Cathod Protecton 2 1 1 2.4 FAN 0.2 Tank stair 0.7 1 0.5 2 0.4 eyewash FAN 1 1.5 0.5 1 No PS-D6-013 4 0.2 No 3.5 No PS-D6-014 4 0.2 No 3.5 No PS-D6-015 4 0.2 No 3.5 No PS-D6-019 7 0.3 No 6 No PS-D6-018 10 0.5 No 8 No PS-D6-019 10 0.5 No 8 No ps 21,22,23,26,27 4 No 0.5 2 No Total amounts 46.7 3.5 36.5 5.4 3
length (M) widthed (M) thickness (M) amount of date
west line of dike wall soil(M3) sub grade 82 7.6 0.2 124.62 first layer 82 7.6 0.2 124.63 in FEB 2018 second layer 82 7.1 0.2 116.44 third layer 82 6.6 0.2 108.24 fourth layer 81 6.1 0.2 98.82 sixth layer 81 5.6 0.2 90.72 IN Mar 2018 seventh layer 80 4.6 0.2 73.6 eighth layer 0 0.2 0 ninth layer 0 0.2 0 Total amount 737.07 * note / in Feb 2018 poured 2 pieces of slab dike wall and amount of concrete = 4.5 M3