sistema abierto o ramificado

datos Qn = 1.171875
poblacion futura 1125 Qmh = 1.7578125
dotacion 90 Qunit = 0.0015625

SOLUCION

CALCULO DE LOS GASTOS POR TRAMO CALCULO DE LA RED DE DISTRIBUCION


1 2 3 4
N°HAB. GASTO (L/S) LONG
TRAMO POBLACION GASTO TRAMO TRAMO DISEÑO (m)
FUTURA RES-A 0 1.758 60
A-B 122 0.190625 A-B 0.191 1.758 125
B-C 161 0.2515625 B-C 0.252 0.747 97
C-D 160 0.25 C-D 0.250 0.250 67
C-E 157 0.2453125 C-E 0.245 0.245 105
B-RP 100 0.15625 B-RP 0.156 0.820 109
RP-F 103 0.1609375 RP-F 0.161 0.664 98
F-G 119 0.1859375 F-G 0.186 0.186 86
F-H 105 0.1640625 F-H 0.164 0.317 100
H-I 98 0.153125 H-I 0.153 0.153 120
TOTAL 1125

Qp=
5 6 7 8 9 10 11 12
DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PIEXOMETRICS COTA TERRENO
(pulg) (m/s) Unit(%) Tramo (m) inicial final inicial final
1.5 1.542 72.91440286 4.37486417 2462 2457.62514 2462 2443
1.5 1.542 72.91440286 9.11430036 2457.62514 2448.51084 2443 2432
1.5 0.655 14.96658669 1.45175891 2448.51084 2447.05908 2432 2430
1 0.493 14.20938056 0.9520285 2447.05908 2446.10705 2430 2434
1 0.484 13.72042407 1.44064453 2446.10705 2444.6664 2430 2424
1.5 0.720 17.80228987 1.9404496 2444.6664 2442.72595 2432 2412
1.5 0.582 12.04205697 1.18012158 2412 2410.81988 2412 2392
1 0.367 8.217033479 0.70666488 2410.81988 2410.11321 2392 2369
1 0.626 22.07094091 2.20709409 2410.81988 2408.61278 2392 2385
1 0.302 5.737483081 0.68849797 2408.61278 2407.92429 2385 2372
13 14
PRESION
inicial final
0 14.6251358
14.6251358 16.5108355
16.5108355 17.0590766
17.0590766 12.1070481
16.1070481 20.6664035
12.6664035 30.7259539
0 18.8198784
18.8198784 41.1132135
18.8198784 23.6127843
23.6127843 35.9242864