polyethlene

sheet m2
1

6.25

2
2

2
6
6

4
37.25
the summary works for BR in jun 2018

Name excavation m3 blinding m3 concrete m3 backfillind m3 coating m2


Cathod Protecton
2 1 1 2.4
FAN 0.2
Tank stair 0.7 1 0.5 2
0.4
eyewash FAN 1 1.5 0.5 1
No
PS-D6-013 4 0.2 No 3.5 No
PS-D6-014 4 0.2 No 3.5 No
PS-D6-015 4 0.2 No 3.5 No
PS-D6-019 7 0.3 No 6 No
PS-D6-018 10 0.5 No 8 No
PS-D6-019 10 0.5 No 8 No
ps 21,22,23,26,27 4 No
0.5 2 No
Total amounts 46.7 3.5 36.5 5.4
3

length (M) widthed (M) thickness (M) amount of date


west line of dike wall soil(M3)
sub grade 82 7.6 0.2 124.62
first layer 82 7.6 0.2 124.63 in FEB 2018
second layer 82 7.1 0.2 116.44
third layer 82 6.6 0.2 108.24
fourth layer 81 6.1 0.2 98.82
sixth layer 81 5.6 0.2 90.72 IN Mar 2018
seventh layer 80 4.6 0.2 73.6
eighth layer 0 0.2 0
ninth layer 0 0.2 0
Total amount 737.07
* note / in Feb 2018 poured 2 pieces of slab dike wall and amount of concrete = 4.5 M3