CONTOH SOAL

Temp di surface = 109 oF


Temp @ 8000 ft = 170oF
Tekanan Kick off kompresor = 1000 psig
Buat disain Gas Lift tsb
DISAIN GAS LIFT
DISAIN GAS LIFT
DISAIN GAS LIFT
DISAIN GAS LIFT
DISAIN GAS LIFT
KE Brown,” The Technology of Artificial Lift Methods“,
PennWell Books, Tulsa, Oklahoma, USA, Vol 2a, page 226
DISAIN GAS LIFT
DISAIN GAS LIFT
DISAIN GAS LIFT
DISAIN GAS LIFT
DISAIN GAS LIFT
Hitung ukuran port size
(KE Brwon 2a, hal 229)
Dr gb 3.1.C
DISAIN GAS LIFT
DISAIN GAS LIFT
Gb. 9 R factor untuk masing-2 port size
Gb. 9 R factor untuk masing-2 port size
Gb. 9 Ukuran bellows
Gb. 9 Ukuran bellows
Tabel-1 utk penentuan Ct
DISAIN GAS LIFT
DISAIN GAS LIFT
DISAIN GAS LIFT
DISAIN GAS LIFT
4 8 12 16 20

4 8 12 16 20
Gb. 1a. Hubungan Tekanan dengan gradien tekanan sgb fungsi SG-gas
Gb. 1b. Hubungan Tekanan dengan gradien tekanan sgb fungsi SG-gas (lanjutan)
END OF LECTURE
GAS LIFT WELL KICK-OFF
• Unload well carefully
– 50 - 100 psi (3.5 bar) per 10 min
– 1 - 2 bbl per min
• Maximize production choke opening
• Gradually increase gas injection rate
• Monitor well clean up and stability
• Get to target position
• Perform step rate production test
• Optimize gas injection rate
• Note - when unloading all valves open!
QUESTIONS ?