ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) OF NEW COAL


UNLOADING JETTY AND ASSOCIATED BULK MATERIAL HANDLING SYSTEM AT 1X1000MW COAL FIRED
POWER PLANT

TITLE

Welding Procedure Specification (WPS) And Procedure Qualification Record (PQR)


For
Fabricator of Steel Structure

Date Document Number Rev.

April 26, 2018 CUJ-CHTG-B4-50EAC-10112 0

Revision History
Rev. Revision Date Prepared by Reviewed by Approved by Description
A 14.08.17 Hazime Gavakar Ravi For Approval
B 06.11.17 Hazime Abhishek Ravi For Approval
C 21.11.17 Hazime Abhishek Ravi For Approval

Approval
Rev. Originator Checked Approved Project Manager Employer

0 Hazime Abhishek Ravi Murugan


Table of Contents
1. WPS-PQR – 007-R1 – Combination SMAW & FCAW – 3G

2. WPS – PQR – 008 -10 – Combination SMAW & FCAW – 4G


Table of Contents
1. WPS-PQR 004-08-R2 – FCAW – 3G & 3F

2. WPS – PQR – 008 -10 – Combination SMAW & FCAW – 4G (if applicable for site

works)
1. WPS-PQR 004-08-R2 – FCAW – 3G & 3F
1. WPS-PQR-008-10-Combination SMAW & FCAW -4G