos

Review sample for further insight.

Note: During training it is important to stress with all participating staff what will be expected of them
during the pilot and rollout. Key is indicating that they will be doing operations in parallel with your
current MIS and Mifos.

ROLLOUT PROGRESS
TBD

FAQ
Mifos® – Pilot and Rollout Plan
TECHNOLOGY FOR MICROFINANCE
See <insert link> for commonly asked questions about planning and executing a rollout.