You are on page 1of 4

Installation Instructions for:

Statim Solenoid Valve Kit 2000 & 5000

DCI 2910 & 2911

305 N. Springbrook Road, Newberg, OR 97132 USA • 503.538.8343 • 800.624.2793 Page 1 of 4


www.dcionline.com 92342, Rev. C, 08/13
Statim unit with cover removed
(Statim 2000 unit shown, 5000 model will look slightly different)

305 N. Springbrook Road, Newberg, OR 97132 USA • 503.538.8343 • 800.624.2793 Page 2 of 4


www.dcionline.com 92342, Rev. C, 08/13
4

7
(Statim 2000 unit shown, 5000 model will look slightly different)

305 N. Springbrook Road, Newberg, OR 97132 USA • 503.538.8343 • 800.624.2793 Page 3 of 4


www.dcionline.com 92342, Rev. C, 08/13
6

(Statim 2000 unit shown, 5000 model will look slightly different)

1. Turn power to Statim off.


2. Remove cassette to depressurize residual steam pressure for safety.
3. Wait until Statim is cool (approx. 20 minutes).
4. Disconnect copper tubing.
5. Disconnect plastic tubing.
6. Disconnect wires from connector on circuit board.
7. Remove existing solenoid assembly and sheet metal bracket.
8. Reconnect solenoid assembly using new parts including new copper tubing and
connect wires to circuit board.

305 N. Springbrook Road, Newberg, OR 97132 USA • 503.538.8343 • 800.624.2793 Page 4 of 4


www.dcionline.com 92342, Rev. C, 08/13

You might also like