Teknik Produksi II
(3 SKS)
Praktek/latihan soal
Gas Lift Design
4 8 12 16 20
Gb. 1a. Hubungan Tekanan dengan gradien tekanan sgb fungsi SG-gas
Gb. 1b. Hubungan Tekanan dengan gradien tekanan sgb fungsi SG-gas (lanjutan)
END OF LECTURE
GAS LIFT WELL KICK-OFF
• Unload well carefully
– 50 - 100 psi (3.5 bar) per 10 min
– 1 - 2 bbl per min
• Maximize production choke opening
• Gradually increase gas injection rate
• Monitor well clean up and stability
• Get to target position
• Perform step rate production test
• Optimize gas injection rate
• Note - when unloading all valves open!
QUESTIONS ?